UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 15 19.00 10 Wire Line Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 21 10.00 10 Fiber Optic Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 31 23 00.00 20 Excavation and Fill C 1 Revised subpart 1.6 and table in subpart 2.10
Nov-2013 N UFGS 31 62 19 Timber Piles C 1 Revised subpart 2.1.4
Nov-2013 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement C 1 Revised notes before Part 1 and subparts 2.1.1 and 3.1.2.1. Deleted subparts 1.6.2.1 Hot-Poured Liquid Sealant and 2.1.1.2 Sealant, Joint, Jet-
Nov-2013 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement C 1 Revised subparts 2.5 and 3.3.2.1
Nov-2013 N UFGS 32 12 17 Hot Mix Bituminous Pavement C 1 Revised subparts 1.6.1, 2.2, 2.5.1, 2.5.2, 3.3, 3.5.2.2 and 3.5.2.3
Nov-2013 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities C 1 Added subparts 1.2, 2.1.1.2, 2.1.1.4 and 2.1.2; Revised subparts 1.4, 1.6.2, 2.1.1, 2.1.3, 2.1.3.1, 2.3, 3.3.7, 3.7.5.1, 3.7.5.2 and 3.7.7
Nov-2013 N UFGS 32 13 43 Pervious Concrete Paving C 1 Revised subparts 1.3, 1.5.1 and 3.3.4
Nov-2013 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2013 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type C 1 Revised subpart 2.5.3 and 2.6.2.2
Nov-2013 N UFGS 33 52 90.00 20 Welding for POL Service Piping C 1 Revised subpart 3.3
Nov-2013 A UFGS 33 82 33.00 10 Coaxial Cable Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators C 1 Revised subpart 3.2
Aug-2013 A UFGS 00 31 10 Metric Measurements D Section removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2013 N UFGS 01 33 29.00 20 Sustainable Requirements N NEW; Interim change to 01 33 29, LEED DOCUMENTATION, to include the Guiding Principles, for Navy-use only.
Aug-2013 N UFGS 01 35 26 Governmental Safety Requirements C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
Aug-2013 N UFGS 06 13 33 Pier Timberwork C 1 Modified subpart 2.1.1.2
Aug-2013 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 1 Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg
Aug-2013 A UFGS 07 84 00 Firestopping C 1 Industry input
Aug-2013 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 Modified notes before Part 1 and in subpart 3.6
Aug-2013 S UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 A UFGS 21 30 00 Fire Pumps C 1 CCR 1147, fuel piping specified by NFPA 20
Aug-2013 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 09 23.00 40 Lighting Control Devices R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear N NEW
Aug-2013 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 24 16.00 40 Panelboards R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 26 27 29 Marina Electrical Work C 1 Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note)
Aug-2013 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Modified subparts 1.5 and 3.5 (notes)
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2013 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 2 Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3
Aug-2013 N UFGS 46 23 00 Grit Removal and Handling Equipment C 1 Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6
May-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials R Revised Section Title from RECYCLED / RECOVERED MATERIALS. Also, added Biopreferred Fed
May-2013 N UFGS 03 45 00 Precast Architectural Concrete C 1 Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9
May-2013 N UFGS 05 21 19 Open Web Steel Joist Framing C 1 Modified subpart 2.2.1
May-2013 N UFGS 05 21 23 Steel Joist Girder Framing C 1 modified subpart 2.2.1
May-2013 N UFGS 07 21 13 Board and Block Insulation C 1 modified subpart 1.3
May-2013 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 21 23 Loose Fill Thermal Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 22 00 Roof and Deck Insulation C 1 Modified subpart 1.4.3
May-2013 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 1 modified subpart 1.5.10
May-2013 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 1 modified subpart 1.4.6
May-2013 N UFGS 08 14 00 Wood Doors C 1 Modified subpart1.3
May-2013 N UFGS 08 36 13 Sectional Overhead Doors C 1 Modified subparts 2.2, 2.3, 2.4.1, 2.4.1.1, 2.4.3, 2.5.1, 2.6.4, 2.7
May-2013 N UFGS 09 23 00 Gypsum Plastering C 1 modified subpart 1.3.2
May-2013 N UFGS 09 26 00 Veneer Plaster C 1 Modified subpart 1.4
May-2013 N UFGS 09 29 00 Gypsum Board C 1 Modified subpart 1.3
May-2013 N UFGS 09 64 00 Portable (Demountable) Wood Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 64 66 Wood Athletic Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 90 00 Paints and Coatings C 1 modified subpart 1.4.4
May-2013 N UFGS 10 22 13 Wire Mesh Partitions C 1 modified subpart 1.4
May-2013 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 modified subpart 1.3.4
May-2013 N UFGS 10 22 26.23 Coiling Partitions C 1 modified subpart 1.4
May-2013 N UFGS 12 22 00 Curtains and Drapes C 1 modified subpart 1.5
May-2013 A UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Updated references to sections and paragraphs of ASME A17.1/CSA B44
May-2013 S UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems R Tri-Annual Database Maintenance (TADM) completed
May-2013 N UFGS 22 00 00 Plumbing, General Purpose C 1 modified subpart 2.1
May-2013 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added the option for pneumatic or electric damper operator
May-2013 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 1 modified subpart 1.4.5.3
May-2013 S UFGS 23 82 16.00 40 Air Coils R Tri-Annual Database Maintenance (TADM) completed
May-2013 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 1 modified subparts 2.1.1.11, 2.2 and 2.4.3
May-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) C 1 Inserted NOTES on Impressed Current Anodes and Anode Installation
May-2013 N UFGS 26 56 00 Exterior Lighting R Major revision. Supersedes 26 56 00.00 20
May-2013 N UFGS 26 56 00.00 20 Exterior Lighting D Superseded by UFGS 26 56 00 Exterior Lighting, Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2013 S UFGS 26 56 19.00 40 Roadway Lighting R Tri-Annual Database Maintenance (TADM) completed
May-2013 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
May-2013 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
May-2013 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications N New UFGS Section
May-2013 A UFGS 33 40 00 Stormwater Utilities C 2 Added requirements for use of Polypropylene (PP) Pipe
Feb-2013 A UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels N New UFGS section
Feb-2013 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning N Superseding UFGS 07 27 00.45 10 Building Air Barrier System
Feb-2013 A UFGS 07 27 00.45 10 Building Air Barrier System D Superseded by UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Title revision and complete update
Feb-2013 A UFGS 09 65 00 Resilient Flooring C 1 Adjusted sustainability requirements
Feb-2013 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems R Revised vapor barrier and insulation requirements.
Feb-2013 A UFGS 23 11 25 Facility Gas Piping C 1 Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements
Feb-2013 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 1 Modified subpart 1.6 and notes before part 1
Feb-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) R Complete update.
Feb-2013 S UFGS 26 51 00.00 40 Interior Lighting R Updated the entire section
Feb-2013 S UFGS 26 56 36.00 40 Flood Lighting R Tri-Annual Database Maintenance (TADM) completed
Feb-2013 N UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines C 1 Removed fiberglass piping, and added CSST and EFV
Feb-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 1 Modified subpart 2.7.3.1
Feb-2013 N UFGS 46 43 21 Circular Clarifier Equipment C 2 Modified subpart 2.2.3.2