UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Aug-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Additional change made regarding CCR 8507, the section has been updated to clarify requirements for surplus soil disposal at Camp Lejenue (1.4.6.1.2). In response to CCR 8833, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under SD-01 and in paragraph "Notice of Construction (NOC) and Notice of Completion" (1.5.3.6).
Aug-2020 N UFGS 01 58 00 Project Identification C 1 In response to CCR 8950, revised Specifier Note in paragraph Quality Control (1.3) for additional guidance.
Aug-2020 N UFGS 07 21 13 Board and Block Insulation C 2 In response to CCR 8689, updated phrasing used in SPECIAL WARRANTIES (1.8) for the start of the warranty period to include "or Substantial Completion".
Aug-2020 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 2 In response to CCR 8741, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 2 In response to the following CCRs: 8742, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01; and 8779, added Specifier Note and dry film thickness requirements to paragraph "Installation of Fluid-Applied Membrane Air Barrier" (3.3.3) .
Aug-2020 N UFGS 07 27 36 Spray Foam Air Barriers C 2 In response to CCR 8743, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 41 13 Metal Roof Panels C 3 In response to CCR 8778, updated supporting steel tolerances to reflect industry standards in paragraph "Erection Tolerances" (3.8.1).
Aug-2020 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 4 In response to CCR 8748, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 08 71 00 Door Hardware C 3 In response to CCR 4895, the Specifier Note in "Locks and Latches" (2.3.5) has been revised to reflect the latest door locking system specified in the Unaccompanied Housing FC.
Aug-2020 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System C 2 In response to CCR 6045, replaced "Vulkem 245" with "Stoneflex MP7" in Table II for Vendor Stonhard's sealant.
Aug-2020 N UFGS 09 90 00 Paints and Coatings C 5 In response to the following CCRs: CCR 3281, corrected metric equivalent measurements in "Existing Surfaces with a Bituminous or Mastic-Type Coating" (3.5.6), "Concrete and Masonry" (3.6.1), and "New[, Existing Uncoated,][ and ][Existing Coated] Plywood and Wood Surfaces, Except Floors" (3.7.1); CCR 4282, added the options of corrosive environments to "Exterior Paint Tables" (3.15.1), EXTERIOR GALVANIZED SURFACES, "G" and "H"; CCR 6392, removed references to SCS Global; CCR 6869, removed "MPI 7" from References and replaced "MPI 7" with "MPI 6" in "Exterior Paint Tables" (3.15.1), Division 6 "A"; and CCR 8722, capitalized "Contractor" throughout.
Aug-2020 N UFGS 10 22 26.13 Accordion Folding Partitions C 2 In response to CCR 8746, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 10 22 26.23 Coiling Partitions C 2 In response to CCR 8747, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Nov-2020 N UFGS 01 20 00 Price and Payment Procedures N New Unified Section; Superseding UFGS 01 20 00.00 20 and UFGS 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
Nov-2020 N UFGS 23 81 23 Computer Room Air Conditioning Units N New Unified Section; Supersedes UFGS 23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
Nov-2020 N UFGS 31 62 16.13 Steel Pipe Piles N New UFGS section to address furnishing, installing and testing of steel pipe piles.
Nov-2020 N UFGS 31 62 50 Densified Aggregate Piers N New UFGS to address the design and construction of densified aggregate piers.
Nov-2020 N UFGS 31 63 26.60 [Grouted] Helical Piles N New UFGS to address [grouted] helical piles.
Nov-2020 N UFGS 25 08 11.00 20 Risk Management Framework for Facility-Related Control Systems N This guide specification covers the Navy requirements to support the Risk Management Framework (RMF) Authority to Operate (ATO) Process for Facility-Related Control Systems.
Nov-2020 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar N New crane section developed specifically for aircraft hangars.
Nov-2020 N UFGS 23 81 23.00 20 Computer Room Air Conditioning Units D Superseded by UFGS 23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS (unified). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 01 14 00 Work Restrictions C 11 Updated Additional Personnel Requirements (1.5.1.2) and subparagraph to clarify work restrictions for secure facilities. Incorporated the following CCRs: CCR 9027, revised General Note in relation to tailoring options included in the section; CCR 9028, corrected tailoring in Part 1; and CCR 9029, corrected subpart hierarchy by moving "Unarmed Escort Services" paragraph into "CONTRACTED SERVICES FOR NBK BANGOR, SILVERDALE, WA. (1.16).
Nov-2020 N UFGS 31 62 13.26 Pressure-Injected Footings R Major revision to align with current industry practice.
