UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort ascending UFGS Section Action Change # Nature of Change or Revision
May-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
May-2020 A UFGS 11 71 00 Sterilizers and Associated Equipment R Complete review and update including section title change from WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT to STERILIZERS AND ASSOCIATED EQUIPMENT.
May-2020 A UFGS 11 82 20 Incinerators, General Purpose D Superseded by UFGS 11 82 19 PACKAGED INCINERATORS without revision to comply with MF 2011 in response to CCR 1999. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment N Superseding UFGS 13 48 00 [SEISMIC ]BRACING FOR MISCELLANEOUS EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Nontechnical number and title change.
May-2020 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment D Superseded by UFGS 13 48 73 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 23 11 20 Facility Gas Piping N Superseding UFGS 23 11 25 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Nontechnical number change. Updated reference in paragraphs 2.8 and 2.9 in response to CCR 6024.
May-2020 A UFGS 23 11 25 Facility Gas Piping D Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 30 00 HVAC Air Distribution N Superseding UFGS 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS without revision to comply with MF 2011 in response to CCR 2023. Nontechnical number and title change. Updated test requirements in paragraphs 1.4.5 and 3.13 in response to CCR 7212. Updated paragraph 2.10.5.2.4 in response to CCR 8015.
May-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems D Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems N Superseding UFGS 23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE[ AND WELDING FUME] EXHAUST REMOVAL SYSTEM(S) without revision to comply with MF 2011 in response to CCR 2029. Nontechnical number and title change.
May-2020 A UFGS 23 35 00.00 10 Overhead Vehicle Tailpipe [and Welding Fume] Exhaust Removal System(s) D Superseded by UFGS 23 35 16.17 10 MECHANICAL ENGINE [AND WELDING FUME] EXHAUST SYSTEMS without revision to comply with MF 2011 in response to CCR 2029. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 52 30.00 10 Heat Recovery Boilers N Superseding UFGS 23 52 43.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031. Nontechnical number change.
May-2020 A UFGS 23 52 43.00 10 Heat Recovery Boilers D Superseded by UFGS 23 52 30.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System N Superseding UFGS 23 70 01.00 10 CENTRAL STEAM-GENERATING SYSTEM, COAL-FIRED without revision to comply with MF 2011 in response to CCR 2034. Nontechnical number and title change.
May-2020 A UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired D Superseded by UFGS 23 52 30.01 10 CENTRAL COAL-FIRED STEAM-GENERATING SYSTEM without revision to comply with MF 2011 in response to CCR 2034. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired N Superseding UFGS 23 70 02.00 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED without revision to comply with MF 2011 in response to CCR 2035. Nontechnical number change.
May-2020 A UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired D Superseded by UFGS 23 52 30.02 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED without revision to comply with MF 2011 in response to CCR 2035. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems N Superseding UFGS 23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM without revision to comply with MF 2011 in response to CCR 2036. Nontechnical number and title change.
May-2020 A UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam D Superseded by UFGS 23 58 00.00 10 CENTRAL STEAM HEATING AND UTILITIES SYSTEMS without revision to comply with MF 2011 in response to CCR 2036. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 80 20.00 10 Gas-Fired Heating Equipment N Superseding UFGS 23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS without revision to comply with MF 2011 in response to CCR 2032. Nontechnical number and title change.
May-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters D Superseded by UFGS 23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT without revision to comply with MF 2011 in response to CCR 2032. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 32 15.00 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries N New Unified UFGS superseding UFGS-26 32 13.00 20 Single Operation Generator Sets, UFGS-26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 kW, Standby Applications, and UFGS-26 32 15.00 10 Diesel-Generator Set, Stationary 100-250 kW, with Auxiliaries
May-2020 A UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch N Superseding UFGS 26 36 00.00 10 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH and UFGS 26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES.
May-2020 A UFGS 26 36 00.00 10 Automatic Transfer Switch and By-Pass/Isolation Switch D Superseded by UFGS 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 27 05 14.00 10 Cable Television Premises Distribution System D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 27 41 16.00 10 Television Signal Reception System D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 27 51 16 Public Address Systems R Complete review and update including section title change from RADIO AND PUBLIC ADDRESS SYSTEMS to PUBLIC ADDRESS SYSTEMS.
