UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort descending Action Change # Nature of Change or Revision
Nov-2018 N UFGS 06 20 00 Finish Carpentry C 2 Added notes to not use particleboard or hardboard siding in humid or ESC C4 and C5 locations.
Aug-2015 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Nontechnical Title Revision (was Laminate Clad Architectural Casework). Did not change Section date.
Aug-2010 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Added GEI or SCS certification
Aug-2009 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Compliance with CSI SectionFormat
Nov-2018 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets C 1 Updated reference in response to CCR 6899.
Nov-2015 A UFGS 06 61 16 Solid Surfacing Fabrications R Nontechnical Title Revision (was Solid Polymer (Solid Surfacing) Fabrications). Did not change Section date.
Aug-2010 A UFGS 06 61 16 Solid Surfacing Fabrications R Added GEI or SCS certification
Aug-2009 A UFGS 06 61 16 Solid Surfacing Fabrications R Compliance with CSI SectionFormat
Aug-2018 A UFGS 06 61 16 Solid Surfacing Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2020 A UFGS 06 61 16 Solid Surfacing Fabrications R Complete review and update including sustainability requirements.
Feb-2015 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Tri Annual Database Maintenance (TADM) completed.
Aug-2010 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Closes CCR #3524; other minor revisions throughout
May-2009 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders N New section
May-2018 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Tri-Annual Database Maintenance (TADM) completed
May-2012 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Conform to CSI Section Format, Submittal Article Compliance, modified Subparts 1.3, 1.3.1, 2.1, 2.1.1, 2.1.2, 2.1.2.1, 2.1.2.3, 2.3,\ and 3.6. Deleted Subpart 1.3.2 and 1.3.3
Feb-2011 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R CCR # 498 - comments were incorporated; minor revision in subpart 2.4
Aug-2023 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Complete life cycle review. Update technical requirements, references, formatting.
Nov-2023 N UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Feb-2015 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Tri Annual Database Maintenance (TADM) completed.
Feb-2010 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating N New section
May-2018 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Tri-Annual Database Maintenance (TADM) completed
Feb-2012 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Tri-Annual Database Maintenance - minor revisions Subpart 1.5
Aug-2023 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 10243
Nov-2023 N UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Feb-2015 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Tri Annual Database Maintenance (TADM) completed.
May-2009 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings N New section
Dec-2009 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R INTERIM RELEASE: Updated Criteria
May-2018 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Tri-Annual Database Maintenance (TADM) completed
May-2012 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Minor Revisions
Feb-2012 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Tri-Annual Database Maintenance - Subpart 1.4 Submittal Article Compliance
Aug-2023 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Complete life cycle review. Update technical requirements, references, formatting.
Nov-2023 N UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness C 1 Updated testing requirements in paragraphs 3.4, 3.5 and 3.6.
May-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
Aug-2019 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness R Complete review and update.
May-2023 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness D Superseded by UFGS 01 91 19 BUILDING ENCLOSURE COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning D Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning N Superseding UFGS 07 27 00.45 10 Building Air Barrier System
May-2017 N UFGS 07 11 13 Bituminous Dampproofing C 1 In response to CCR 1816, updated para 1.3-Delivery and Storage
Aug-2011 N UFGS 07 11 13 Bituminous Dampproofing R Modified references in subpart 2.6.1
Aug-2023 N UFGS 07 11 13 Bituminous Dampproofing R Complete review and update including the incorporation of CCRs.
Feb-2016 N UFGS 07 12 00 Built-Up Bituminous Waterproofing R Complete revision; revised throughout to incorporate CCR 3686 ; update format and editorial changes.
Aug-2017 N UFGS 07 13 53 Elastomeric Sheet Waterproofing C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Feb-2016 N UFGS 07 13 53 Elastomeric Sheet Waterproofing R Complete revision; revised throughout to incorporate CCRs 3687, 3463; update format and editorial changes.
Aug-2017 N UFGS 07 14 00 Fluid-Applied Waterproofing C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Feb-2018 N UFGS 07 14 00 Fluid-Applied Waterproofing C 2 In response to CCR 5945
Feb-2012 N UFGS 07 14 00 Fluid-Applied Waterproofing R Modified subparts 1.2, 3.6 and Form 1; added 3.5
Aug-2023 N UFGS 07 14 00 Fluid-Applied Waterproofing R Complete review and update including the incorporation of CCRs.
Jan-2007 N UFGS 07 16 19 Metallic Oxide Waterproofing R No Nature of Change statement provided.
Aug-2023 N UFGS 07 16 19 Metallic Oxide Waterproofing R Complete review and update including the incorporation of CCRs.
Feb-2016 N UFGS 07 17 00 Bentonite Waterproofing R Complete revision; revised throughout to incorporate CCRs 2803, 1484,and 2424; update format and editorial changes.
