UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Feb-2019 A UFGS 03 11 19.00 Insulating Concrete Forming D This UFGS (03 11 19.00 10) is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 15 00.00 10 Concrete Accessories D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 20 00.00 10 Concrete Reinforcing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 30 00.00 10 Cast-In-Place Concrete D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 35 00.00 10 Concrete Finishing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 39 00.00 10 Concrete Curing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) R Complete review and update including section title change from BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES) to BLAST RESISTANT DOORS (EARTH COVERED MAGAZINES). PA changed from NAVFAC to ARMY.
Feb-2019 A UFGS 21 13 25 High-Expansion Foam System, Fire Protection N New UFGS.
Feb-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC R Complete review and update.
Feb-2019 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems R Complete review and update.
Feb-2019 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems R Complete review and update.
Feb-2019 A UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration R Complete review and update.
Feb-2019 A UFGS 26 54 21.00 10 Helipad Lighting and Visual Navigation Aids D Superseded by UFGS 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 26 56 20 Airfield and Heliport Lighting and Visual Navigation Aids N Superseding UFGS 26 54 21.00 10 HELIPAD LIGHTING AND VISUAL NAVIGATION AIDS, UFGS 26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS, and UFGS 34 43 00.00 20 AIRFIELD LIGHTING. Complete review and update.
Feb-2019 A UFGS 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids D Superseded by UFGS 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 32 12 15.16 Stone Matrix Asphalt (SMA) for Airfield Paving N Section number reinstated; Superseding UFGS 32 13 17 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS. Complete review and update including section number and title changes.
Feb-2019 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements D Superseded by UFGS 32 12 15.16 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 33 40 00 Stormwater Utilities C 6 Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.
Feb-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 2 Updated Hydroelectric Design Center (HDC) phone number and ER reference in response to CCR 7048.
Apr-2006 A UFGS 27 05 14.00 10 Cable Television Premises Distribution System R To conform with CSI MasterFormat, replacing without change UFGS-16815A (December 2004)
Apr-2006 A UFGS 27 41 16.00 10 Television Signal Reception System R To conform with CSI MasterFormat, replacing without change UFGS-16785A (December 2004)
Apr-2006 A UFGS 27 51 16 Public Address Systems R To conform with CSI MasterFormat, replacing without change UFGS-16770 (November 2003)
May-2019 A UFGS 01 78 00 Closeout Submittals R Complete review and update.
May-2019 A UFGS 01 91 00.15 10 Total Building Commissioning N This UFGS is for Army and Air Force use only; superseding UFGS 01 91 00.15 TOTAL BUILDING COMMISSIONING for Army and Air Force requirements only. Note: 01 91 00.15 is now for Navy use only, USACE remains the Preparing Activity [until 05-2020].
May-2019 A UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 A UFGS 26 33 53 Static Uninterruptible Power Supply (UPS) N Superseding UFGS 26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA CAPACITY and UFGS 26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS).
May-2019 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks R Complete review and update.
May-2019 A UFGS 04 20 00 Unit Masonry C 2 Added sentence to paragraph 2.6.2.7 in response to CCR 7025.
May-2019 A UFGS 11 13 19.13 Loading Dock Levelers C 1 Added reference publications MHI MH30.1, MHI MH30.3, ASTM D624, and ASTM D2632 in response to CCR 7391.
May-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 3 Updated list of allowable materials in paragraph 2.2 in response to CCR 6444, CCR 6719, and CCR 7165.
Aug-2019 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) C 2 Updated RMS requirements in paragraph 1.4 and deleted paragraph 1.5 in response to CCR 7627.
Aug-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
Aug-2019 A UFGS 23 52 00 Heating Boilers C 4 Revised paragraph 2.12.14 in response to CCR 7344.
Aug-2019 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness R Complete review and update.
Aug-2019 A UFGS 07 27 10.00 10 Building Air Barrier System R Complete review and update.
Aug-2019 A UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements R Complete review and update.
Aug-2019 A UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines R Complete review and update including section title change from NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION to NATURAL-GAS / LIQUEFIED PETROLEUM GAS DISTRIBUTION PIPELINES.
Nov-2019 A UFGS 03 55 16 Gypsum Concrete Floor Planks D Section is obsolete and no longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers R Complete review and update.
Nov-2019 A UFGS 32 11 13.13 Lime Treated Subgrade N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 11 29 LIME-[STABILIZED][MODIFIED] SUBGRADE and UFGS 32 11 30 LIME TREATED SUBGRADE [LIME MODIFIED SOILS]
Nov-2019 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade D Superseded by UFGS 32 11 13.13 LIME TREATED SUBGRADE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 18 Resin Modified Pavement Surfacing Material D Superseded by UFGS 32 12 19.16 RESIN-MODIFIED ASPHALT PAVING WEARING COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) D Superseded by UFGS 32 12 16.19 COLD-MIX ASPHALT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 18 RESIN MODIFIED PAVEMENT SURFACING MATERIAL.
Nov-2019 A UFGS 32 13 73 Compression Joint Seals for Concrete Pavements D Superseded by UFGS 32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS.
Nov-2019 A UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 16 15 CONCRETE BLOCK PAVEMENTS.
Nov-2019 A UFGS 32 16 15 Concrete Block Pavements D Superseded by UFGS 32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 34 73 13 Aircraft Tiedowns R Complete review and update to meet MF2016 and UFC 1-300-02 including section title change from MOORING AND GROUNDING POINTS FOR AIRCRAFT to AIRCRAFT TIEDOWNS.
