UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Nov-2018 N UFGS 08 52 00 Wood Windows C 4 Added note restricting use of steel windows in humid and ESC C3-C5 locations.
Nov-2018 N UFGS 08 53 00 Plastic Windows C 4 Added note restricting use of plastic windows in humid and ESC C3-C5 locations.
Nov-2018 N UFGS 08 71 00 Door Hardware C 2 Added requirements for hinges, locks and locksets, exit devices, closers, and finishes in humid and ESC C3-C5 locations.
Nov-2018 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers C 2 Added note for louver and finish requirements in humid and ESC C3-C5 locations.
Nov-2018 N UFGS 09 22 36 Lath C 2 Added requirements for accessories, hangers, and wires, in high humidity and ESC C3-C5 locations, and straps or rods in locations subject to violent storms.
Nov-2018 N UFGS 09 23 00 Gypsum Plastering C 1 Added mix requirement for acoustical plaster finish coat in high humidity ad ESC C3-C5 locations.
Nov-2018 N UFGS 09 29 00 Gypsum Board C 3 Added requirements to use PVC or plastic trim and accessories in high humidity and ESC C3-C5 locations.
Nov-2018 N UFGS 09 90 00 Paints and Coatings C 4 Added note to use UFGS 03 31 29 or UFGS 03 31 30 in ESC C4 and C5 locations or where deicing salts.
Nov-2018 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 1 Deleted now obsolete calculation requirement for Brake Mean Effective Pressure (BMEP).
Nov-2018 N UFGS 33 52 23.15 POL Service Piping Welding R Complete review and update including new Section number and title; Superseding UFGS 33 52 90.00 20 WELDING FOR POL SERVICE PIPING (Feb-10)
Nov-2018 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R (UFGS-33 01 50.60) Complete review and update including new Section number and title; Superseding UFGS 33 65 00 CLEANING PETROLEUM STORAGE TANKS (Aug-11)
Nov-2018 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank R Complete review and update including new Section number and title; Superseding UFGS 33 56 13.13 STEEL TANKS WITH FIXED ROOFS (Aug-15)
Nov-2018 N UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space R Complete review and update including new Section number and title; Superseding UFGS 33 56 13.15 UNDERTANK INTERSTITIAL SPACE (Aug-15)
Nov-2018 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) R Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy
Nov-2018 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) R Complete review and update including new Section number and title; Superseding UFGS 33 57 00 BULK FUEL RECEIVING/ DISPENSING EQUIPMENT (Aug-11); Preparing Activity changed from Army to Navy
Feb-2019 N UFGS 03 31 29 Marine Concrete with Service Life Modeling R New title (formerly MARINE CONCRETE); Section revised to incorporate data, recommended changes, align with current industry practice, and address challenges of concrete service life modeling.
Feb-2019 N UFGS 03 31 30 Marine Concrete N New marine concrete section developed for projects not requiring concrete service life modeling.
Apr-2006 N UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) R To conform with CSI MasterFormat, replacing without change UFGS-08315 (August 2004)
Feb-2019 N UFGS 34 43 00.00 20 Airfield Lighting D Superseded by Army Section 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 N UFGS 03 30 00 Cast-In-Place Concrete R Specification refresh. This section supersedes the following ARMY sections: 03 11 13.00 10 Structural Cast-In-Place Concrete Forming, 03 11 19.00 10 Insulating Concrete Forming, 03 15 00.00 10 Concrete Accessories, 03 20 00.00 10 Concrete Reinforcing, 03 30 00.00 10 Cast-In-Place Concrete, 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works, 03 35 00.00 10 Concrete Finishing, 03 39 00.00 10 Concrete Curing
Feb-2019 N UFGS 12 36 00.00 20 Manufactured Vanities D To conform with CSI MasterFormat, Section 12 36 00.00 20 MANUFACTURED VANITIES has been renumbered and renamed as Section 12 35 30.23 20 BATHROOM CASEWORK with no date change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2006 N UFGS 01 73 19 Installation of Government-Furnished Medical Equipment R To conform with CSI MasterFormat, replacing without change UFGS-11708 (August 2004)
Apr-2006 N UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils R To conform with CSI MasterFormat, replacing without change UFGS-13285 (August 2004)
Apr-2006 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R To conform with CSI MasterFormat, replacing without change UFGS-13286 (August 2004)
Apr-2006 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R To conform with CSI MasterFormat, replacing without change UFGS-13284 (August 2004)
