UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Aug-2014 A UFGS 33 40 00 Stormwater Utilities C 3 Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333
Aug-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices C 1 Made minor editorial corrections
Aug-2014 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.4.1.1, and 1.4.2, this section was deleted from the UFGS Database
Aug-2014 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System C 1 Added paint requirements as noted in CCR 2518
Aug-2014 A UFGS 46 61 00 Filtration Equipment C 1 Added paint requirements as noted in CCR 2519
Aug-2014 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System C 1 Deleted publication as noted in CCR 776
Aug-2014 A UFGS 46 76 23.16 Recessed Chamber Filter Presses C 1 Added paint requirements as noted in CCR 2520
May-2014 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 1 Changed Physical Security Equipment (PSE) to Electronic Security Equipment (ESS) and modified FF&E and A/V CLIN.
May-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Modified subpart 3.1.1.1
May-2014 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 S UFGS 03 47 13 Tilt-Up Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 S UFGS 05 51 00 Metal Stairs C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING.
May-2014 S UFGS 05 52 00 Metal Railings C 3 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 A UFGS 07 55 00 Protected Membrane Roofing (PMR) C 1 Energy efficiency requirements added
May-2014 N UFGS 08 53 00 Plastic Windows C 1 Modified subpart 1.6.3
May-2014 A UFGS 11 44 00 Food Cooking Equipment C 1 Energy efficiency requirements added
May-2014 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 N UFGS 32 17 23.00 20 Pavement Markings C 1 Modified subpart 2.1 (note), 2.1.1 and 2.1.2.
May-2014 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) C 1 Clarified washer material requirements as noted in CCR 2605
May-2014 A UFGS 33 52 43.13 Aviation Fuel Piping C 1 Clarified washer material requirements as noted in CCR 2604
May-2014 S UFGS 40 17 30.00 40 Welding General Piping C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
Feb-2014 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 1 Deleted subpart 1.3.1.3 "Waiver for Workers' Compensation"
Feb-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 Modified note before Part 1, Part 1, subparts 1.3, 1.4.1, 1.4.1.2,1.4.1.2.2, 1.4.1.3, 1.4.1.4, 1.4.1.5, 1.4.1.6.1, 1.4.1.6.6, 1.4.1.7, 1.6.5.2.1 and 1.6.5.2.2
Feb-2014 N UFGS 07 21 23 Loose Fill Thermal Insulation C 2 Modified subpart 2.1.1
Feb-2014 N UFGS 08 11 13 Steel Doors and Frames C 1 Modified subpart 2.3
Feb-2014 A UFGS 09 68 00 Carpeting C 1 Allowed for use of triexta (PTT)
Feb-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)
Feb-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 3 Modified subparts 2.2.1.3, 3.1.3.2, 3.2.2, 3.2.3; added 3.2.2.1 and 3.2.2.2
Nov-2013 S UFGS 01 33 00 Submittal Procedures C 3 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2
Nov-2013 S UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Revised note before part 1.
Nov-2013 A UFGS 02 65 00 Underground Storage Tank Removal C 1 Removed references to EM 200-1-3
Nov-2013 A UFGS 09 06 90 Schedules for Painting and Coating C 1 Reformatting
Nov-2013 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 1 Revised subparts 2.2.1, 2.2.2, 2.3, 2.4, 2.4.1, 2.4.2, 2.5.1, 2.5.3, 2.8 and 3.2.4
Nov-2013 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers C 1 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS within the General Note
Nov-2013 N UFGS 31 23 00.00 20 Excavation and Fill C 1 Revised subpart 1.6 and table in subpart 2.10
Nov-2013 N UFGS 31 62 19 Timber Piles C 1 Revised subpart 2.1.4
Nov-2013 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement C 1 Revised notes before Part 1 and subparts 2.1.1 and 3.1.2.1. Deleted subparts 1.6.2.1 Hot-Poured Liquid Sealant and 2.1.1.2 Sealant, Joint, Jet-
Nov-2013 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement C 1 Revised subparts 2.5 and 3.3.2.1
Nov-2013 N UFGS 32 12 17 Hot Mix Bituminous Pavement C 1 Revised subparts 1.6.1, 2.2, 2.5.1, 2.5.2, 3.3, 3.5.2.2 and 3.5.2.3
Nov-2013 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities C 1 Added subparts 1.2, 2.1.1.2, 2.1.1.4 and 2.1.2; Revised subparts 1.4, 1.6.2, 2.1.1, 2.1.3, 2.1.3.1, 2.3, 3.3.7, 3.7.5.1, 3.7.5.2 and 3.7.7