Nov-2019 A UFGS 34 73 16 Airfield Grounding N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT.
Nov-2019 A UFGS 40 95 00 Process Control R Complete review and update.
Nov-2019 A UFGS 32 12 16.19 Cold-Mix Asphalt Paving N Section Number has been reinstated. Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 19 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX).
Nov-2019 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment C 1 Updated paragraphs 2.2 and 2.3 in response to CCR 6932.
Nov-2019 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 1 Updated paragraphs 2.3, 2.4.1, and 2.5 in response to CCR 6932.
Nov-2019 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC C 1 Added new paragraph 1.1.1 to accommodate a recent change in Navy policy.
Nov-2019 A UFGS 23 52 00 Heating Boilers C 5 Updated designer's note on page 15 in response to CCR 6454.
Nov-2019 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) C 1 Updated paragraphs 2.3.11.3, 2.3.14, 3.5.2.1, and 3.5.2.2 to remove "brand name or approved equal" language in response to CP/DWG discussions.
Feb-2020 A UFGS 09 97 02 Painting: Hydraulic Structures R Complete review and update.
Feb-2020 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Complete review and update including section title change from HIGH-SECURITY CHAIN LINK FENCES AND GATES to HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES.
Feb-2020 A UFGS 32 31 26 Wire Fences and Gates R Complete review and update.
Feb-2020 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall D Superseded by UFGS 32 32 23.13 SEGMENTAL CONCRETE BLOCK RETAINING WALL. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall N Superseding UFGS 32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL. Complete review and update including section number change from 32 32 23 to 32 32 23.13.
Feb-2020 A UFGS 33 01 50.31 Leak Detection For Fueling Systems N Superseding UFGS 33 58 00 LEAK DETECTION FOR FUELING SYSTEMS. Complete review and update including section number change from 33 58 00 to 33 01 50.31.
Feb-2020 A UFGS 33 58 00 Leak Detection for Fueling Systems D Superseded by UFGS 33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 34 41 26.00 10 Access Control Point Control System D Section is no longer required. Superseded by UFGS 34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls R Complete review and update including section title change from ACTIVE VEHICLE BARRIERS to CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS. Superseding UFGS 34 41 26.00 10 ACCESS CONTROL POINT CONTROL SYSTEM.
Feb-2020 A UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical D Superseded by new (Navy) UFGS 46 07 53 PACKAGED WASTEWATER TREATMENT EQUIPMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 01 45 00.00 10 Quality Control C 1 Added hyperlink to paragraph 3.7.2 in response to CCR 7765.
Feb-2020 A UFGS 07 27 10.00 10 Building Air Barrier System C 1 Revised paragraph 1.7 to update air barrier inspector qualification requirements.
Feb-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 2 Updated paragraphs 2.4 and 2.4.7 in response to CCR 7072.
Feb-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 3 Updated paragraph 2.13 a. in response to CCR 2691.
Feb-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.
Feb-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 6 Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Feb-2020 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters C 1 Updated paragraph 2.1.1 in response to CCR 3988.
Feb-2020 A UFGS 23 82 01.00 10 Warm Air Heating Systems C 1 Updated section reference in paragraph 2.11.6 in response to CCR 5140.
Feb-2020 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System C 1 Deleted reference from paragraphs 3.9.1.1 and 3.9.1.2 in response to CCR 2504. Updated paragraph 2.4.4 in response to CCR 3271.
Feb-2020 A UFGS 35 41 00 Levee Construction C 1 Incorporated changes to provide clarification to the responsibility of the contractor related to subsurface interpretation in paragraph 1.6.3; temporary excavation slopes in paragraph 3.9.5; and slope failure and sliding due to fault or negligence of the contractor in paragraph 3.11.
Feb-2020 A UFGS 40 05 13 Pipelines, Liquid Process Piping C 2 Updated references and paragraph 2.14.1 in response to CCR 79.
Feb-2020 A UFGS 48 06 15 Turbine Oil C 1 Updated paragraphs 1.4, 2.1.1, 2.1.2, 2.2, 2.3 and 2.4 in response to CCR 4578.
May-2020 A UFGS 11 82 19 Packaged Incinerators N This UFGS number and title has been reinstated, with Army serving as Preparing Activity; Superseding UFGS 11 82 20 INCINERATORS, GENERAL PURPOSE without revision (nontechnical number and title change) to comply with MF 2011 in response to CCR 1999.
May-2020 A UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets N This UFGS number has been reinstated. The section has undergone a complete review and update as well as a title change from BITUMINOUS BASE COURSE to HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND STREETS.
May-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
May-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 1 Updated reference publications in response to CCR 8209.
May-2020 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) C 1 Revised 1st editor's note in response to CCR 7534.
May-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
May-2020 A UFGS 11 71 00 Sterilizers and Associated Equipment R Complete review and update including section title change from WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT to STERILIZERS AND ASSOCIATED EQUIPMENT.
May-2020 A UFGS 11 82 20 Incinerators, General Purpose D Superseded by UFGS 11 82 19 PACKAGED INCINERATORS without revision to comply with MF 2011 in response to CCR 1999. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment N Superseding UFGS 13 48 00 [SEISMIC ]BRACING FOR MISCELLANEOUS EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Nontechnical number and title change.
May-2020 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment D Superseded by UFGS 13 48 73 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 23 11 20 Facility Gas Piping N Superseding UFGS 23 11 25 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Nontechnical number change. Updated reference in paragraphs 2.8 and 2.9 in response to CCR 6024.
May-2020 A UFGS 23 11 25 Facility Gas Piping D Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.

Pages