UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
May-2020 A UFGS 41 24 26 Hydraulic Power Systems R Superseding UFGS 41 24 46 HYDRAULIC FLUID POWER SYSTEMS without revision to comply with MF 2011 in response to CCR 2184. Nontechnical title change.
May-2020 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Performed Tri-Annual Maintenance. CCRs #6382 & 6784 Incorporated
May-2020 S UFGS 26 56 19.00 40 Roadway Lighting R Performed Tri-Annual Maintenance.CCR #4861 Incorporated
May-2020 S UFGS 26 56 36.00 40 Flood Lighting R Performed Tri-Annual Maintenance.
May-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Performed Tri-Annual Maintenance.
Aug-2020 A UFGS 06 61 16 Solid Surfacing Fabrications R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRS as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 09 51 00 Acoustical Ceilings R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 11 00 Visual Display Units R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 14 00.20 Interior Signage R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 21 13 Toilet Compartments R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 22 39 Folding Panel Partitions R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 26 00 Wall and Door Protection R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 28 13 Toilet Accessories R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 24 13 Roller Window Shades R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 61 13 Upholstered Audience Seating R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 22 33 30.00 10 Solar Water Heating Equipment R Complete review and update.
Aug-2020 A UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable R Completely new section replacing/consolidating (previous) UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP, UFGS 28 31 49 CARBON MONOXIDE DETECTORS, UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM, and UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE.
Aug-2020 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Complete review and update.
Aug-2020 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Aug-2020 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly R Complete review and update.
Aug-2020 A UFGS 35 20 23 Dredging R Complete review and update. PA changed from NAVFAC to USACE.
Aug-2020 A UFGS 35 42 34 Reinforced Soil Slope R Complete review and update.
Aug-2020 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Aug-2020 N UFGS 08 11 13 Steel Doors and Frames R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 11 73 Sliding Fire Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 32 13 Aluminum Sliding Glass Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 13 Sectional Overhead Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 19 Vertical Lift Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 23 Steel Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 69.10 Aluminum Storm Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 52 00 Wood Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 53 00 Plastic Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 56 53 Blast Resistant Tempered Glass Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 13 34 19 Metal Building Systems R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 S UFGS 08 33 23 Overhead Coiling Doors R Periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and Submittals. Superseding UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors. Revision incorporates information from UFGS 08 34 19.10 20 and CCR 3405.
Nov-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Nov-2020 A UFGS 13 49 10 X-Ray Shielding R Complete review and update.
Nov-2020 A UFGS 27 52 24 Nurse Call System R Complete review and update.
Nov-2020 A UFGS 31 41 16 Metal Sheet Piling R Complete review and update.
Nov-2020 A UFGS 31 63 16 Augered Cast-In-Place Piles R Complete review and update including section title change from AUGER CAST GROUT PILES to AUGERED CAST-IN-PLACE PILES.
Nov-2020 A UFGS 31 68 13 Soil and Rock Anchors R Complete review and update.
Nov-2020 A UFGS 32 12 15.13 Asphalt Paving for Airfields R Complete review and update.
Nov-2020 A UFGS 33 16 15 Water Storage Steel Tanks R Complete review and update.
Nov-2020 N UFGS 31 62 13.26 Pressure-Injected Footings R Major revision to align with current industry practice.
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 13 Special Project Procedures R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 26 Governmental Safety Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 45 35 Special Inspections R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 31 62 13.24 Concrete Cylinder Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 16.16 Steel H-Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 19 Timber Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures R Section has been unified. New number and title (was 26 55 80.00 20 SURGICAL LIGHTING FIXTURES). Revised language throughout specification to replace indicative language with imperative language. Reformatted paragraphs and subsequent numbering to reflect removal of out-of-date information and/or addition of up-to-date information per latest industry standards.
Nov-2020 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
Feb-2021 A UFGS 31 10 00 Site Clearing R Superseding UFGS 31 10 00 CLEARING FOR CIVIL WORKS without revision to comply with MF 2011 in response to CCR 2083. Nontechnical section title change.
Feb-2021 A UFGS 31 21 00 Off-Gassing Mitigation R Superseding UFGS 31 21 00 PIPING; OFF-GAS without revision to comply with MF 2011 in response to CCR 2086. Nontechnical title change.
Feb-2021 A UFGS 31 36 00 Gabions R Superseding UFGS 31 36 00 WIRE MESH GABIONS[ AND MATTRESSES] without revision to comply with MF 2011 in response to CCR 2091. Nontechnical title change.
