UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Nov-2018 N UFGS 09 22 36 Lath C 2 Added requirements for accessories, hangers, and wires, in high humidity and ESC C3-C5 locations, and straps or rods in locations subject to violent storms.
Nov-2018 N UFGS 09 23 00 Gypsum Plastering C 1 Added mix requirement for acoustical plaster finish coat in high humidity ad ESC C3-C5 locations.
Nov-2018 N UFGS 09 29 00 Gypsum Board C 3 Added requirements to use PVC or plastic trim and accessories in high humidity and ESC C3-C5 locations.
Nov-2018 N UFGS 09 90 00 Paints and Coatings C 4 Added note to use UFGS 03 31 29 or UFGS 03 31 30 in ESC C4 and C5 locations or where deicing salts.
Nov-2018 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 1 Deleted now obsolete calculation requirement for Brake Mean Effective Pressure (BMEP).
Nov-2018 S UFGS 01 33 00 Submittal Procedures C 1 Submittal Note updated and tailoring changes.
Nov-2018 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 1 Added requirement and note to use galvanized tendons in ESC C4 and C5 locations, and concrete cover requirements for tendon anchorages for post tensioning.
Nov-2018 S UFGS 06 18 00 Glued-Laminated Construction C 1 Added Note to not use GLC in ESC C4 and C5 and humid locations.
Nov-2018 S UFGS 12 32 00 Manufactured Wood Casework C 1 Added note for drawer bottoms, plastic laminate covered cabinet doors, and non-ferrous metal fasteners, fittings, and hardware.
Feb-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.
Feb-2019 A UFGS 01 78 00 Closeout Submittals C 5 Added submittal item to paragraph 1.7.1 in response to CCR 7121.
Feb-2019 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 2 Coordinated the requirements for demolition and deconstruction activities with UFGS 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Feb-2019 A UFGS 33 40 00 Stormwater Utilities C 6 Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.
Feb-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 2 Updated Hydroelectric Design Center (HDC) phone number and ER reference in response to CCR 7048.
Feb-2019 S UFGS 01 33 00 Submittal Procedures C 2 In response to CCR's 7173, 7174, 7175, 7176, 7177, and 7123. 02/28/19 INTERIM RELEASE: This section was updated in response to CCR's 7314 and 7315 - the banner was incorrectly marked and was corrected to indicate Change 2; the command Execute Revisions was run to eliminate formatting elements that displayed in the previous version.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
May-2019 N UFGS 01 35 26 Governmental Safety Requirements C 7 In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer.
May-2019 N UFGS 01 57 19 Temporary Environmental Controls C 2 In response to CCR 7194, FAR clause 52.242-14 Suspension of Work was added to the paragraph "Non-Compliance Notifications"; updated links per CCRs 7375 and 7376
May-2019 A UFGS 04 20 00 Unit Masonry C 2 Added sentence to paragraph 2.6.2.7 in response to CCR 7025.
May-2019 A UFGS 11 13 19.13 Loading Dock Levelers C 1 Added reference publications MHI MH30.1, MHI MH30.3, ASTM D624, and ASTM D2632 in response to CCR 7391.
May-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 3 Updated list of allowable materials in paragraph 2.2 in response to CCR 6444, CCR 6719, and CCR 7165.
May-2019 S UFGS 01 33 00 Submittal Procedures C 3 Editing Para 1.17
Aug-2019 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) C 2 Updated RMS requirements in paragraph 1.4 and deleted paragraph 1.5 in response to CCR 7627.
Aug-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
Aug-2019 A UFGS 23 52 00 Heating Boilers C 4 Revised paragraph 2.12.14 in response to CCR 7344.
Aug-2019 N UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks C 2 In response to CCR 4193, the NOTE under paragraph "SURFACE PREPARATION" (3.8) has been removed as the instructions refer to SSPC SP 12 which has been withdrawn.
Aug-2019 N UFGS 01 57 19 Temporary Environmental Controls C 3 In response to the following CCRs: #5233 - revised language in paragraph "Dust Control" (3.5.7) to reflect the Crystalline Silica hazard associated with cement and concrete products per the new OSHA Standard of Crystalline Silica; #5733 - "Stormwater Pollution Prevention Plan" has been added as a submittal item under SD-01 and in paragraph "Stormwater Pollution Prevention Plan" (3.2.1.1); #7178 - revision to clarify submittal item "Solid Waste Management Report", updated as "Monthly Solid Waste Disposal Report" in Part 1 (1.11.1) and "Project Solid Waste Disposal Documentation Report" in Part 3 (3.7.2.1) and in the Submittal Article under SD-06 and SD-11 respectively; #7179 - added a new row "C&D Debris Composted" to table under paragraph Nonhazardous Solid Waste Diversion Report (3.6.2)
Aug-2019 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 6316, added paragraph to "Schedule of Work/Aircraft Operating Schedules" (3.1.2 ) to define/clarify "Existing Conditions Survey"
Aug-2019 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 1 Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.
