UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Nov-2019 N UFGS 02 82 00 Asbestos Remediation C 1 In response to CCR 6757, paragraph "Competent Person Documentation" has been changed to "Designated Competent Person Documentation" (1.5.2) and a first tier requirement was added.
Nov-2019 N UFGS 01 35 13 Special Project Procedures C 2 In response to CCR 4579, landing area "clear zones" in paragraph Definitions (1.2) has been updated to correct fixed wing information and add helicopter information.
Nov-2019 N UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks (For Petroleum Fuels) D This section is no longer required as the information has become obsolete. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
Nov-2019 N UFGS 26 20 00 Interior Distribution System C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 23 00 Low Voltage Switchgear C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 01 Overhead Transmission and Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 02 Underground Electrical Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
Nov-2019 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement R Complete review and update to meet MF2016 and UFC 1-300-02; title changed from RESEALING OF JOINTS IN RIGID PAVEMENT. Revision supersedes previous version and UFGS 32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS.
Nov-2019 N UFGS 32 11 36.13 Lean Concrete Base Course R Complete review and update to meet MF2016 and UFC 1-300-02.
Nov-2019 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 5 Added notes throughout the specification and notes to the specifier prohibiting torch application of the roofing system when the roof deck, the materials used in the installation of the roofing system, or the existing roof deck or materials are combustible as defined by NFPA 101. Added required submittal to Submittals Article (1.3) of torch applicators CERTA card. Added requirement in paragraph "Preroofing Conference" (1.4.8-g). for torch operator to attend the preroofing conference. Added requirement in paragraph "Fire Watch" (1.7.2) for the use of thermal heat imager during the firewatch.
Nov-2019 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (1.11-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”
Nov-2019 N UFGS 26 05 33 Dockside Power Connection Stations C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.6-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”.
Nov-2019 N UFGS 26 11 16 Secondary Unit Substations C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.5-a.), "Decal shall be Panduit No. PPSO710D72 or approved equal.".
Nov-2019 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS AND LABELS (2.6-a.), “(decals, Panduit No. PPSO710D72 or approved equal)”.
Nov-2019 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running R Complete review and update. Incorporates latest crane test and certification requirements.
Feb-2020 N UFGS 01 45 35 Special Inspections R Section has been unified and merged with Navy DB RFP Division 1 Specifications to ensure that the Division 1 specs for DB and DBB are aligned, current, and compatible with USACE and NAVFAC. PA changed from Army to NAVFAC.
Feb-2020 N UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units N New specification covering the requirements for high-pressure, preconditioned air units, ductwork and controls for aircraft cooling systems in conjunction with UFC 4-211-01, Aircraft Maintenance Hangars.
Feb-2020 N UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems N New specification covering the requirements for variable refrigerant flow (VRF) type air conditioning and heat pumps systems and accessories in conjunction with UFGS 23 09 00 Instrumentation and Control for HVAC, UFGS 23 09 23.01 LONWORKS Direct Digital Control for HVAC and Other Building Control Systems, UFGS 23 09 23.02 BACNET Direct Digital Control for HVAC and Other Building Control Systems, UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems, and UFC 3-410-02 Direct Digital Control for HVAC and Building Control Systems.
Feb-2020 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts R Complete review and update, including Section Title change (was VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS)
Feb-2020 N UFGS 41 22 13.13 Bridge Cranes D Superseded by UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley R Complete review and update. Incorporates latest crane test and certification requirements.
Feb-2020 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment N New Section combining UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration and 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical
Feb-2020 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration D Superseded by UFGS 46 07 53 Packaged Wastewater Treatment Equipment Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 N UFGS 46 23 00 Grit Removal and Handling Equipment R Complete review and update.
Feb-2020 N UFGS 46 43 21 Circular Clarifier Equipment R Complete review and update.
