UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Nov-2012 S UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Modified subparts 1.4 and 1.4 to add Primavera P6
Nov-2012 S UFGS 01 33 00 Submittal Procedures C 2 In the last paragraph of the General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag
Nov-2012 A UFGS 01 45 35 Special Inspections C 1 Section title change only; formerly SPECIAL INSPECTION FOR SEISMIC- RESISTING SYSTEMS
Nov-2012 S UFGS 03 62 16 Metallic Non-Shrink Grouting C 1 There was an incomplete statement in Subpart 2.1, which has been corrected
Nov-2012 A UFGS 04 20 00 Unit Masonry C 1 CCR: 2299: Added provisions for telescoping bar positioners
Nov-2012 S UFGS 05 14 00.13 Welding Structural Aluminum Framing C 2 Updated CSI Section Format per latest UFC 1-300-02, - Added Subpart 1.3, deleted Subpart 1.4
Nov-2012 S UFGS 05 52 00 Metal Railings C 2 Imperative language
Nov-2012 S UFGS 07 41 63 Fabricated Roof Panel Assemblies C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes
Nov-2012 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes
Nov-2012 A UFGS 08 33 13 Coiling Counter Doors C 2 CCR 1919: added test tags and warranty submittal
Nov-2012 S UFGS 08 33 23 Overhead Coiling Doors C 1 Updated Section Format per latest UFC 1-300-02,removed text (redundant) text from Submittal Article and located info in body of the text in the appropriate Part; added testing tags at several locations.
Nov-2012 A UFGS 08 34 59 Vault Doors and Day Gates C 1 Added Sustainability Requirements
Nov-2012 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes.
Nov-2012 A UFGS 09 24 23 Cement Stucco C 1 Added Sustainability Requirements
Nov-2012 S UFGS 09 23 82 Fireproof Gypsum Plastering C 1 Updated CSI Section Format per latest UFC 1-300-02; added Subpart 1.2,1.2.1
Nov-2012 S UFGS 09 67 23.13 Standard Resinous Flooring C 1 Updated CSI Section Format per latest UFC 1-300-02; modified Submittal Article; modified titles in Subpart 3.2.4, 3.3.1, 3.3.2 and 3.3, other minor revisions
Nov-2012 S UFGS 12 36 00 Countertops C 2 Modified Submittal Article; minor revisions
Nov-2012 S UFGS 12 48 13.13 Entrance Floor Mats C 2 Imperative language
Nov-2012 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping C 1 Modified Submittal Article; minor revisions
Nov-2012 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment C 2 Modified Submittal Article; minor changes to the heading titles in table to resolve the issues of the CCR #589; imperative language; added some TST tags
Dec-2012 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 2 INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section.
Nov-2012 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 1 CCR 836: deleted aboveground cold pipe phenolic insulation
Nov-2012 S UFGS 23 22 23.00 40 Steam Condensate Pumps C 2 Submittal Article compliance, deleted Subpart 1.3.1, added Subpart 1.4, 1.4.1, 1.4.2; imperative language
Nov-2012 S UFGS 23 36 00.00 40 Air Terminal Units C 1 Modified Submittal Article; imperative language; minor revisions
Nov-2012 S UFGS 23 37 13.00 40 Diffusers, Registers, and Grills C 1 Submittal Article compliance
Nov-2012 S UFGS 23 41 13.00 40 Panel Filters C 1 Submittal Article compliance
Nov-2012 S UFGS 26 53 00.00 40 Exit Signs C 1 Submittal Article compliance, title change in Subpart 1.2, added Subpart 1.2.1; imperative language
Nov-2012 S UFGS 27 21 00.00 40 Intercommunication System C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; modified text in General Not and Part 1, deleted Subpart 1.2, 1.3, 1.3.1, 1.3.2, 1.3.3,added Subpart 2.1 - 2.1.1.3, modified 2.2.4 - 2.2.4.2; Submittal Article compliance, Imperative language
Nov-2012 S UFGS 32 31 13 Chain Link Fences and Gates C 1 CCR #893 - modified Subpart 2.5, 2.18; CCR #2148 - modified Subpart 3.19
Nov-2012 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Modified subpart 3.1.1.1; added AWWA C515 throughout
Nov-2012 N UFGS 33 71 02.00 20 Underground Electrical Distribution C 1 Modified subpart 1.4.2
Nov-2012 S UFGS 40 17 30.00 40 Welding General Piping C 1 Tri-Annual Database Maintenance and the revisions are minor - modified Subpart 1.3.1, 1.5, 3.1.1.2, 3.2.1, 3.3, 3.3.1
Nov-2012 A UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas C 1 Replace reference to ASA S2.19 with ISO 1940-1
Nov-2012 N UFGS 46 43 21 Circular Clarifier Equipment C 1 Removed note before Part 1; modified note in subpart 2.2.1
Aug-2012 S UFGS 01 30 00 Administrative Requirements C 1 Modified subpart 1.10
Aug-2012 S UFGS 01 33 00 Submittal Procedures C 1 Per Action Item 41, inserted a Note into subparts 1.4.1, 1.4.3, 1.11.4, where users can obtain the Section 01 33 16; Replace the CONSTRUCTION tailoring option tag with DESIGN-BID- BUILD in subparts 1.1, 1.2.1, 1.4.2, 1.4.6, 1.10.4.1, 1.14, 1.16
Aug-2012 N UFGS 01 35 26 Governmental Safety Requirements C 1 Modified subpart 1.7
Aug-2012 N UFGS 01 78 23 Operation and Maintenance Data C 1 Modified subparts 1.2, 1.2.2, 1.2.3, 1.2.4 and 1.4-g
Aug-2012 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made.