Feb-2021 A UFGS 31 62 23.13 Concrete-Filled Steel Piles R Superseding UFGS 31 62 23.13 CAST-IN-PLACE CONCRETE PILES, STEEL CASING without revision to comply with MF 2011 in response to CCR 2095. Nontechnical title change.
Feb-2021 A UFGS 32 84 23 Underground Sprinklers R Superseding UFGS 32 84 23 UNDERGROUND SPRINKLER SYSTEMS without revision to comply with MF 2011 in response to CCR 2136. Nontechnical title change.
Feb-2021 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) R Superseding UFGS 33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM without revision to comply with MF 2011 in response to CCR 2138. Nontechnical title change.
Feb-2021 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type R Complete review and update.
Feb-2021 N UFGS 01 33 29 Sustainability Requirements and Reporting R Revised to align with industry standards; to align with UFC 1-200-02 revision; to combine DB and DBB requirements into a Tri-Service, tailorable spec; and reorganized paragraphs into hierarchical presentation. Titled changed from "SUSTAINABILITY REPORTING" to "SUSTAINABILITY REQUIREMENTS AND REPORTING"
Feb-2021 N UFGS 08 71 63.10 Electrical Locking Control for Brigs R Complete review of section.
Feb-2021 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System R Complete review and update.
Feb-2021 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System R Complete review and update.
Feb-2021 N UFGS 09 90 00 Paints and Coatings R Complete review and update.
Feb-2021 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R Revised in response to the following: CCR 9541- title has been changed from "EXTERIOR COATING OF STEEL STRUCTURES" to "HIGH PERFORMANCE COATING FOR STEEL STRUCTURES"; CCR 9540 – 2.2 COATING SYSTEM – to allow 100% shop coating; CCR 9542 – SSPC requirements confirmed; and CCR # 9543 – Added notes to designer to carefully coordinate Division 05 and Division 08 UFGS when used. Indicated that this UFGS is required for coating of components indicated in UFC 4-211-01.
Feb-2021 N UFGS 26 27 14.00 20 Electricity Metering R Complete review and update.
Feb-2021 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks R Replacing without change UFGS-33 01 50.60 / Non-technical Section Number change
May-2021 A UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures R Complete review and update.
May-2021 A UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems R Complete review and update.
May-2021 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems R Complete review and update.
May-2021 A UFGS 25 08 10 Utility Monitoring and Control System Testing R Complete review and update.
May-2021 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices R Complete review and update.
May-2021 A UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type R Complete review and update.
May-2021 A UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder R Complete review and update.
May-2021 A UFGS 46 24 16 Comminutors R Complete review and update.
May-2021 A UFGS 46 51 00.00 10 Air and Gas Diffusion System R Complete review and update including section title change.
May-2021 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System R Complete review and update including section title change.
May-2021 A UFGS 46 61 00 Filtration Equipment R Complete review and update.
May-2021 A UFGS 46 66 56 Open-Channel Disinfection Equipment R Complete review and update.
May-2021 N UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear R Complete review and update.
May-2021 N UFGS 26 27 29 Marina Electrical Work R Complete review and update.
Aug-2021 A UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures R Complete review and update.
Aug-2021 A UFGS 23 23 00 Refrigerant Piping R Complete review and update.
Aug-2021 A UFGS 26 28 01.00 10 Coordinated Power System Protection R Complete review and update.
Aug-2021 N UFGS 08 34 16.20 Vertical Lift Fabric Doors R General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.
Aug-2021 N UFGS 23 54 19 Building Heating Systems, Warm Air R Complete revision; supersedes UFGS 23 82 01.00 10 WARM AIR HEATING SYSTEMS
Aug-2021 N UFGS 26 24 13 Switchboards R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter R Complete review and update.
Aug-2021 N UFGS 26 56 00 Exterior Lighting R Complete review. Revised to incorporate CCRs.
Aug-2021 N UFGS 33 71 02 Underground Electrical Distribution R Complete review. Revised to incorporate CCRs.
Nov-2021 A UFGS 26 11 14.00 10 Main Electric Supply Station and Substation R Complete review and update.
Nov-2021 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Revised to include corrosion requirements, update standards, and apply ESC and humidity factor requirements for choosing materials.
Nov-2021 A UFGS 32 31 26 Wire Fences and Gates R Revised to include corrosion requirements, update standards, and apply ESC and humidity factor requirements for choosing materials.