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Feb-2020 N UFGS 01 45 00.00 20 Quality Control C 5 In response to the following: CCR 4323, "QCM" and "CQM" changed to "QC Manager" for clarity in paragraph (1.14.2) Pre-Final Inspection; CCR 6302, Specifier Note in paragraph (1.5.10) QC Administrative Assistant, removed reference to require Section 01 33 29 Sustainability Reporting. It is up to the contractor to determine how they comply with contract requirements; CCR 8046, Specifier Note in paragraph (1.5.1.2) Qualifications updated to properly select the CQC requirements; and CCR 8243, para QC PROGRAM REQUIREMENTS (1.4) updated to ensure uniformity for all NAVFAC projects that compliance of the Quality Control Manager will report to an officer of the firm/company.
Feb-2020 N UFGS 09 29 00 Gypsum Board C 4 In response to CCR 8088
Feb-2020 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear C 1 Complete review and update; CCRs to address updating references and use of imperative language
Feb-2020 N UFGS 41 22 13.16 Gantry Cranes C 1 Updated Specifier Note in Part 1 clarifying when to use related UFGS crane sections.
May-2020 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 01 73 19 Installation of Government-Furnished Medical Equipment D Superseded by UFGS 11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R Complete review and update.
May-2020 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R Complete review and update.
May-2020 N UFGS 11 70 00 General Requirements for Medical and Dental Equipment R Complete review and update; Revision includes merging contents of UFGS 01 73 19 INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT into this Section.
May-2020 N UFGS 11 72 13 Medical Equipment, Miscellaneous R Complete review and update.
May-2020 N UFGS 11 74 00 Dental Equipment R Complete review and update.
May-2020 N UFGS 13 17 43 Hydrotherapy Equipment R Complete review and update.
May-2020 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods D Section no longer required - The information in this Section has been incorporated into other UFGS Sections. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 26 32 13.00 20 Single Operation Generator Sets D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 26 36 23.00 20 Automatic Transfer Switches D Superseded by UFGS 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 26 51 00 Interior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 N UFGS 26 56 00 Exterior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 N UFGS 27 54 00.00 20 Community Antenna Television (CATV) D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 27 05 13.43 Television Distribution System N New Unified Section superseding UFGS 27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM, UFGS 27 41 16.00 10 TELEVISION SIGNAL RECEPTION SYSTEM, and UFGS 27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
May-2020 N UFGS 32 01 17.62 Paving Fabric Interlayer R Complete review and update. Section title has been changed from STRESS-ABSORBING MEMBRANE INTERLAYER to PAVING FABRIC INTERLAYER to match the revised content of this section.
May-2020 N UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] D Superseded by UFGS 32 11 13.13 LIME TREATED SUBGRADE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities R Complete review and update.
May-2020 N UFGS 32 13 43 Pervious Concrete Paving R Complete review and update.
May-2020 N UFGS 41 22 23.19 Monorail Hoists R Complete review and update. Incorporates latest test and certification requirements.
May-2020 N UFGS 44 41 00.00 20 Water Pollution Containment and Cleanup Equipment N New Navy-only specification for containment of fire suppressant discharge.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 35 26 Governmental Safety Requirements C 9 In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. A link to the contractor safety self-evaluation checklist has been added to Contractor Safety Self-Evaluation Checklist (para 1.5).
May-2020 N UFGS 01 45 00.00 20 Quality Control C 6 Added information under QC Manager Duties (1.5.1.1) as well as new paragraph "QC for [Secure Space][Controlled Area][Sound Rated] Perimeter Construction" (1.5.12) to ensure that the government Site Security Manager is involved with the inspection process early on when accreditation is required by ICD/ICS 705 and that the contractor follow a formal process for the inspection and acceptance of secure spaces, controlled areas and sound rated assemblies. Also, in response to the following: CCR 6711, clarified Note in paragraph Laboratory Accreditation Authorities (1.12.2) to include Design Manager (DM); and CCR 6867, updated to ensure duplicate technical commissioning requirements were removed.