May-2020 A UFGS 27 53 19.13 First Responder Distributed Antennae Systems (DAS) N New UFGS.
May-2020 A UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements D Superseded by/consolidated into UFGS 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 11 13.16 Bituminous-Stabilized Subgrade N Superseding UFGS 32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE.
May-2020 A UFGS 32 11 26.19 Bituminous-Stabilized Base and Subbase Courses N Superseding UFGS 32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE.
May-2020 A UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade D Superseded by UFGS 32 11 13.16 BITUMINOUS-STABILIZED SUBGRADE and UFGS 32 11 26.19 BITUMINOUS-STABILIZED BASE AND SUBBASE COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 11 33.13 Portland Cement-Stabilized Base Courses N Superseding UFGS 32 11 34 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE.
May-2020 A UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course D Superseded by UFGS 32 11 33.13 PORTLAND CEMENT-STABILIZED BASE COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 12 36.26 10 Polymer Concrete Micro-Overlay (PCMO) for Fuel and Abrasion Resistant Wearing Surfaces N Superseding UFGS 32 12 22.00 10 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES.
May-2020 A UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces D Superseded by UFGS 32 12 36.26 10 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 33 46 13 Foundation Drainage R Superseding UFGS 33 46 13 FOUNDATION DRAINAGE SYSTEM without revision to comply with MF 2011 in response to CCR 2146. Nontechnical title change.
May-2020 A UFGS 33 56 53 Compressed Gases Storage Tanks R Superseding UFGS 33 56 53 PRESSURE VESSELS FOR STORAGE OF COMPRESSED GASES without revision to comply with MF 2011 in response to CCR 2155. Nontechnical title change.
May-2020 A UFGS 40 60 00 Process Control N Superseding UFGS 40 95 00 PROCESS CONTROL without revision to comply with MF 2016 in response to CCR 5843. Nontechnical number change.
May-2020 A UFGS 40 95 00 Process Control D Superseded by UFGS 40 60 00 PROCESS CONTROL without revision to comply with MF 2016 in response to CCR 5843. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 41 24 26 Hydraulic Power Systems R Superseding UFGS 41 24 46 HYDRAULIC FLUID POWER SYSTEMS without revision to comply with MF 2011 in response to CCR 2184. Nontechnical title change.
May-2020 A UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps N Superseding UFGS 43 11 00 FANS/BLOWERS/PUMPS; OFF-GAS without revision to comply with MF 2011 in response to CCR 2189. Nontechnical number and title change.
May-2020 A UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas D Superseded by UFGS 43 11 00.10 OFF-GAS FANS, BLOWERS AND PUMPS without revision to comply with MF 2011 in response to CCR 2189. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units N Superseding UFGS 43 13 13.13 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS without revision to comply with MF 2011 in response to CCR 2190. Nontechnical number change.
May-2020 A UFGS 43 13 13.13 Vapor Phase Activated Carbon Adsorption Units D Superseded by UFGS 44 13 10.13 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS without revision to comply with MF 2011 in response to CCR 2190. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 44 13 51 Thermal Oxidation Equipment N Superseding UFGS 44 13 52 THERMAL (CATALYTIC) OXIDATION SYSTEMS without revision to comply with MF 2011 in response to CCR 2196. Nontechnical number and title change.
May-2020 A UFGS 44 13 52 Thermal (Catalytic) Oxidation Systems D Superseded by UFGS 44 13 51 THERMAL OXIDATION EQUIPMENT without revision to comply with MF 2011 in response to CCR 2196. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 06 61 16 Solid Surfacing Fabrications R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRS as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 09 51 00 Acoustical Ceilings R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 11 00 Visual Display Units R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 14 00.20 Interior Signage R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 21 13 Toilet Compartments R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 22 39 Folding Panel Partitions R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 26 00 Wall and Door Protection R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 28 13 Toilet Accessories R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 24 13 Roller Window Shades R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 61 13 Upholstered Audience Seating R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION and UFGS 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION.