Aug-2017 N UFGS 07 19 00 Water Repellents C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
May-2011 N UFGS 07 19 00 Water Repellents R Reference update: modified subpart 2.3.1 through 2.3.4
Aug-2023 N UFGS 07 19 00 Water Repellents R Complete review and update including the incorporation of CCRs.
May-2011 N UFGS 07 21 13 Board and Block Insulation R Reference update: modified subpart 2.1.2
Feb-2016 N UFGS 07 21 13 Board and Block Insulation R Complete revision; revised throughout to incorporate CCRs 2820, 3234; update format and editorial changes.
Feb-2010 N UFGS 07 21 13 Board and Block Insulation R Section References (SRF) update; removed reference to ASTM D828
Aug-2010 N UFGS 07 21 13 Board and Block Insulation R Added GEI or SCS certification
May-2013 N UFGS 07 21 13 Board and Block Insulation C 1 modified subpart 1.3
Aug-2018 N UFGS 07 21 13 Board and Block Insulation C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2020 N UFGS 07 21 13 Board and Block Insulation C 2 In response to CCR 8689, updated phrasing used in SPECIAL WARRANTIES (1.8) for the start of the warranty period to include "or Substantial Completion".
Aug-2023 N UFGS 07 21 13 Board and Block Insulation R Complete review and update
May-2011 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Reference update: modified subpart 2.1
Feb-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 3 In response to CCR 2219 reference for recycled materials added.
Feb-2010 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Section References (SRF) update; removed reference to ASTM D828
Aug-2010 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Added GEI or SCS certification
May-2013 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 1 Modified subpart 1.3
Aug-2015 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Nov-2011 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Modified subpart 2.2
Aug-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2023 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Complete review and update including the incorporation of CCRs.
May-2011 N UFGS 07 21 23 Loose Fill Thermal Insulation R Reference update: modified subpart 2.1
Feb-2010 N UFGS 07 21 23 Loose Fill Thermal Insulation R Section References (SRF) update; removed reference to ASTM D828
Aug-2010 N UFGS 07 21 23 Loose Fill Thermal Insulation R Added GEI or SCS certification
Feb-2014 N UFGS 07 21 23 Loose Fill Thermal Insulation C 2 Modified subpart 2.1.1
May-2013 N UFGS 07 21 23 Loose Fill Thermal Insulation C 1 Modified subpart 1.3
Aug-2015 N UFGS 07 21 23 Loose Fill Thermal Insulation C 3 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2018 N UFGS 07 21 23 Loose Fill Thermal Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2023 N UFGS 07 21 23 Loose Fill Thermal Insulation R Complete review and update
Feb-2017 N UFGS 07 22 00 Roof and Deck Insulation C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
May-2011 N UFGS 07 22 00 Roof and Deck Insulation R Reference updates: Modified General Note, subparts 1.2 (note) and 2.1.1
Feb-2016 N UFGS 07 22 00 Roof and Deck Insulation R Complete revision; revised throughout to incorporate CCRs 4254, 2807; update format and editorial changes.
Aug-2010 N UFGS 07 22 00 Roof and Deck Insulation R Added GEI or SCS certification
May-2013 N UFGS 07 22 00 Roof and Deck Insulation C 1 Modified subpart 1.4.3
Nov-2008 N UFGS 07 22 00 Roof and Deck Insulation R Reference changed from FM AS 4470 to FM 4470
Aug-2011 N UFGS 07 22 00 Roof and Deck Insulation R Modified subparts 1.2, 2.1.1, 2.1.3, 3.1.1; Added subparts 1.4.4 , 1.4.5 and 2.2.2
Aug-2018 N UFGS 07 22 00 Roof and Deck Insulation C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Jan-2007 N UFGS 07 22 00 Roof and Deck Insulation R Incorporated NASA requirements
Nov-2018 N UFGS 07 22 00 Roof and Deck Insulation C 3 Added notes to consider use of polystyrene as a roof insulation in humid or ESC C3-C5 locations and not to use wood fiberboard in humid or ESC C4-C5 locations.
Aug-2023 N UFGS 07 22 00 Roof and Deck Insulation R Complete review and update including the incorporation of CCRs.
Apr-2007 S UFGS 07 22 00.00 40 Roof and Deck Insulation D Superseded by UFGS 07 22 00 Roof and Deck Insulation (Preparing Activity: Navy) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2007 S UFGS 07 22 00.00 40 Roof and Deck Insulation R Section References (SRF) update
Oct-2006 S UFGS 07 22 00.00 40 Roof and Deck Insulation R Thoroughly revised many issues
Jun-2006 S UFGS 07 22 00.00 40 Roof and Deck Insulation R Section References (SRF) updated
Aug-2017 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 2 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
May-2011 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Reference update: modified subpart 1.4
Feb-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 3 In response to CCRs 2225, 2226, 2227, and 2228
Aug-2008 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Added Insulation Drainage Board Channels
Aug-2015 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Pages