History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Nov-2020 | N | Nov-2018 | C | 1 |
Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs. |
Nov-2018 | N | Nov-2018 | R |
Complete review and update including Section title change from SERVICE PIPING FUEL SYSTEMS; Preparing Activity changed from Army to Navy |
|
Apr-2008 | A | Apr-2008 | N |
Superseding UFGS 23 11 13.00 20 Fuel Oil Piping and UFGS 23 11 16.00 20 Fiberglass Reinforced Piping (FRP) Piping (for Petroleum) |