Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated August 18, 2023; Posted August 24, 2023

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   SpecsIntact (SEC) in compressed ZIP  |   Adobe Acrobat (PDF)

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems   02-01-2017  PDF |  ZIP  CCR
UFGS 23 22 13.35 40 Steam Traps   02-01-2017  PDF |  ZIP  CCR
UFGS 23 34 23.00 40 HVAC Power Ventilators   02-01-2017  PDF |  ZIP  CCR
UFGS 32 01 13.64 Bituminous Pavement Liquid Rejuvenating   02-01-2017  PDF |  ZIP  CCR
UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving   02-01-2017  PDF |  ZIP  CCR
UFGS 23 09 13.34 40 Control Valves, Self-Contained   02-01-2017  PDF |  ZIP  CCR
UFGS 08 34 16 Corrosion Control Hangar Doors   05-01-2017  PDF |  ZIP  CCR
UFGS 32 12 13 Bituminous Tack and Prime Coats   05-01-2017  PDF |  ZIP  CCR
UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units   05-01-2017  PDF |  ZIP  CCR
UFGS 40 18 00.00 40 Vacuum Systems Process Piping   05-01-2017  PDF |  ZIP  CCR
UFGS 05 50 13 Miscellaneous Metal Fabrications   05-01-2017  PDF |  ZIP  CCR
UFGS 23 74 33.00 40 Packaged, Outdoor Heating and Cooling Makeup Air-Conditioners   05-01-2017  PDF |  ZIP  CCR
UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving   05-01-2017  PDF |  ZIP  CCR
UFGS 32 15 00 Aggregate Surfacing   05-01-2017  PDF |  ZIP  CCR
UFGS 23 82 19.00 40 Fan Coil Units   05-01-2017  PDF |  ZIP  CCR
UFGS 42 22 00.00 40 Process Chillers and Coolers   05-01-2017  PDF |  ZIP  CCR
UFGS 23 82 23.00 40 Unit Ventilators   05-01-2017  PDF |  ZIP  CCR
UFGS 08 31 00 Access Doors and Panels   05-01-2017  PDF |  ZIP  CCR
UFGS 23 82 43.00 40 Electric Duct Heaters   05-01-2017  PDF |  ZIP  CCR
UFGS 48 14 00 Solar Photovoltaic Systems   05-01-2017  PDF |  ZIP  CCR
UFGS 23 82 46.00 40 Electric Unit Heaters   05-01-2017  PDF |  ZIP  CCR
UFGS 48 15 00 Wind Generator System   05-01-2017  PDF |  ZIP  CCR
UFGS 48 16 00 Landfill Gas Systems   05-01-2017  PDF |  ZIP  CCR
UFGS 08 11 16 Aluminum Doors and Frames   05-01-2017  PDF |  ZIP  CCR
UFGS 32 01 18.71 Grooving of Airfield Paving   05-01-2017  PDF |  ZIP  CCR
UFGS 32 12 36.13 Asphaltic Seal and Fog Coats   05-01-2017  PDF |  ZIP  CCR
UFGS 11 05 40 Common Work Results for Foodservice Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 46 31 11 Chlorine Gas Feed Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 33 11 13 Potable Water Supply Wells   08-01-2017  PDF |  ZIP  CCR
UFGS 11 06 40.13 Foodservice Equipment Schedule   08-01-2017  PDF |  ZIP  CCR
UFGS 12 59 00 Systems Furniture   08-01-2017  PDF |  ZIP  CCR
UFGS 23 21 23 Hydronic Pumps   08-01-2017  PDF |  ZIP  CCR
UFGS 11 31 13 Electric Kitchen Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 10 14 00.10 Exterior Signage   08-01-2017  PDF |  ZIP  CCR
UFGS 32 18 16.13 Playground Protective Surfacing   08-01-2017  PDF |  ZIP  CCR
UFGS 11 41 11 Refrigerated and Frozen Food Storage Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 11 42 00 Food Preparation Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers   08-01-2017  PDF |  ZIP  CCR
UFGS 32 92 19 Seeding   08-01-2017  PDF |  ZIP  CCR
UFGS 11 44 00 Food Cooking Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers   08-01-2017  PDF |  ZIP  CCR
UFGS 33 51 39 Monitoring Wells   08-01-2017  PDF |  ZIP  CCR
UFGS 10 22 19 Demountable and Moveable Partitions   08-01-2017  PDF |  ZIP  CCR
UFGS 42 23 13.00 40 Process Condensers   08-01-2017  PDF |  ZIP  CCR
UFGS 32 92 26 Sprigging   08-01-2017  PDF |  ZIP  CCR
UFGS 11 47 00 Ice Machines   08-01-2017  PDF |  ZIP  CCR
UFGS 32 93 00 Exterior Plants   08-01-2017  PDF |  ZIP  CCR
UFGS 11 48 00 Cleaning and Disposal Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 32 96 00 Transplanting Exterior Plants   08-01-2017  PDF |  ZIP  CCR
UFGS 12 50 00.13 10 Furniture and Furniture Installation   08-01-2017  PDF |  ZIP  CCR
UFGS 09 24 23 Cement Stucco   08-01-2017  PDF |  ZIP  CCR
UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels   08-01-2017  PDF |  ZIP  CCR
UFGS 11 68 13 Playground Equipment   08-01-2017  PDF |  ZIP  CCR
UFGS 12 21 00 Window Blinds   08-01-2017  PDF |  ZIP  CCR
UFGS 32 05 33 Landscape Establishment   08-01-2017  PDF |  ZIP  CCR
UFGS 09 72 00 Wallcoverings   08-01-2017  PDF |  ZIP  CCR
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems   08-01-2017  PDF |  ZIP  CCR
UFGS 12 35 39 Commercial Kitchen Casework   08-01-2017  PDF |  ZIP  CCR
UFGS 12 93 00 Site Furnishings   08-01-2017  PDF |  ZIP  CCR
UFGS 09 62 38 Static-Control Flooring   08-01-2017  PDF |  ZIP  CCR