Nov-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures D Superseded by new unified section, UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 13 Special Project Procedures R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 26 Governmental Safety Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 45 35 Special Inspections R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 31 62 13.24 Concrete Cylinder Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 16.16 Steel H-Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 19 Timber Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 01 78 23 Operation and Maintenance Data C 1 In opening note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20 FACILITY eOMSI
Nov-2020 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 2 In opening Note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20, and updated Facility Data Workbook.
Nov-2020 N UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures R Section has been unified. New number and title (was 26 55 80.00 20 SURGICAL LIGHTING FIXTURES). Revised language throughout specification to replace indicative language with imperative language. Reformatted paragraphs and subsequent numbering to reflect removal of out-of-date information and/or addition of up-to-date information per latest industry standards.
Nov-2020 N UFGS 01 58 00 Project Identification C 2 [Update 3/18/21: per CCR# 9845, reference to ARRA has been removed from the sign details in all Related Materials.] Updated both the Specifier Note under PROJECT IDENTIFICATION SIGN (1.4) and the Related Materials (PDF/ZIP attachments)
Nov-2020 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks C 1 (UFGS-33 01 50.60) In response to CCR 7720, paragraph "TANK CLEANING" (3.7) has been updated.
Nov-2020 N UFGS 33 52 10 Fuel Systems Piping (Service Station) C 1 Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 2 Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 1 Updated Reference Article and paragraphs "Weld Inspector Certification" (1.9.4), "Qualifications of API Std 653 Inspector" (1.9.7), "Mechanical Tape Level Gauge" (2.13.5) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) C 1 Updated paragraph "Filters" (2.29.1.3).
Feb-2021 N UFGS 01 20 00 Price and Payment Procedures C 1 In response to CCR 9618, reference to FAR 32.503-6 has been replaced with "FAR 32.103 Progress payments under construction contracts" in paragraph (1.7.1) "Obligation of Government Payments" .
Feb-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 6 In response to CCRs 9429 and 9621, removed reference to DoD Manual 5200.01-V4 and all FOUO designations; replaced "FOUO - For Official Use Only" with "CUI Controlled Unclassified Information" throughout; and changed CLASS heading in Table 1 to "DESIG" (designation).
Feb-2021 N UFGS 01 45 00.00 20 Quality Control C 8 In response to the following CCRs: 8956 - add reference to UFGS Section 01 32 16.00 20; and 9339 - coordinate commissioning and sustainability with UFGS Sections 01 91 00.15 20 and UFGS 01 33 29.
Feb-2021 N UFGS 01 45 00.10 20 Quality Control for Minor Construction C 3 In response to CCR 8942, "KO" has been replaced with "Contracting Officer" throughout, "Pre-Construction Conference" and "Pre-Construction Meeting" have been tailored for Army and Navy respectively, and various clerical tagging corrections have been made.
Feb-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 1 In response to CCR 6876, the mark for ASTM A615/A615M reinforcing bars was changed from "A" to "S" in paragraph (2.6.1) Reinforcing Bars, list item "b".
Feb-2021 N UFGS 03 45 00 Precast Architectural Concrete C 1 In response to CCR 9837, reference to A, B and C grades were removed from the paragraph "Grout" (2.2.13).
Feb-2021 N UFGS 07 41 13 Metal Roof Panels C 4 In response to CCR 9492, updated paragraph (3.13) WARRANTY by removing "USACE" from the title and requirements for future contracts and arbitration.
Feb-2021 N UFGS 13 34 19 Metal Building Systems C 1 In response to CCR 9491, updated paragraph (3.14) WARRANTY by removing Army tailoring and Specifier Note as well as requirements for future contracts and arbitration.
Feb-2021 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running C 1 Incorporation of cyber security requirements, clarification of testing requirements, and formatting.
Feb-2021 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley C 1 Incorporation of cyber security requirements, clarification of testing requirements, and formatting.
Feb-2021 N UFGS 01 33 29 Sustainability Requirements and Reporting R Revised to align with industry standards; to align with UFC 1-200-02 revision; to combine DB and DBB requirements into a Tri-Service, tailorable spec; and reorganized paragraphs into hierarchical presentation. Titled changed from "SUSTAINABILITY REPORTING" to "SUSTAINABILITY REQUIREMENTS AND REPORTING"
Feb-2021 N UFGS 01 91 00.15 Building Commissioning D Superseded by UFGS-01 91 00.15 20 TOTAL BUILDING COMMISSIONING Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2021 N UFGS 01 91 00.15 20 Total Building Commissioning N Navy-only Commissioning Section superseding UFGS-01 91 00.15 TOTAL BUILDING COMMISSIONING.
Feb-2021 N UFGS 08 71 63.10 Electrical Locking Control for Brigs R Complete review of section.
Feb-2021 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System R Complete review and update.
Feb-2021 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System R Complete review and update.
Feb-2021 N UFGS 09 90 00 Paints and Coatings R Complete review and update.