May-2020 N UFGS 01 91 00.15 Building Commissioning C 1 Preparing Activity changed to NAVFAC as this section has been for Navy-use only since 05-2019; In response to the following: CCR 6881, paragraph Project Schedule (1.6.2) is not appropriate for use on Navy projects and was removed; and CCR 8403, in paragraph Lead Commissioning Specialist (1.8.1) , "ASHRAE Commissioning Process Management Professional (CPMP) was changed to "ASHRAE Building Commissioning Professional (BCxP)"
May-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 In response to CCR 8507, Section has been updated to capture the requirements for surplus soil disposal at Camp Lejeune, NC (1.4.6.1.2).
Aug-2020 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 08 11 13 Steel Doors and Frames R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 11 73 Sliding Fire Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 32 13 Aluminum Sliding Glass Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors D Superseded by UFGS 08 33 23 OVERHEAD COILING DOORS (NASA-prepared) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 08 36 13 Sectional Overhead Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 19 Vertical Lift Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 23 Steel Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 69.10 Aluminum Storm Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 52 00 Wood Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 53 00 Plastic Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 56 53 Blast Resistant Tempered Glass Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 13 34 19 Metal Building Systems R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 21 13 13.00 20 Wet Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems D Superseded by UFGS 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 21 13 19.00 20 [Deluge] [Preaction] Fire Sprinkler Systems D Superseded by UFGS 21 13 19 DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment D Superseded by UFGS 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 28 31 49 Carbon Monoxide Detectors D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 28 31 63.00 20 Analog/Addressable Interior Fire Alarm System D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads D Superseded by UFGS 32 11 33.13 PORTLAND CEMENT-STABILIZED BASE COURSES Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment N New Unified Section; Superseding UFGS 44 41 00.00 20 WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT
Aug-2020 N UFGS 44 41 00.00 20 Water Pollution Containment and Cleanup Equipment D Superseded by unified section UFGS 44 41 00 WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 01 14 00 Work Restrictions C 10 Incorporate EURAFCENT requirements from, and supersede UFGS 00 74 00 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA. Also, incorporate the following CCRs: CCR 8681, revised requirements to ensure adherence to all appropriate PPE in paragraphs "Activity Regulations" (1.5.1) and "Shipyard Regulations" (1.5.3); CCR 8683, updated Specifier Note and paragraph "Working Hours" (1.5.5) to reflect the work schedules for various regions.
Aug-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 3 In response to CCR 8819, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and in paragraph "Data Required" (1.3.1)
Aug-2020 N UFGS 01 30 00 Administrative Requirements C 4 In response to CCRS 8820 and 9015, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01, updated paragraph "Formal Partnering" (1.12.1), and added paragraph "MOBILIZATION" (1.14).
Aug-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 5 In response to CCR 8821, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01
Aug-2020 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Aug-2020 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 3 In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).
Aug-2020 N UFGS 01 35 26 Governmental Safety Requirements C 10 In response to CCR 8826, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "ACCIDENT PREVENTION PLAN (APP)" (1.8).
Aug-2020 N UFGS 01 45 00.00 20 Quality Control C 7 In response to the following CCRs: CCR 8960, the Note pertaining to paragraph "Registered Fire Protection Engineer" (1.5.8) has been revised for clarity; CCR 8961, paragraph "QC Administrative Assistant" (1.5.10) has been removed to align with the other QC sections; CCR 8827, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: revised Submittal Article SD-01 and paragraph "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17).
Aug-2020 N UFGS 01 45 00.10 20 Quality Control for Minor Construction C 2 In response to CCR 8828, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and Note and to paragraph "QC PLAN" (1.6).
Aug-2020 N UFGS 01 57 19 Temporary Environmental Controls C 4 In response to CCR 8832, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and paragraph "ENVIRONMENTAL PROTECTION PLAN" (1.7); under paragraphs "Stormwater Pollution Prevention Plan" (3.2.1.1) and "Stormwater Notice of Intent for Construction Activities" (3.2.1.2) added note and text.