Aug-2020 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 16 Dry Pipe Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 16.00 20 DRY-PIPE FIRE SPRINKLER SYSTEMS and UFGS 21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION.
Aug-2020 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 18 Preaction Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION.
Aug-2020 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection D Superseded by UFGS 21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 19 Deluge Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 19.00 20 [DELUGE] [PREACTION] FIRE SPRINKLER SYSTEMS.
Aug-2020 A UFGS 22 33 30.00 10 Solar Water Heating Equipment R Complete review and update.
Aug-2020 A UFGS 28 31 60 Interior Fire Alarm System, Non-Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 A UFGS 28 31 66 Interior Fire Alarm And Mass Notification System, Non-Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 A UFGS 28 31 70 Interior Fire Alarm System, Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 A UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable R Completely new section replacing/consolidating (previous) UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP, UFGS 28 31 49 CARBON MONOXIDE DETECTORS, UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM, and UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE.
Aug-2020 A UFGS 28 31 00.00 10 Fire Detection and Alarm System, Direct Current Loop D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and revised UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 64.00 10 Fire Detection and Alarm System, Addressable D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Complete review and update.
Aug-2020 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Aug-2020 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly R Complete review and update.
Aug-2020 A UFGS 35 20 23 Dredging R Complete review and update. PA changed from NAVFAC to USACE.
Aug-2020 A UFGS 35 42 34 Reinforced Soil Slope R Complete review and update.
Aug-2020 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Aug-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
Aug-2020 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Updated last paragraph of designer's note and specification text in subpart 1.5 in response to CCR 9043. Added notes for NAVFAC PAC requirements in subparts 1.5 and 1.7, and updated text in first paragraph of subpart 1.7 in response to CCR 8834. Deleted tailoring options in subparts 1.3 and 1.4.3 in response to CCR 8911. Added tailoring options to submittal SD-06 in response to CCR 8912. Updated designer's note referring to Third Party Certification in subpart 1.7 in response to CCR 8913. Added tailoring options in subparts 1.6 and 1.7, and deleted first designer's note in subpart 1.7 in response to CCR 8914.
Aug-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 2 Updated commissioning certification in paragraph 1.8.1 in response to CCR 8404.
Aug-2020 A UFGS 03 70 00 Mass Concrete C 2 Updated paragraph 3.7.2.6.5 in response to CCR 1786.
Aug-2020 A UFGS 09 68 00 Carpeting C 2 Deleted second paragraph of subpart 2.1.1 in response to CCR 8744.
Aug-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment C 1 Updated/added UFC reference in second paragraph of subpart 3.6 note and updated last sentence of first text paragraph in response to CCR 8586.
Aug-2020 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 2 Added reference to UFC 3-301-02 to various subparts in response to CCR 8761.
Aug-2020 A UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures C 1 Deleted third paragraph of subpart 1.8.3 in response to CCR 7032.
Nov-2020 A UFGS 01 22 00.00 10 Price and Payment Procedures D Superseded by new unified section UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Nov-2020 A UFGS 13 49 10 X-Ray Shielding R Complete review and update.
Nov-2020 A UFGS 13 49 21 Radio Frequency (RF) Shielding: Magnetic Resonance Imaging (MRI) N New UFGS.
Nov-2020 A UFGS 27 52 24 Nurse Call System R Complete review and update.
Nov-2020 A UFGS 31 41 16 Metal Sheet Piling R Complete review and update.
Nov-2020 A UFGS 31 62 21 Piling: Composite, Wood and Cast In-Place Concrete D Superseded by UFGS 31 62 23 PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 31 62 23 Piling: Composite, Wood And Cast In-Place Concrete N Superseding UFGS 31 62 21 PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE.
Nov-2020 A UFGS 31 63 16 Augered Cast-In-Place Piles R Complete review and update including section title change from AUGER CAST GROUT PILES to AUGERED CAST-IN-PLACE PILES.