UFGS 23 22 25.00 40 Steam Valves   11-01-2017  PDF |  ZIP  CCR
UFGS 09 68 00 Carpeting   11-01-2017  PDF |  ZIP  CCR
UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless   11-01-2017  PDF |  ZIP  CCR
UFGS 04 03 00 Conservation Treatment for Period Masonry   11-01-2017  PDF |  ZIP  CCR
UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure   11-01-2017  PDF |  ZIP  CCR
UFGS 26 23 00.00 40 Switchboards and Switchgear   11-01-2017  PDF |  ZIP  CCR
UFGS 03 01 00 Rehabilitation of Concrete   02-01-2018  PDF |  ZIP  CCR
UFGS 23 84 19.00 Desiccant Cooling Systems   02-01-2018  PDF |  ZIP  CCR
UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells   02-01-2018  PDF |  ZIP  CCR
UFGS 32 13 13.43 High Temperature Concrete Paving for Airfields Using Lightweight and Traprock Aggregates   02-01-2018  PDF |  ZIP  CCR
UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements   02-01-2018  PDF |  ZIP  CCR
UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems   02-01-2018  PDF |  ZIP  CCR
UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems   02-01-2018  PDF |  ZIP  CCR
UFGS 03 37 13 Shotcrete   02-01-2018  PDF |  ZIP  CCR
UFGS 35 59 13.14 20 Polymeric Piles   02-01-2018  PDF |  ZIP  CCR
UFGS 33 11 00 Water Utility Distribution Piping   02-01-2018  PDF |  ZIP  CCR
UFGS 33 30 00 Sanitary Sewerage   05-01-2018  PDF |  ZIP  CCR
UFGS 33 46 16 Subdrainage Piping   05-01-2018  PDF |  ZIP  CCR
UFGS 23 05 48.19 [Seismic] Bracing for HVAC   05-01-2018  PDF |  ZIP  CCR
UFGS 23 81 00 Decentralized Unitary HVAC Equipment   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 13.62 Asphalt Surface Treatment   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 16.70 Cold-Mix Reused Asphalt Paving   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 16.74 In Place Hot Reused Asphalt Paving   05-01-2018  PDF |  ZIP  CCR
UFGS 32 16 19 Concrete Curbs, Gutters and Sidewalks   05-01-2018  PDF |  ZIP  CCR
UFGS 46 53 22 Trickling Filter   05-01-2018  PDF |  ZIP  CCR
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)   05-01-2018  PDF |  ZIP  CCR
UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil   05-01-2018  PDF |  ZIP  CCR
UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 05 50 14 Structural Metal Fabrications   08-01-2018  PDF |  ZIP  CCR
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers   08-01-2018  PDF |  ZIP  CCR
UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish   08-01-2018  PDF |  ZIP  CCR
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures   08-01-2018  PDF |  ZIP  CCR
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters   08-01-2018  PDF |  ZIP  CCR
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules   08-01-2018  PDF |  ZIP  CCR
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method   08-01-2018  PDF |  ZIP  CCR
UFGS 05 50 15 Civil Works Fabrications   08-01-2018  PDF |  ZIP  CCR
UFGS 01 33 00 Submittal Procedures   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment   08-01-2018  PDF |  ZIP  CCR
UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.12 Aviation Fuel Pantographs   08-01-2018  PDF |  ZIP  CCR
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.13 Aviation Fuel Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up   08-01-2018  PDF |  ZIP  CCR
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V])   08-01-2018  PDF |  ZIP  CCR
UFGS 05 05 23.16 Structural Welding   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.14 Aviation Fuel Control Valves   08-01-2018  PDF |  ZIP  CCR
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks)   08-01-2018  PDF |  ZIP  CCR
UFGS 05 12 00 Structural Steel   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.23 Aviation Fuel Pumps   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System   08-01-2018  PDF |  ZIP  CCR
UFGS 02 62 13.00 10 Air and Steam Stripping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 31 11 00 Clearing and Grubbing   11-01-2018  PDF |  ZIP  CCR
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 31 21 13 Radon Mitigation   11-01-2018  PDF |  ZIP  CCR
UFGS 02 82 00 Asbestos Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 02 83 00 Lead Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 10 Fuel Systems Piping (Service Station)   11-01-2018  PDF |  ZIP  CCR
UFGS 02 85 00 Mold Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 11 11 37 Electric Vehicle Supply Equipment   11-01-2018  PDF |  ZIP  CCR
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials   11-01-2018  PDF |  ZIP  CCR
UFGS 35 41 00 Levee Construction   11-01-2018  PDF |  ZIP  CCR