Apr-2006 N UFGS 07 32 13 Roof Tiles R To conform with CSI MasterFormat, replacing without change UFGS-07320 (June 2005)
Apr-2006 N UFGS 07 32 14 Clay Tile Roofing Replacement or Repair R To conform with CSI MasterFormat, replacing without change UFGS-07321 (June 2005)
Apr-2006 N UFGS 08 34 49.00 20 Hemp Shielded Door R To conform with CSI MasterFormat, replacing without change UFGS-13095N (September 1999)
Apr-2006 N UFGS 08 51 69.10 Aluminum Storm Windows R To conform with CSI MasterFormat, replacing without change UFGS-08582 (August 2001)
Apr-2006 N UFGS 08 56 63 Detention and Security Windows R To conform with CSI MasterFormat, replacing without change UFGS-11191 (September 1999)
Apr-2006 N UFGS 08 71 63 Detention Hardware R To conform with CSI MasterFormat, replacing without change UFGS-11194 (August 2001)
Apr-2006 N UFGS 08 71 63.10 Electrical Locking Control for Brigs R To conform with CSI MasterFormat, replacing without change UFGS-08745 (August 2001)
Apr-2006 N UFGS 10 21 23.16 Cubicle Track and Hardware R To conform with CSI MasterFormat, replacing without change UFGS-10191 (August 2004)
Apr-2006 N UFGS 10 56 13 Steel Shelving R To conform with CSI MasterFormat, replacing without change UFGS-10675 (August 2004)
Apr-2006 N UFGS 10 71 13.13 Storm Shutters R To conform with CSI MasterFormat, replacing without change UFGS-10716 (August 2004)
Apr-2006 N UFGS 11 27 13 Radiographic Darkroom Equipment R To conform with CSI MasterFormat, replacing without change UFGS-11475 (August 2001)
Apr-2006 N UFGS 11 72 13 Medical Equipment, Miscellaneous R To conform with CSI MasterFormat, replacing without change UFGS-11702 (August 2001)
Apr-2006 N UFGS 11 74 00 Dental Equipment R To conform with CSI MasterFormat, replacing without change UFGS-11744 (August 2004)
Apr-2006 N UFGS 12 55 00 Detention Furniture and Accessories R To conform with CSI MasterFormat, replacing without change UFGS-11195 (September 1999)
Apr-2006 N UFGS 13 21 48 Prefabricated Audiometric Rooms R To conform with CSI MasterFormat, replacing without change UFGS-13034 (August 2004)
Apr-2006 N UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems R To conform with CSI MasterFormat, replacing without change UFGS-13935N (September 1999)
Apr-2006 N UFGS 21 21 00 Fire Extinguishing Sprinkler Systems (Residential) R To conform with CSI MasterFormat, replacing without change UFGS-13931 (September 1999)
Apr-2006 N UFGS 21 23 00.00 20 Wet Chemical Fire Extinguishing for Kitchen Cabinet R To conform with CSI MasterFormat, replacing without change UFGS-13971N (September 2000)
Apr-2006 N UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control R To conform with CSI MasterFormat, replacing without change UFGS-15070N (September 1999)
Apr-2006 N UFGS 22 15 26.00 20 High and Medium Pressure Compressed Air Piping R To conform with CSI MasterFormat, replacing without change UFGS-15212N (August 2004)
Apr-2006 N UFGS 23 08 01.00 20 Testing Industrial Ventilation Systems R To conform with CSI MasterFormat, replacing without change UFGS-15951N (September 1999)
Apr-2006 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System R To conform with CSI MasterFormat, replacing without change UFGS-15185N (September 1999)
Apr-2006 N UFGS 23 51 43.01 20 Mechanical Cyclone Dust Collector of Flue Gas Particulates R To conform with CSI MasterFormat, replacing without change UFGS-15861N (September 1999)
Apr-2006 N UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates R To conform with CSI MasterFormat, replacing without change UFGS-15862N (September 1999)
Apr-2006 N UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) R To conform with CSI MasterFormat, replacing without change UFGS-15517N (June 2005)
Apr-2006 N UFGS 23 83 00.00 20 Electric Space Heating Equipment R To conform with CSI MasterFormat, replacing without change UFGS-15768N (September 1999)
Apr-2006 N UFGS 26 27 29 Marina Electrical Work R To conform with CSI MasterFormat, replacing without change UFGS-16407 (August 2004)
Apr-2006 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts R To conform with CSI MasterFormat, replacing without change UFGS-16261 (August 2004)
Apr-2006 N UFGS 26 36 23.00 20 Automatic Transfer Switches R To conform with CSI MasterFormat, replacing without change UFGS-16410N (February 2003)
Apr-2006 N UFGS 26 42 13.00 20 Cathodic Protection by Galvanic Anodes R To conform with CSI MasterFormat, replacing without change UFGS-13110N (September 2000)