Feb-2021 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R Revised in response to the following: CCR 9541- title has been changed from "EXTERIOR COATING OF STEEL STRUCTURES" to "HIGH PERFORMANCE COATING FOR STEEL STRUCTURES"; CCR 9540 – 2.2 COATING SYSTEM – to allow 100% shop coating; CCR 9542 – SSPC requirements confirmed; and CCR # 9543 – Added notes to designer to carefully coordinate Division 05 and Division 08 UFGS when used. Indicated that this UFGS is required for coating of components indicated in UFC 4-211-01.
Feb-2021 N UFGS 26 27 14.00 20 Electricity Metering R Complete review and update.
Feb-2021 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R Replacing without change UFGS-33 01 50.60 / Non-technical Section Number change
Feb-2021 N UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks N New section to address the requirements for an out of service Inspection of a Field Fabricated Fuel Storage Tank.
Feb-2021 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems N Reinstate Section Number 23 08 00.00 20. New Navy-only section covering commissioning requirements for HVAC and plumbing systems. This new section does not replace or supersede the section dated 08/08 which covered the requirements for testing, adjusting, and balancing (TAB) of HVAC air and water distribution systems. UFGS-23 08 00.00 20 (08/08) was superseded by UFGS-23 05 93.
May-2021 N UFGS 26 27 14.00 20 Electricity Metering C 1 In response to the following: CCR 937, IEC 60687 has been removed from the Reference Article and the section text; CCR 4620, the accuracy class in potential and current transformers was changed to "0.15" in paragraphs Potential Transformer Requirements (2.1.2) item f. and Current Transformer Requirements (2.1.3) item b.; and CCR 5117, reference to a 'Voltage Requirements' paragraph was removed from paragraph (2.1.5) Disconnect Method, item c.
May-2021 N UFGS 01 11 00 Summary of Work C 1 In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement.
May-2021 N UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear R Complete review and update.
May-2021 N UFGS 03 45 00 Precast Architectural Concrete C 1 In response to CCR 9739, "High-Density Plastic" has been added as the title for paragraph 2.7.6
May-2021 N UFGS 01 14 00 Work Restrictions C 12 In response to CCR 9908, paragraph Shipyard Area Work Clearance Request (1.5.10) has been tailored for Navy.
May-2021 N UFGS 26 27 29 Marina Electrical Work R Complete review and update.
May-2021 N UFGS 01 91 00.15 20 Total Building Commissioning C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems C 1 Changes made to align with NAVFAC policy, and corrections of errors and omissions.
May-2021 N UFGS 26 51 00 Interior Lighting C 1 Changes made to address various CCRs: added new paragraph (1.5.8) "Photometric Plan"; updated Specifier Note in LED Light Sources (2.3.1); updated (2.6.1.1) Exit Signs with Battery Backup and (2.6.6) Central Emergency Lighting System.
May-2021 N UFGS 03 30 00 Cast-In-Place Concrete C 2 In response to the following: CCR 7515, updated ACI 302.1R table references in paragraph (3.10.2) "Flat Floor Finishes"; CCR 7801, revised Specifier Note and list item a. in subparagraph (2.3.1.1) "Portland Cement"; CCR 8263, changed center table heading to "12 months" in subparagraph (2.5.2.4) "Sulfate Resistance" list item c.; CCR 8321, updated list item b. in subparagraph (2.3.1.3) "Fly Ash" and revised subparagraph (2.3.1.4) "Slag Cement"; CCR 8333, updated bar Grades in paragraph (2.6.1) "Reinforcing Bars" list item b. and (2.6.1.2) "Epoxy-Coated Reinforcing Bars" list item a.; CCR 8571, deleted paragraph "Perimeter Insulation" (2.2.6); CCRs 8085 and 8572 added the option “IL portland limestone cement” to subparagraph (2.3.1.2) "Blended Cements" in the Specifier Note and list item a.; CCRs 9127 and 9142, updated list item b. in paragraph (3.5.2) "Vapor Retarder [and Vapor Barrier]", replaced "air temperature" with "concrete temperature" in paragraph (3.6.2) "Mixing" list items b. and c., also added manufacturer's recommended dosage in item d., updated article (3.7) “Placing Concrete” and paragraph (3.10.1) “Finish”, and added new subparagraphs (3.14.1.1) “Fine Aggregate” and (3.14.1.2) “Course Aggregate” under (3.14.1) “Aggregate Testing”.
May-2021 N UFGS 22 00 00 Plumbing, General Purpose C 4 Added "Army" projects to the Specifier Notes under (2.1.1) Pipe Joint Materials, list item t., (3.1.3.6) Copper Tube and Pipe, list item d, and (3.12) TABLE II; added Air Force tailoring to paragraph (2.4.6) No-Water Urinals; NOTES indicating tailoring options added throughout this section.
