Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2010 N UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type R Section References (SRF) update
Feb-2010 N UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System R Section References (SRF) update
Feb-2010 N UFGS 32 05 33 Landscape Establishment R Reference Identifier (RID) and Section References (SRF) updates
Feb-2010 N UFGS 32 93 00 Exterior Plants R Reference Identifier (RID) and Section References (SRF) updates
Feb-2010 N UFGS 32 96 00 Transplanting Exterior Plants R Reference Identifier (RID) and Section References (SRF) updates
Feb-2010 A UFGS 33 01 50.01 Cleaning Fuel Storage Tanks N New section
Feb-2010 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling N New section
Feb-2010 A UFGS 33 08 53 Aviation Fuel Distribution System Start-Up N New section
Feb-2010 A UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) N New section
Feb-2010 A UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) N New section
Feb-2010 A UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) N New section
Feb-2010 A UFGS 33 40 00 Stormwater Utilities R In response to CCR 2210, tailoring options for Pipe Materials added.
Feb-2010 A UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment N New section
Feb-2010 A UFGS 33 52 43.12 Aviation Fuel Pantographs N New section
Feb-2010 A UFGS 33 52 43.13 Aviation Fuel Piping N New section
Feb-2010 A UFGS 33 52 43.14 Aviation Fuel Control Valves N New section
Feb-2010 A UFGS 33 52 43.23 Aviation Fuel Pumps N New section
Feb-2010 A UFGS 33 52 43.28 Filter Separator, Aviation Fueling System N New section
Feb-2010 N UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems R Section References (SRF) update
Feb-2010 N UFGS 33 52 90.00 20 Welding for POL Service Piping R Section References (SRF) update; references to section UFGS 33 52 43.30 (formerly 15899) have been replaced by UFGS 33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
Feb-2010 N UFGS 33 61 14 Exterior Buried Preinsulated Water Piping R Section References (SRF) update
Feb-2010 N UFGS 34 43 00.00 20 Airfield Lighting R Section References (SRF) update
Feb-2010 N UFGS 35 59 13.14 20 Polymeric Piles R Section References (SRF) update
Dec-2009 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R INTERIM RELEASE: Section revised
Dec-2009 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R INTERIM RELEASE: Updated Criteria
Dec-2009 A UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems R INTERIM RELEASE: Restored to version prior to Nov-08 release
Dec-2009 A UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration R INTERIM RELEASE: Restored to version prior to Nov-08 release
Nov-2009 N UFGS 01 30 00 Administrative Requirements R Deleted paragraph 1.15
Nov-2009 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Major revision
Nov-2009 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Major revision
Nov-2009 N UFGS 01 45 02 NAVFAC Quality Control R Revised paragraph 1.7
Nov-2009 A UFGS 03 01 30 Restoration of Concrete in Historic Structures R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 01 32 Concrete Rehabilitation for Civil Works R Extensive reformat for conformance with CSI SectionFormat
Nov-2009 A UFGS 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 15 14.00 10 Expansion Contraction and Construction Joints in Concrete for Civil Works R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 23 00 Stressed Tendon Reinforcing R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 31 00.00 10 Cast-in-Place Structural Concrete R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Compliance with CSI SectionFormat
Nov-2009 N UFGS 03 31 29 Marine Concrete with Service Life Modeling R Corrected table under subpart 2.1.2e
Nov-2009 A UFGS 03 33 00 Cast-In-Place Architectural Concrete R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 37 00 Preplaced-Aggregate Concrete R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 37 13 Shotcrete R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 37 23 Roller-Compacted Concrete for Mass Concrete Construction R Compliance with CSI SectionFormat
Nov-2009 A UFGS 03 37 29 Concrete for Concrete Cutoff Walls R Compliance with CSI SectionFormat
Nov-2009 A UFGS 04 01 40 Restoration and Cleaning of Masonry in Historic Structures R Extensive reformat for conformance with CSI SectionFormat
Nov-2009 A UFGS 04 21 26 Glazed Structural Clay Tile and Prefaced Concrete Masonry R Compliance with CSI SectionFormat
Nov-2009 A UFGS 04 23 00 Glass Unit Masonry R Compliance with CSI SectionFormat
Nov-2009 N UFGS 06 10 00 Rough Carpentry R Modified AWPA publication reference designations and other minor changes
Nov-2009 S UFGS 08 34 73 Sound Control Door Assemblies R Major maintenance
Nov-2009 A UFGS 09 97 02 Painting: Hydraulic Structures R Updated paint systems
Nov-2009 N UFGS 21 13 19.00 20 [Deluge] [Preaction] Fire Sprinkler Systems R Removed paragraph 1.2.1 regarding Y2K
