UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Nov-2023 N UFGS 05 51 00 Metal Stairs C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 52 00 Metal Railings C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 72 00 Decorative Metal Specialties C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 In response to CCR 13686, added "eOMSI" to the Definitions paragraph (1.1)
Nov-2023 N UFGS 01 91 00.15 Building Commissioning C 2 In response to CCR 13595, moved language related to warranty period requirements from PROJECT SCHEDULE paragraph (1.8) to CONSTRUCTION PHASE COMMISSIONING PLANS paragraph (3.7); added language for Air Force usage.
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 13850, edited Specifier Notes in Silica Fume paragraph (2.3.1.5) to clarify the use of silica fume; 13683, added requirement for ACI 301 in Concrete Mix Design paragraph (1.6.1.2)
Nov-2023 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 2 Updated information in Related Materials: Three-Phase Pad-Mounted Transformer Details
Nov-2023 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 1 Updated information in Related Materials: Single-Phase Pad-Mounted Transformer Details; in response to CCRs 11442 and 14105, "ABB" has been updated to "ABB/Hitachi Energy in Reduced Submittal Requirements paragraph (1.4.2)
Nov-2023 N UFGS 31 31 16.13 Chemical Termite Control C 1 In response to CCR 13819, revised the Termiticides paragraph (2.2.1), as well as several minor edits
Nov-2023 N UFGS 33 11 00 Water Utility Distribution Piping C 2 In response to the following CCRs: 13045, updated paragraph reference in first Specifier Note of MATERIALS paragraph (2.1); and 13586, added paragraph Knife Gate Valves (2.1.2.3) and reference AWWA C520
Nov-2023 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment C 2 In response to CCR 13074, updated to imperative mood; removed "shall" from the Section text.
Nov-2023 A UFGS 06 18 00 Glued-Laminated Construction C Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 A UFGS 12 48 13 Entrance Floor Mats and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 A UFGS 03 37 29 Concrete for Concrete Cutoff Walls C 1 Incorporated CCR #12904.
Nov-2023 A UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving C 1 Incorporated CCR #13888.
Nov-2023 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C 1 Incorporated various CCRs.
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Updated language in Loss of Privilege (1.2.3) and RFIs Module (1.6.3) paragraphs
Feb-2024 N UFGS 03 30 00 Cast-In-Place Concrete C 7 In response to the following CCRs: 14190, "LEED NC" removed from the References and submittal items with "LEED NC" reference replaced with an "S" submittal tag; 14340 and 14341, updated list items under Blended Cements paragraph (2.3.1.2)
Feb-2024 N UFGS 23 05 15 Common Piping for HVAC C 1 Added NAVFAC only specifier note under PIPE AND FITTINGS paragraph (2.2)
Feb-2024 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 7 In response to CCRs 9060, 13651, and 14220, ‘Pump Discharge Valve’ (submittal and paragraph) has been removed from the section as it conflicted with UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems’.
Feb-2024 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles C 3 In response to CCR 12354, replaced "shall" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 2 In response to the following CCRs: 9547, brackets have been added around "Chloride Ion Concentration" paragraph (2.5.7) and "Chloride Ion Penetration" paragraph (2.5.8); 13020, updated referenced paragraph titles; and 13503, added new "Patching" subparagraph (3.2.10) under PILE DRIVING Article (3.2)
Feb-2024 N UFGS 31 62 13.26 Pressure-Injected Footings C 2 In response to CCR 13524, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.13 Steel Pipe Piles C 2 In response to the following CCRs:13021, updated referenced paragraph titles and 13714, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.16 Steel H-Piles C 2 In response to CCR 13022, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 19 Timber Piles C 2 In response to the following CCRs: 12473 and 13023, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 50 Densified Aggregate Piers C 2 In response to CCR 13026, updated referenced paragraph titles.
Feb-2024 N UFGS 31 63 26.60 [Grouted] Helical Piles C 2 In response to the following CCRs:13028, updated referenced paragraph titles; and 13715, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 33 01 30.16 TV Inspection of Sewer Lines C 1 In response to CCR 11690, section was updated to include side wall scanning (panoramic) cameras.
Feb-2024 N UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment C 1 In response to CCR 13725, updated to reduce the use of shall and change passive voice to active voice.