Aug-2012 S UFGS 03 47 13 Tilt-Up Concrete C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made
Aug-2012 N UFGS 05 12 00 Structural Steel C 1 Modified subparts 1.6.2.1, 2.2.4.1, 3.2.1, 3.3, 3.9.3, 3.9.4.2
Aug-2012 S UFGS 05 14 00.13 Welding Structural Aluminum Framing C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made
Aug-2012 N UFGS 05 30 00 Steel Decks C 1 Removed subparts 2.3.3 Open Beam... and 3.3 Joint Sealing for Roof Decks; modified subpart 3.2.4.6
Aug-2012 N UFGS 05 40 00 Cold-Formed Metal Framing C 1 Modified subparts 1.2 (SD-07), 1.3, 1.6, 2.1, 2.1.1, 2.1.2, 3.2; removed 2.4 "Paint"
Aug-2012 S UFGS 05 52 00 Metal Railings C 1 Updated Imperative Language; no technical content changes have been made
Aug-2012 S UFGS 26 60 13.00 40 Low-Voltage Motors C 1 Minor changes; no technical content changes have been made
Aug-2012 A UFGS 33 30 00 Sanitary Sewerage C 1 Added provisions to allow polypropylene pipe
Aug-2012 A UFGS 33 40 00 Stormwater Utilities C 1 Per CCR 1438, changed AASHTO M 198 to ASTM C990
Aug-2017 S UFGS 01 33 00 Submittal Procedures C 10 Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military construction and military family housing activities.: Changed MSDS to SDS
Aug-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Aug-2017 N UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Nov-2016 S UFGS 01 33 00 Submittal Procedures C 9 Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Nov-2016 N UFGS 01 35 26 Governmental Safety Requirements C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Nov-2016 N UFGS 07 31 13 Asphalt Shingles C 1 In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles."
Nov-2016 A UFGS 09 65 00 Resilient Flooring C 2 In response to CCR 4916, Luxury Vinyl Tile added.
Nov-2016 N UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures C 1 Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions.
Nov-2016 S UFGS 12 31 00 Manufactured Metal Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN.
Nov-2016 S UFGS 12 34 00 Manufactured Plastic Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 36 00 Countertops C 1 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 48 13 Entrance Floor Mats and Frames C 3 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE.
Nov-2016 N UFGS 26 51 00 Interior Lighting C 1 Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards.
Nov-2016 A UFGS 31 11 00 Clearing and Grubbing C 1 Added herbicide requirements.
Nov-2016 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements C 1 Clarified sandblasting requirements.
May-2016 N UFGS 05 30 00 Steel Decks C 1 Revised text in subpart 3.9.3 and relocated applicable Specifier Note below subpart 3.9.3 title.
Aug-2015 A UFGS 01 78 00 Closeout Submittals C 2 Adjusted Operation and Maintenance Manual requirements. Deleted Preventive Maintenance and list of installed equipment requirements.
Aug-2015 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Changes coordinated with section 01 78 23 revision. Moved training and O&M Manual format to 01 78 23. Added resolutions in event of discrepancies in provided FDW, and unsuccessful Field Verification.
Aug-2015 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 07 21 23 Loose Fill Thermal Insulation C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 S UFGS 08 34 73 Sound Control Door Assemblies C 1 CCR #4297, Subpart 3.3, changed FSTC to ASTC
Aug-2015 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 51 13 Aluminum Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 51 23 Steel Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 52 00 Wood Windows C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 53 00 Plastic Windows C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 08 81 00 Glazing C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 11 72 13 Medical Equipment, Miscellaneous C 1 CCR 4172: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 11 74 00 Dental Equipment C 1 CCR 4173: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 13 17 43 Hydrotherapy Equipment C 1 CCR 4174: removed reference ASTM A167, withdrawn with no replacement
Aug-2015 N UFGS 22 00 00 Plumbing, General Purpose C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 4 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 09 53.00 20 Space Temperature Control Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 52 00 Heating Boilers C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 54 19 Building Heating Systems, Warm Air C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 A UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Pages