UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Feb-2016 S UFGS 01 33 00 Submittal Procedures C 7 Incorporated outstanding CCR's.
Feb-2016 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added provision for dumpsters tailored to NAVFAC SE
Feb-2016 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 1 Corrected Section title, was CEMENT TILING, QUARRY TILING, AND PAVER TILING; corrected tailoring
Feb-2016 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System C 1 Change to clarify that vendor products named are pretested for specification compliance. These and additional vendors and products may be submitted for review of compliance with test results in accordance with this specification; editorial updates.
Feb-2016 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling C 1 Performed updating of Section Format, imperative language, formatting review, and Submittal Article clean up
Feb-2016 A UFGS 33 30 00 Sanitary Sewerage C 4 Additional requirements to prevent cross connection of sanitary with storm sewer
Nov-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
Nov-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays
Nov-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Alignment with sustainable policies.
Nov-2015 S UFGS 12 31 00 Manufactured Metal Casework C 1 Subpart 2.8, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 32 00 Manufactured Wood Casework C 1 Subpart 2.3.3, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 34 00 Manufactured Plastic Casework C 1 Subpart 2.3.2, SRF 09 06 90 changed title from Color Schedule to Schedules for Painting and Coating
Nov-2015 S UFGS 12 36 00 Countertops C 1 Subpart 2.2.2, Section Reference (SRF) 09 06 90 changed title from "Color Schedule" to "Schedules for Painting and Coating"
Nov-2015 S UFGS 12 48 13 Entrance Floor Mats and Frames C 2 Subpart 2.4, SRF 09 06 90 changed title from COLOR SCHEDULE to Schedules FOR PAINTING AND COATING
Nov-2015 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 1 Deleted paragraph 2.1.3 MECHANICAL PIPE COUPLING SYSTEM and subparagraphs 2.1.3.1, 2.1.3.2, 2.1.3.3
Nov-2015 A UFGS 31 00 00 Earthwork C 1 Added fill lift height and moisture requirements as recommended in approved CCR 4098
Nov-2015 N UFGS 33 05 23 Trenchless Utility Installation C 1 Removed reference to UFGS Section 33 01 30.16 in subpart 3.5.3, as this section is not yet published
Nov-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 2 Recommended changes from NAVFAC SE regarding revised notes, to use of imperative language and miscellaneous items as submitted via CCR 4563.
Feb-2015 S UFGS 01 33 00 Submittal Procedures C 5 Per USACE request, adjusted the Note in the following subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but can't get the file, Section 01 33 16 Design After Award is not a UFGS Section.
Feb-2015 N UFGS 01 45 00.00 20 Quality Control C 1 Updated to conform to the DOD Special Inspection requirements defined in spec 01 45 35; Added Special Inspections requirements and removed references to LEED.
Feb-2015 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 2 Modified subpart 3.1.1.3
Feb-2015 N UFGS 01 78 23 Operation and Maintenance Data C 3 Added Safety Hazards, Operating Log, Extended Warranty and Field Test Reports to O&M DATA PACKAGES. Coordinated with UFGS 01 78 24.00 20 Facility eOMSI .
Feb-2015 S UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 S UFGS 02 42 51 Carpet Removal and Reclamation C 1 Consist of imperative language, spell check, QC reports, and formatting review.
Feb-2015 N UFGS 03 30 00 Cast-In-Place Concrete C 1 Completion of Criteria Change Request.
Feb-2015 A UFGS 03 30 00.00 10 Cast-In-Place Concrete C 1 Response to CCR 3916.
Feb-2015 S UFGS 05 72 00 Decorative Metal Specialties C 1 Consist of imperative language, spell check, QC reports, and formatting review .
Feb-2015 A UFGS 14 92 00 Pneumatic-Tube System C 1 Incorporate CCR 3970, adding Energy Star compliance .
Feb-2015 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 Completion of Criteria Change Request.
Feb-2015 N UFGS 23 82 00.00 20 Terminal Heating Units C 1 Completion of Criteria Change Request .
Feb-2015 N UFGS 26 08 00 Apparatus Inspection and Testing C 1 Modified subpart 3.1 e.