Apr-2006 N UFGS 26 42 19.00 20 Cathodic Protection by Impressed Current R To conform with CSI MasterFormat, replacing without change UFGS-13111N (August 2001)
Apr-2006 N UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures R To conform with CSI MasterFormat, replacing without change UFGS-16553N (September 1999)
Apr-2006 N UFGS 27 21 00.00 20 Intercommunication System R To conform with CSI MasterFormat, replacing without change UFGS-16822N (August 2003)
Apr-2006 N UFGS 27 54 00.00 20 Community Antenna Television (CATV) R To conform with CSI MasterFormat, replacing without change UFGS-16783N (February 2003)
Apr-2006 N UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type R To conform with CSI MasterFormat, replacing without change UFGS-13853N (August 2003)
Apr-2006 N UFGS 28 31 49 Carbon Monoxide Detectors R To conform with CSI MasterFormat, replacing without change UFGS-13856 (August 2004)
Apr-2006 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles R To conform with CSI MasterFormat, replacing without change UFGS-02459 (August 2004)
Apr-2006 N UFGS 31 62 13.26 Pressure-Injected Footings R To conform with CSI MasterFormat, replacing without change UFGS-02466 (August 2004)
Apr-2006 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement R To conform with CSI MasterFormat, replacing without change UFGS-02982 (August 2004)
Apr-2006 N UFGS 32 11 36.13 Lean Concrete Base Course R To conform with CSI MasterFormat, replacing without change UFGS-02712 (August 2004)
Apr-2006 N UFGS 32 92 23 Sodding R To conform with CSI MasterFormat, replacing without change UFGS-02922 (May 2004)
Apr-2006 N UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank R To conform with CSI MasterFormat, replacing without change UFGS-13208 (August 2004)
Apr-2006 N UFGS 33 63 13 Exterior Underground Steam Distribution System R To conform with CSI MasterFormat, replacing without change UFGS-02553 (August 2004)
Apr-2006 N UFGS 33 63 14 Exterior Buried Pumped Condensate Return R To conform with CSI MasterFormat, replacing without change UFGS-02556 (August 2004)
Apr-2006 N UFGS 33 63 23 Exterior Aboveground Steam Distribution R To conform with CSI MasterFormat, replacing without change UFGS-02554 (August 2004)
Apr-2006 N UFGS 33 82 00 Telecommunications Outside Plant (OSP) R To conform with CSI MasterFormat, replacing without change UFGS-16711 (August 2004)
Apr-2006 N UFGS 35 20 23 Dredging R To conform with CSI MasterFormat, replacing without change UFGS-02325 (August 2004)
Apr-2006 N UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft R To conform with CSI MasterFormat, replacing without change UFGS-03420N (August 2004)
Apr-2006 N UFGS 35 59 13.19 Arch-Type Rubber Marine Fenders R To conform with CSI MasterFormat, replacing without change UFGS-02397 (May 2003)
Apr-2006 N UFGS 40 17 26.00 20 Welding Pressure Piping R To conform with CSI MasterFormat, replacing without change UFGS-15216N (September 1999)
Apr-2006 N UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) R To conform with CSI MasterFormat, replacing without change UFGS-15211N (August 2003)
Apr-2006 N UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) R To conform with CSI MasterFormat, replacing without change UFGS-13401 (August 2004)
Feb-2019 N UFGS 12 35 30.23 20 Bathroom Casework R Non-technical revision; Formerly titled UFGS 12 36 00.00 20 MANUFACTURED VANITIES; In response to CCR# 7057, section number and title have been revised (with no section date change) to conform with CSI MasterFormat.
May-2019 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 2456, 5773); also address CCR 3956 – Reference NFPA 285 where required
May-2019 N UFGS 08 51 13 Aluminum Windows R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 1785, 5195, 6074), also addresses the following CCRs: 1876 - Provide bracket option for mock-ups; 2454 – Thermal performance of assembly; 2673 – Remove redundancy of hung windows; 2769 – Testing requirements for thermal performance
May-2019 N UFGS 08 81 00 Glazing R Address the following CCRs: 2253, 2342 – Separate requirements for Fire Protection and Fire Resistant Glazing; 2701 – Option for blast mitigation glazing; 3917 – Option for glazing for passive solar and dynamic control fenestration; 4302 – Option for triple glazed insulated units; 4339, 5838 – Glazing tape types; 5176 – Updated testing reference for performance of insulated glass units; 5389 – Removal of redundant information regarding insulated glass units
May-2019 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers R New title (formerly THREE-PHASE PAD-MOUNTED TRANSFORMERS) CCR changes.