Nov-2009 N UFGS 21 13 20.00 20 Foam Fire Extinguishing for Aircraft Hangars R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 21 13 21.00 20 Foam Fire Extinguishing for Fuel Tank Protection R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 21 13 22.00 20 Foam Fire Extinguishing for Haz/Flam Material Facility R Removed paragraph 1.2 regarding Y2K
Nov-2009 N UFGS 21 21 01.00 20 Carbon Dioxide Fire Extinguishing (High Pressure) R Removed paragraph 1.2 regarding Y2K
Nov-2009 N UFGS 21 21 02.00 20 Carbon Dioxide Fire Extinguishing (Low Pressure) R Removed paragraph 1.2 regarding Y2K
Nov-2009 N UFGS 21 22 00.00 20 Halon 1301 Fire Extinguishing R Removed paragraph 1.2 regarding Y2K
Nov-2009 N UFGS 22 00 00 Plumbing, General Purpose R Removed 1st 2 items under SD-03 Product Data and paragraph 1.10; other minor changes
Nov-2009 N UFGS 22 15 19.13 20 Large Nonlubricated Reciprocating Air Compressors (Over 300 HP) R Removed paragraph 1.3 regarding Y2K
Nov-2009 N UFGS 22 15 19.19 20 Nonlubricated Rotary Screw Air Compressors (100 HP and Larger) R Removed paragraph 1.3 regarding Y2K
Nov-2009 N UFGS 22 16 19.26 20 Large Centrifugal Air Compressors (Over 200 HP) R Removed paragraph 1.2 regarding Y2K
Nov-2009 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's
Nov-2009 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems R Revised firestopping to close a CCR
Nov-2009 N UFGS 23 22 26.00 20 Steam System and Terminal Units R Removed paragraph 1.2.4.5 regarding Y2K
Nov-2009 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers R Major revision
Nov-2009 N UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators R Removed paragraph 1.4 regarding Y2K
Nov-2009 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade R Revisions throughout including, but not limited to, Pneumatic-Tired Rollers, Submittals, Mix Design, Installation, Sampling and Testing, Field Quality Control
Nov-2009 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements R Revisions throughout including, but not limited to, Test Section, Portland Cement, aggregate blending, other finishing equipment and broom finish
Nov-2009 N UFGS 32 84 24 Irrigation Sprinkler Systems R Removed paragraph 1.2 regarding Y2K and paragraph 1.9
Nov-2009 N UFGS 33 11 00 Water Utility Distribution Piping R Section References (SRF) update
Nov-2009 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping R Removed paragraph 1.2 regarding Y2K, removed Y2K info from SD-07 Certificates and paragraphs 1.7 and 2.1 including note in between
Nov-2009 N UFGS 33 52 43.00 20 Aviation Fuel Distribution and Dispensing R Removed paragraph 1.2.1 regarding Y2K
Nov-2009 N UFGS 33 52 90.00 20 Welding for POL Service Piping R Section References (SRF) update: references to sections 15899 and 13004 have been replaced with UFGS 33 52 43.30 and UFGS 33 08 55 respectively
Nov-2009 N UFGS 44 42 13.00 20 Aeration Equipment R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 44 42 23 Circular Clarifier R Removed paragraph 1.2 regarding Y2K, SD-07 Certificates, and paragraph 1.8
Nov-2009 N UFGS 44 42 39 Grit Collecting Equipment R Removed paragraph 1.3 regarding Y2K and SD-07 Certificates
Aug-2009 N INACTIVE-UFGS 09 97 13.15 Low VOC Polysulfide Interior Coating of Welded Steel Petroleum Fuel Tanks R Section References (SRF) update
Aug-2009 N UFGS 01 20 00.00 20 Price and Payment Procedures R Updated the last criteria NOTE (Costloaded NAS) in the introduction; updated paras 1.3, 1.5,1.6, 1.7.2.
Aug-2009 N UFGS 01 35 26 Governmental Safety Requirements R Major revision
Aug-2009 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised USACE Project Sign requirements
Aug-2009 N UFGS 01 58 00 Project Identification R Minor revisions
Aug-2009 N UFGS 03 31 29 Marine Concrete with Service Life Modeling R Major revision
Aug-2009 A UFGS 05 21 13 Deep Longspan Steel Joist Framing R Extensive reformat for conformance with CSI SectionFormat
Aug-2009 A UFGS 05 21 16 Longspan Steel Joist Framing R Extensive reformat for conformance with CSI SectionFormat
Aug-2009 A UFGS 05 59 13 Fabrication of Hydraulic Steel Structures N New section
Aug-2009 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Compliance with CSI SectionFormat
Aug-2009 A UFGS 06 61 16 Solid Surfacing Fabrications R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 31 26 Slate Shingles R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 55 00 Protected Membrane Roofing (PMR) R Compliance with CSI SectionFormat
Aug-2009 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing R Minor revisions
Aug-2009 A UFGS 07 61 01 Copper Roof System R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 62 10 Copper Sheet Metal Flashing R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 72 00 Roof Ventilators, Gravity-Type R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 34 01 Forced Entry Resistant Components R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 34 02 Bullet-Resistant Components R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 39 54 Blast Resistant Doors R Compliance with CSI SectionFormat
Aug-2009 N UFGS 08 51 13 Aluminum Windows R Major revision
Aug-2009 A UFGS 08 52 70 Wood Windows - Repair and Rehabilitation R Compliance with CSI SectionFormat