May-2021 N UFGS 26 20 00 Interior Distribution System C 2 Incorporated CCR changes throughout this section.
May-2021 N UFGS 05 12 00 Structural Steel C 2 In response to CCR 9371, the material strength in paragraph Structural Steel Tubing (2.2.2) was updated to "Grade [C]"
May-2021 N UFGS 26 42 13.00 20 Cathodic Protection by Galvanic Anodes D Superseded by new unified UFGS 26 42 13 GALVANIC (SACRIFICIAL) ANODE CATHODIC PROTECTION (GACP) SYSTEM Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2021 N UFGS 26 42 19.00 20 Cathodic Protection by Impressed Current D Superseded by new unified UFGS 26 42 17 IMPRESSED CURRENT CATHODIC PROTECTION (ICCP) SYSTEM Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2021 N UFGS 26 42 22.00 20 Cathodic Protection System for Steel Water Tanks D Superseded by new unified UFGS 26 42 15 CATHODIC PROTECTION SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2021 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts C 1 Changes made to address various CCRs: added "IEC 61000-3-12" to References and paragraph Power Line Surge Protection (1.3.2.1); replaced reference UL 508C with "UL 61800-5-1"; ASD was changed to "110" percent in list item d. and "IEC" was added to list item r. in article (2.1) ADJUSTABLE SPEED DRIVES ; and article (2.2) ENCLOSURES was updated.
May-2021 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 4 In response to CCR 9422, subparagraph (1.4.6.1.1) Removal of Waste from Camp Lejeune has been updated to reflect the landfill waste policy at Camp Lejeune.
Feb-2021 N UFGS 05 05 20.00 27 Post-Installed Concrete and Masonry Anchors N New section to address the requirements for post-installed concrete and masonry anchors.
Aug-2021 N UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System N New unified section; supersedes UFGS 03 53 14.00 20 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM.
Aug-2021 N UFGS 03 53 14.00 20 Light Reflective Nonferrous Metallic Aggregate Floor System D Superseded by new unified UFGS 03 53 14 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 08 34 16.20 Vertical Lift Fabric Doors R General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.
Aug-2021 N UFGS 23 54 19 Building Heating Systems, Warm Air R Complete revision; supersedes UFGS 23 82 01.00 10 WARM AIR HEATING SYSTEMS
Aug-2021 N UFGS 23 76 00 Evaporative Cooling Systems N New unified section; supersedes UFGS 23 76 00.00 10 EVAPORATIVE COOLING SYSTEMS and UFGS 23 76 00.00 20 EVAPORATIVE COOLING SYSTEM.
Aug-2021 N UFGS 23 76 00.00 20 Evaporative Cooling System D Superseded by new unified UFGS 23 76 00 EVAPORATIVE COOLING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 26 24 13 Switchboards R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter R Complete review and update.
Aug-2021 N UFGS 26 35 44 270 VDC Solid State Converter N New unified section; supersedes UFGS 26 35 44.00 20 270 VDC SOLID STATE GROUND POWER UNIT.
Aug-2021 N UFGS 26 35 44.00 20 270 VDC Solid State Ground Power Unit D Superseded by new unified UFGS 26 35 44 270 VDC SOLID STATE CONVERTER. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2021 N UFGS 26 56 00 Exterior Lighting R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 33 71 02 Underground Electrical Distribution R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 01 11 00 Summary of Work C 2 In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text.
Aug-2021 N UFGS 01 14 00 Work Restrictions C 13 In response to the following CCRs: 9044, added Note to Submittal Article with instructions for Navy Design-Build projects; 9826, updated last sentence in Activity Regulations paragraph (1.5.1) to clarify identifying Contractor equipment; 3976, replaced "must" with "will" or "may" throughout Part 1 as appropriate.
Aug-2021 N UFGS 01 20 00 Price and Payment Procedures C 2 In response to CCR 9972, included timeline requirements for both Schedule of Prices and Earned Value Report and corrected typo in Note in Data Required paragraph.
Aug-2021 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 10208, updated requirements for NAVFAC PAC DB and DBB in Partnering and Mobilization paragraphs.
Aug-2021 N UFGS 01 35 26 Governmental Safety Requirements C 1 In response to CCR 9981, updated Note in APP-Construction paragraph to clarify instructions for NAVFAC PAC DB and DBB project options.
Aug-2021 N UFGS 01 57 19 Temporary Environmental Controls C 5 Added Note to Submittal Article with instructions for Navy Design-Build projects. In response to CCR 10213, updated requirements for NAVFAC PAC DB and DBB in Environmental Protection Plan paragraph.

Pages