May-2019 N UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS) (Preparing Authority: Army) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 N UFGS 33 71 01 Overhead Transmission and Distribution R Changes required for formatting, updating transformer efficiencies, and CCR changes.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
May-2019 N UFGS 01 35 26 Governmental Safety Requirements C 7 In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer.
May-2019 N UFGS 01 57 19 Temporary Environmental Controls C 2 In response to CCR 7194, FAR clause 52.242-14 Suspension of Work was added to the paragraph "Non-Compliance Notifications"; updated links per CCRs 7375 and 7376
Aug-2019 N UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks C 2 In response to CCR 4193, the NOTE under paragraph "SURFACE PREPARATION" (3.8) has been removed as the instructions refer to SSPC SP 12 which has been withdrawn.
Aug-2019 N UFGS 01 57 19 Temporary Environmental Controls C 3 In response to the following CCRs: #5233 - revised language in paragraph "Dust Control" (3.5.7) to reflect the Crystalline Silica hazard associated with cement and concrete products per the new OSHA Standard of Crystalline Silica; #5733 - "Stormwater Pollution Prevention Plan" has been added as a submittal item under SD-01 and in paragraph "Stormwater Pollution Prevention Plan" (3.2.1.1); #7178 - revision to clarify submittal item "Solid Waste Management Report", updated as "Monthly Solid Waste Disposal Report" in Part 1 (1.11.1) and "Project Solid Waste Disposal Documentation Report" in Part 3 (3.7.2.1) and in the Submittal Article under SD-06 and SD-11 respectively; #7179 - added a new row "C&D Debris Composted" to table under paragraph Nonhazardous Solid Waste Diversion Report (3.6.2)
Aug-2019 N UFGS 01 58 00 Project Identification R Complete review and update
Aug-2019 N UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) R New title (formerly COMMISSIONING OF FUEL FACILITIES); Section revised and enhanced to include the requirements for Initial fuel receipt, flushing, cleaning, control valve adjustments, equipment tests and performance testing for fuel facilities that are “dead-end” type; Preparing Activity has been changed from Air Force to Navy.
Aug-2019 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 6316, added paragraph to "Schedule of Work/Aircraft Operating Schedules" (3.1.2 ) to define/clarify "Existing Conditions Survey"
Aug-2019 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 1 Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.
Aug-2019 N UFGS 01 45 00.00 20 Quality Control C 3 In response to CCRs 6298 and 6299, statements requiring eOMSI/OMSI were changed to bracketed options in paragraphs "Duties Statement" (1.5.2.1) and "Test Reports and Monthly Summary Report of Tests" (1.12.5), respectively. In response to CCR 6558, Specifier Note and bracketed option were added to paragraph "Requirements" (1.6.1.1), list item k. "LIST OF DEFINABLE FEATURES"
Aug-2019 N UFGS 26 20 00 Interior Distribution System R Complete review and update
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2019 N UFGS 01 35 26 Governmental Safety Requirements C 8 In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19)
Nov-2019 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 3 In response to CCR 7497, brackets were added to the paragraph Field Administration (1.4.3) and the text was updated to clarify the disposition of the tablet computer.
Nov-2019 N UFGS 01 45 00.00 20 Quality Control C 4 In response to the following: CCR 7292, the Designer Note with instructions for bracketed sentences was removed from the paragraph COORDINATION AND MUTUAL UNDERSTANDING MEETING (1.7) since the text did not contain any brackets; CCR 7294, the Designer Note for paragraph QC ORGANIZATION (1.5) and paragraph Qualifications (1.5.1.2) has been updated to read FEAD/ROICC; CCRs 6296, 6300, 6301, OMSI has been replaced with O&M in paragraphs INFORMATION FOR THE CONTRACTING OFFICER (1.3-h.), Completion Certification (1.13.3), and DOCUMENTATION-Testing Plan and Log (1.15.4) to better align with the terminology utilized in Section 01 78 23 Operation and Maintenance Data.
Nov-2019 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 6757, paragraph FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS (1.7) was deleted as it is repetitive of requirements already noted in Section 02 82 00 ASBESTOS REMEDIATION; per CCR 6658, Air Force tailoring has been added to the paragraphs "Duties" (1.7.2.1) and FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ) (1.9) since AFCEC/CF utilizes the Red Zone processes.