Feb-2015 N UFGS 33 47 13 Pond and Reservoir Liners C 1 Reference update; added subparts 2.1.3, 2.1.4, 2.1.5, and 2.1.6; technical updates to subparts 3.3, 3.6, 3.7.1.2.1, and 3.7.1.2.2
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2018 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Change incorporates minor corrections and coordinates the use of Non-mineral insulating oil.
Nov-2014 N UFGS 01 11 00 Summary of Work C 1 SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Nov-2014 S UFGS 01 33 00 Submittal Procedures C 4 Tri-Annual Database Maintenance (TADM), which consists of: Tailoring changes, incorporation of Sustainability requirements, CCR's and verification of all reports and spelling.
Nov-2014 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Replaced section reference 01 35 40.00 20 with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Nov-2014 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Clarified how to download eOMSI Facility Data Workbook, added reference to Section 01 32 17.00 20, and in 2.3, item e, added Asset number provided by Govt.
Nov-2014 S UFGS 01 91 00.00 40 Commissioning C 1 Edited PART 1 GENERAL and deleted the mention of Section 01 35 40.00 20; added the listing of Section 01 57 19.00 20 Temporary Environment Controls, and realigned the item lettering.
Nov-2014 A UFGS 03 70 00 Mass Concrete C 1 Replaced section reference 01 35 40.00 20 with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Nov-2014 N UFGS 05 12 00 Structural Steel C 1 Changed Reference A153/A153M to ASTM A123/A123M in Subpart 2.5.
Nov-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness C 1 Updated testing requirements in paragraphs 3.4, 3.5 and 3.6.
Nov-2014 N UFGS 09 64 66 Wood Athletic Flooring C 2 Changed Section Reference 31 31 16 Soil Treatment for Subterranean Termite Control to Section Reference 31 31 16.13 Chemical Termite Control
Nov-2014 A UFGS 09 68 00 Carpeting C 2 Added clarification to editor's note as noted in CCR 4007.
Nov-2014 S UFGS 12 48 13 Entrance Floor Mats and Frames C 1 Replaced 01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIAL with 01 33 29 SUSTAINABILITY REQUIREMENTS in Subparts 1.2.2 and 1.2.3.
Nov-2014 S UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems C 1 Minor change in paragraph 3.3.6
Nov-2014 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 2 Updated Products Section for chillers in Part 2.
Nov-2014 F UFGS 26 27 13.10 30 Electric Meters C 1 Corrected tagging error in paragraph 2.1.4 e.
Nov-2014 S UFGS 26 51 00.00 40 Interior Lighting C 1 Deleted the mention of Section 26 35 46.00 20 RADIO FREQUENCY INTERFERENCE POWER LINE FILTERS from Subpart 2.2.1.8.
Nov-2014 N UFGS 31 31 16.20 Basaltic Termite Barrier C 2 Corrections to submittals 02, 06, 08, 11. Correction to 3.1 INSTALLATION to install in accordance with manufacturer's installation instruction.
Nov-2014 A UFGS 31 41 16 Metal Sheet Piling C 1 SRF update, changed 00 41 00 BID SCHEDULES to 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles C 1 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 2 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 N UFGS 31 62 13.24 Concrete Cylinder Piles C 1 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 N UFGS 31 62 16.16 Steel H-Piles C 1 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
May-2018 N UFGS 14 21 13 Electric Traction Freight Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 24 13 Hydraulic Freight Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 N UFGS 14 24 23 Hydraulic Passenger Elevators C 1 Specification changed to allow for machine room elevators and machine room less elevators.
May-2018 A UFGS 05 59 13 Fabrication of Hydraulic Steel Structures C 1 Changes were made in order to ensure proper reference to updated ASTM Standards including ASTM A709 and ASTM F3125. Additionally the new AISC HYD certification for the fabrication of Hydraulic Steel Structures was added.
May-2018 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 1 Incorporated changes in response to CCR 4572.
Dec-2014 N UFGS 31 62 19 Timber Piles C 2 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
Nov-2014 N UFGS 31 62 19.13 Timber Marine Piles C 1 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 A UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements C 1 Revised references as noted in CCR 2650.
Nov-2014 A UFGS 32 01 26.71 Grooving for Airfield Pavements C 1 Revised editor's notes as noted in CCR 2611. This revision is also applicable to CCR 3474.
Nov-2014 A UFGS 32 12 15.13 Asphalt Paving for Airfields C 1 Added RAP option to paragraph 2.4.2 as noted in CCR 1481.