Aug-2019 N UFGS 01 45 00.00 20 Quality Control C 3 In response to CCRs 6298 and 6299, statements requiring eOMSI/OMSI were changed to bracketed options in paragraphs "Duties Statement" (1.5.2.1) and "Test Reports and Monthly Summary Report of Tests" (1.12.5), respectively. In response to CCR 6558, Specifier Note and bracketed option were added to paragraph "Requirements" (1.6.1.1), list item k. "LIST OF DEFINABLE FEATURES"
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2019 N UFGS 01 35 26 Governmental Safety Requirements C 8 In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19)
Nov-2019 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment C 1 Updated paragraphs 2.2 and 2.3 in response to CCR 6932.
Nov-2019 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 1 Updated paragraphs 2.3, 2.4.1, and 2.5 in response to CCR 6932.
Nov-2019 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC C 1 Added new paragraph 1.1.1 to accommodate a recent change in Navy policy.
Nov-2019 A UFGS 23 52 00 Heating Boilers C 5 Updated designer's note on page 15 in response to CCR 6454.
Nov-2019 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) C 1 Updated paragraphs 2.3.11.3, 2.3.14, 3.5.2.1, and 3.5.2.2 to remove "brand name or approved equal" language in response to CP/DWG discussions.
Nov-2019 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 3 In response to CCR 7497, brackets were added to the paragraph Field Administration (1.4.3) and the text was updated to clarify the disposition of the tablet computer.
Nov-2019 N UFGS 01 45 00.00 20 Quality Control C 4 In response to the following: CCR 7292, the Designer Note with instructions for bracketed sentences was removed from the paragraph COORDINATION AND MUTUAL UNDERSTANDING MEETING (1.7) since the text did not contain any brackets; CCR 7294, the Designer Note for paragraph QC ORGANIZATION (1.5) and paragraph Qualifications (1.5.1.2) has been updated to read FEAD/ROICC; CCRs 6296, 6300, 6301, OMSI has been replaced with O&M in paragraphs INFORMATION FOR THE CONTRACTING OFFICER (1.3-h.), Completion Certification (1.13.3), and DOCUMENTATION-Testing Plan and Log (1.15.4) to better align with the terminology utilized in Section 01 78 23 Operation and Maintenance Data.
Nov-2019 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 6757, paragraph FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS (1.7) was deleted as it is repetitive of requirements already noted in Section 02 82 00 ASBESTOS REMEDIATION; per CCR 6658, Air Force tailoring has been added to the paragraphs "Duties" (1.7.2.1) and FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ) (1.9) since AFCEC/CF utilizes the Red Zone processes.
Nov-2019 N UFGS 02 82 00 Asbestos Remediation C 1 In response to CCR 6757, paragraph "Competent Person Documentation" has been changed to "Designated Competent Person Documentation" (1.5.2) and a first tier requirement was added.
Nov-2019 N UFGS 01 35 13 Special Project Procedures C 2 In response to CCR 4579, landing area "clear zones" in paragraph Definitions (1.2) has been updated to correct fixed wing information and add helicopter information.
Nov-2019 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
Nov-2019 N UFGS 26 20 00 Interior Distribution System C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 23 00 Low Voltage Switchgear C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 01 Overhead Transmission and Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 02 Underground Electrical Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
Nov-2019 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 5 Added notes throughout the specification and notes to the specifier prohibiting torch application of the roofing system when the roof deck, the materials used in the installation of the roofing system, or the existing roof deck or materials are combustible as defined by NFPA 101. Added required submittal to Submittals Article (1.3) of torch applicators CERTA card. Added requirement in paragraph "Preroofing Conference" (1.4.8-g). for torch operator to attend the preroofing conference. Added requirement in paragraph "Fire Watch" (1.7.2) for the use of thermal heat imager during the firewatch.
Nov-2019 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (1.11-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”
Nov-2019 N UFGS 26 05 33 Dockside Power Connection Stations C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.6-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”.
Nov-2019 N UFGS 26 11 16 Secondary Unit Substations C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.5-a.), "Decal shall be Panduit No. PPSO710D72 or approved equal.".
Nov-2019 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS AND LABELS (2.6-a.), “(decals, Panduit No. PPSO710D72 or approved equal)”.
Feb-2020 A UFGS 01 45 00.00 10 Quality Control C 1 Added hyperlink to paragraph 3.7.2 in response to CCR 7765.
Feb-2020 A UFGS 07 27 10.00 10 Building Air Barrier System C 1 Revised paragraph 1.7 to update air barrier inspector qualification requirements.
Feb-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 2 Updated paragraphs 2.4 and 2.4.7 in response to CCR 7072.
Feb-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 3 Updated paragraph 2.13 a. in response to CCR 2691.
Feb-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.
Feb-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 6 Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Feb-2020 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters C 1 Updated paragraph 2.1.1 in response to CCR 3988.
Feb-2020 A UFGS 23 82 01.00 10 Warm Air Heating Systems C 1 Updated section reference in paragraph 2.11.6 in response to CCR 5140.