Nov-2013 N UFGS 32 13 43 Pervious Concrete Paving C 1 Revised subparts 1.3, 1.5.1 and 3.3.4
Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2013 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type C 1 Revised subpart 2.5.3 and 2.6.2.2
Nov-2013 N UFGS 33 52 90.00 20 Welding for POL Service Piping C 1 Revised subpart 3.3
Nov-2013 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators C 1 Revised subpart 3.2
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2013 N UFGS 01 35 26 Governmental Safety Requirements C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
Aug-2013 N UFGS 06 13 33 Pier Timberwork C 1 Modified subpart 2.1.1.2
Aug-2013 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 1 Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg
Aug-2013 A UFGS 07 84 00 Firestopping C 1 Industry input
Aug-2013 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 Modified notes before Part 1 and in subpart 3.6
Aug-2013 A UFGS 21 30 00 Fire Pumps C 1 CCR 1147, fuel piping specified by NFPA 20
Aug-2013 N UFGS 26 27 29 Marina Electrical Work C 1 Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note)
Aug-2013 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Modified subparts 1.5 and 3.5 (notes)
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 2 Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3
Aug-2013 N UFGS 46 23 00 Grit Removal and Handling Equipment C 1 Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6
May-2013 N UFGS 03 45 00 Precast Architectural Concrete C 1 Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9
May-2013 N UFGS 05 21 19 Open Web Steel Joist Framing C 1 Modified subpart 2.2.1
May-2013 N UFGS 07 21 13 Board and Block Insulation C 1 modified subpart 1.3
May-2013 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 21 23 Loose Fill Thermal Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 22 00 Roof and Deck Insulation C 1 Modified subpart 1.4.3
May-2013 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 1 modified subpart 1.5.10
May-2013 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 1 modified subpart 1.4.6
May-2013 N UFGS 08 14 00 Wood Doors C 1 Modified subpart1.3
May-2013 N UFGS 08 36 13 Sectional Overhead Doors C 1 Modified subparts 2.2, 2.3, 2.4.1, 2.4.1.1, 2.4.3, 2.5.1, 2.6.4, 2.7
May-2013 N UFGS 09 23 00 Gypsum Plastering C 1 modified subpart 1.3.2
May-2013 N UFGS 09 26 00 Veneer Plaster C 1 Modified subpart 1.4
May-2013 N UFGS 09 29 00 Gypsum Board C 1 Modified subpart 1.3
May-2013 N UFGS 09 64 00 Portable (Demountable) Wood Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 64 66 Wood Athletic Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 90 00 Paints and Coatings C 1 modified subpart 1.4.4
May-2013 N UFGS 10 22 13 Wire Mesh Partitions C 1 modified subpart 1.4
May-2013 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 modified subpart 1.3.4
May-2013 N UFGS 10 22 26.23 Coiling Partitions C 1 modified subpart 1.4
May-2013 N UFGS 12 22 00 Curtains and Drapes C 1 modified subpart 1.5
May-2013 A UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Updated references to sections and paragraphs of ASME A17.1/CSA B44
May-2013 N UFGS 22 00 00 Plumbing, General Purpose C 1 modified subpart 2.1
May-2013 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added the option for pneumatic or electric damper operator
May-2013 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 1 modified subpart 1.4.5.3
May-2013 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 1 modified subparts 2.1.1.11, 2.2 and 2.4.3
May-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) C 1 Inserted NOTES on Impressed Current Anodes and Anode Installation
May-2013 A UFGS 33 40 00 Stormwater Utilities C 2 Added requirements for use of Polypropylene (PP) Pipe
Feb-2013 A UFGS 09 65 00 Resilient Flooring C 1 Adjusted sustainability requirements
Feb-2013 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 23 11 25 Facility Gas Piping C 1 Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements
Feb-2013 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 1 Modified subpart 1.6 and notes before part 1
Feb-2013 N UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines C 1 Removed fiberglass piping, and added CSST and EFV
Feb-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 1 Modified subpart 2.7.3.1
Feb-2013 N UFGS 46 43 21 Circular Clarifier Equipment C 2 Modified subpart 2.2.3.2

Pages