Nov-2014 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements C 1 Revised par. 2.2.2.5 as noted in CCR 3847. Revised note in par. 2.4 as noted in CCR 2731.
Nov-2014 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements C 1 Revised references as noted in CCR 3293.
Nov-2014 A UFGS 32 16 13 Concrete Sidewalks and Curbs and Gutters C 1 Added requirements for detectable warning systems as noted in CCR 1754.
Nov-2014 A UFGS 32 16 15 Concrete Block Pavements C 1 Revised references and par. 2.2.1.1 as noted in CCR 3785.
Nov-2014 N UFGS 32 17 23.00 20 Pavement Markings C 2 Qualifications submission moved from SD-03 to SD-07, Add Subparts 1.8 QUALIFICATIONS FOR AIRFILED MARKING and 1.8.1, Airfield Marking Pavement Qualifications
Nov-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 4 Updated Note under Subpart 2.1 Allowable Piping Materials, paragraph 4.
Nov-2014 A UFGS 33 30 00 Sanitary Sewerage C 3 Deleted reference to CID A-A-60005 and revised par. 2.3.4.1 per CCR 2394.
Nov-2014 A UFGS 33 40 00 Stormwater Utilities C 4 Replaced ASTM C 924/C924M with ASTM C969/C969M per CCR 3584.
Nov-2014 A UFGS 33 46 16 Subdrainage Piping C 1 Deleted reference to UFC and updated FAA reference per CCR 2805.
Nov-2014 N UFGS 33 71 02 Underground Electrical Distribution C 1 Changed Section Reference 31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL to Section Reference 31 31 16.13 CHEMICAL TERMITE CONTROL
Nov-2014 A UFGS 34 73 13 Aircraft Tiedowns C 1 Revised paragraphs as noted in CCR 1569.
Nov-2014 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures C 1 SRF update, changed 00 41 00 BID SCHEDULES to 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 A UFGS 43 31 14 Trickling Filter C 1 Deleted reference and revised par. 2.4.1 and 2.4.2 as noted in CCR 768.
Aug-2014 N UFGS 00 01 15 List of Drawings C 1 Added editor's note to import list of drawings as Excel XML spreadsheet.
Aug-2014 N UFGS 01 14 00 Work Restrictions C 2 Fixed tailoring and bracket issue throughout. Revised Employment Restrictions for Bremerton, WA
Aug-2014 N UFGS 01 30 00 Administrative Requirements C 2 Deleted 35 mm slides as picture media
Aug-2014 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Moved execution requirements to Part 3 as noted in CCR 3562
Aug-2014 N UFGS 01 78 23 Operation and Maintenance Data C 2 Added editor's note to coordinate with UFGS 01 78 24.00 20 FACILITY eOMSI for Navy projects.
Aug-2014 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 1 Added FAA requirements as noted in CCR 857
Aug-2014 A UFGS 03 15 00.00 10 Concrete Accessories C 1 Made corrections as noted in CCR 3836
Aug-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing C 1 Corrected spelling as noted in CCR 3841; made corrections as noted in CCR 3842
Aug-2014 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 2 Fixed typo under "Substrate Preparation. Changed "Don not" to "Do not"
Aug-2014 N UFGS 09 22 00 Supports for Plaster and Gypsum Board C 1 In 2.1 UFC 3-310-04 needed a RID tag; fixed
Aug-2014 N UFGS 13 34 19 Metal Building Systems C 1 Fixed spacing in manufacturers data
Aug-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 3 Added Energy Star requirements
Aug-2014 A UFGS 23 52 00 Heating Boilers C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Aug-2014 N UFGS 31 31 16.20 Basaltic Termite Barrier C 1 Added SDs 6,8, and 11
Aug-2014 A UFGS 31 41 16 Metal Sheet Piling C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Aug-2014 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall C 1 Deleted paragraph as noted in CCR 3331
Aug-2014 N UFGS 32 93 00 Exterior Plants C 1 CCR 3597: ASTM D1527 has been withdrawn with not replacement and CCR 3602: ASTM D1972 has been withdrawn with no replacement
Aug-2014 A UFGS 33 30 00 Sanitary Sewerage C 2 Made corrections as noted in CCR 1672