Feb-2020 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System C 1 Deleted reference from paragraphs 3.9.1.1 and 3.9.1.2 in response to CCR 2504. Updated paragraph 2.4.4 in response to CCR 3271.
Feb-2020 A UFGS 35 41 00 Levee Construction C 1 Incorporated changes to provide clarification to the responsibility of the contractor related to subsurface interpretation in paragraph 1.6.3; temporary excavation slopes in paragraph 3.9.5; and slope failure and sliding due to fault or negligence of the contractor in paragraph 3.11.
Feb-2020 A UFGS 40 05 13 Pipelines, Liquid Process Piping C 2 Updated references and paragraph 2.14.1 in response to CCR 79.
Feb-2020 A UFGS 48 06 15 Turbine Oil C 1 Updated paragraphs 1.4, 2.1.1, 2.1.2, 2.2, 2.3 and 2.4 in response to CCR 4578.
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Feb-2020 N UFGS 01 45 00.00 20 Quality Control C 5 In response to the following: CCR 4323, "QCM" and "CQM" changed to "QC Manager" for clarity in paragraph (1.14.2) Pre-Final Inspection; CCR 6302, Specifier Note in paragraph (1.5.10) QC Administrative Assistant, removed reference to require Section 01 33 29 Sustainability Reporting. It is up to the contractor to determine how they comply with contract requirements; CCR 8046, Specifier Note in paragraph (1.5.1.2) Qualifications updated to properly select the CQC requirements; and CCR 8243, para QC PROGRAM REQUIREMENTS (1.4) updated to ensure uniformity for all NAVFAC projects that compliance of the Quality Control Manager will report to an officer of the firm/company.
Feb-2020 N UFGS 09 29 00 Gypsum Board C 4 In response to CCR 8088
Feb-2020 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear C 1 Complete review and update; CCRs to address updating references and use of imperative language
Feb-2020 N UFGS 41 22 13.16 Gantry Cranes C 1 Updated Specifier Note in Part 1 clarifying when to use related UFGS crane sections.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 35 26 Governmental Safety Requirements C 9 In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. A link to the contractor safety self-evaluation checklist has been added to Contractor Safety Self-Evaluation Checklist (para 1.5).
May-2020 N UFGS 01 45 00.00 20 Quality Control C 6 Added information under QC Manager Duties (1.5.1.1) as well as new paragraph "QC for [Secure Space][Controlled Area][Sound Rated] Perimeter Construction" (1.5.12) to ensure that the government Site Security Manager is involved with the inspection process early on when accreditation is required by ICD/ICS 705 and that the contractor follow a formal process for the inspection and acceptance of secure spaces, controlled areas and sound rated assemblies. Also, in response to the following: CCR 6711, clarified Note in paragraph Laboratory Accreditation Authorities (1.12.2) to include Design Manager (DM); and CCR 6867, updated to ensure duplicate technical commissioning requirements were removed.
May-2020 N UFGS 01 91 00.15 Building Commissioning C 1 Preparing Activity changed to NAVFAC as this section has been for Navy-use only since 05-2019; In response to the following: CCR 6881, paragraph Project Schedule (1.6.2) is not appropriate for use on Navy projects and was removed; and CCR 8403, in paragraph Lead Commissioning Specialist (1.8.1) , "ASHRAE Commissioning Process Management Professional (CPMP) was changed to "ASHRAE Building Commissioning Professional (BCxP)"
May-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 In response to CCR 8507, Section has been updated to capture the requirements for surplus soil disposal at Camp Lejeune, NC (1.4.6.1.2).
May-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
May-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 1 Updated reference publications in response to CCR 8209.
May-2020 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) C 1 Revised 1st editor's note in response to CCR 7534.
May-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
Aug-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
Aug-2020 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Updated last paragraph of designer's note and specification text in subpart 1.5 in response to CCR 9043. Added notes for NAVFAC PAC requirements in subparts 1.5 and 1.7, and updated text in first paragraph of subpart 1.7 in response to CCR 8834. Deleted tailoring options in subparts 1.3 and 1.4.3 in response to CCR 8911. Added tailoring options to submittal SD-06 in response to CCR 8912. Updated designer's note referring to Third Party Certification in subpart 1.7 in response to CCR 8913. Added tailoring options in subparts 1.6 and 1.7, and deleted first designer's note in subpart 1.7 in response to CCR 8914.
Aug-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 2 Updated commissioning certification in paragraph 1.8.1 in response to CCR 8404.
Aug-2020 A UFGS 03 70 00 Mass Concrete C 2 Updated paragraph 3.7.2.6.5 in response to CCR 1786.
Aug-2020 A UFGS 09 68 00 Carpeting C 2 Deleted second paragraph of subpart 2.1.1 in response to CCR 8744.
Aug-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment C 1 Updated/added UFC reference in second paragraph of subpart 3.6 note and updated last sentence of first text paragraph in response to CCR 8586.
Aug-2020 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 2 Added reference to UFC 3-301-02 to various subparts in response to CCR 8761.