UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices N Major revision of and superseding UFGS 35 01 43 Wire Rope for Gate Operating Devices
May-2014 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures N Major revision of and superseding UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures
May-2014 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly N New UFGS section
May-2014 S UFGS 40 17 30.00 40 Welding General Piping C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2014 A UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2014 A UFGS 48 06 15 Turbine Oil N Full review, updates and superseding UFGS 48 13 19.00 10 Turbine Oil
May-2014 A UFGS 48 13 19.00 10 Turbine Oil D Superseded by UFGS 48 06 15 Turbine Oil. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 00 22 13 Supplementary Instructions to Bidders D Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors N New; Superseding UFGS 00 22 13 Supplementary Instructions to Bidders
Feb-2014 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 1 Deleted subpart 1.3.1.3 "Waiver for Workers' Compensation"
Feb-2014 A UFGS 01 42 15 Metric Measurements N New; Revision of UFGS 00 31 10 Metric Measurements which was deleted August 2013. Section is being reinstated and has been renumbered.
Feb-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 Modified note before Part 1, Part 1, subparts 1.3, 1.4.1, 1.4.1.2,1.4.1.2.2, 1.4.1.3, 1.4.1.4, 1.4.1.5, 1.4.1.6.1, 1.4.1.6.6, 1.4.1.7, 1.6.5.2.1 and 1.6.5.2.2
Feb-2014 N UFGS 07 21 23 Loose Fill Thermal Insulation C 2 Modified subpart 2.1.1
Feb-2014 N UFGS 08 11 13 Steel Doors and Frames C 1 Modified subpart 2.3
Feb-2014 A UFGS 09 68 00 Carpeting C 1 Allowed for use of triexta (PTT)
Feb-2014 S UFGS 12 48 13 Entrance Floor Mats and Frames N Superseding UFGS 12 48 13.13 Entrance Floor Mats; title and section number changed; updated entire section through unification; Tri Annual Database Maintenance (TADM) completed including incorporating CCRs
Feb-2014 S UFGS 12 48 13.13 Entrance Floor Mats D Superseded by UFGS 12 48 13 Entrance Floor Mats and Frames Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 S UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures R Tri Annual Database Maintenance (TADM) completed
Feb-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)
Feb-2014 S UFGS 23 05 15 Common Piping for HVAC R Tri Annual Database Maintenance (TADM) completed
Feb-2014 A UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems C 1 QC Checklist in APPENDIX A made available in electronic format for use with this section at: http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf
Feb-2014 S UFGS 23 22 13.35 40 Steam Traps R Tri Annual Database Maintenance (TADM) completed
Feb-2014 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Tri Annual Database Maintenance (TADM) completed
Feb-2014 N UFGS 26 20 00 Interior Distribution System R Major revision
Feb-2014 A UFGS 26 55 53.00 10 Exterior Lighting Including Security and CCTV Applications D Superseded by UFGS 26 56 00 through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Tri Annual Database Maintenance (TADM) completed
Feb-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 3 Modified subparts 2.2.1.3, 3.1.3.2, 3.2.2, 3.2.3; added 3.2.2.1 and 3.2.2.2
Feb-2014 A UFGS 33 70 02.00 10 Electrical Distribution System, Underground D Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 33 71 02 Underground Electrical Distribution N New; Superseding UFGS 33 71 02.00 20 Underground Electrical Distribution and UFGS 33 70 02.00 10 Electrical Distribution System, Underground
Feb-2014 N UFGS 33 71 02.00 20 Underground Electrical Distribution D Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 S UFGS 01 33 00 Submittal Procedures C 3 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2
Nov-2013 S UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Revised note before part 1.
Nov-2013 A UFGS 02 65 00 Underground Storage Tank Removal C 1 Removed references to EM 200-1-3
Nov-2013 S UFGS 06 18 00 Glued-Laminated Construction R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 A UFGS 09 06 90 Schedules for Painting and Coating C 1 Reformatting
Nov-2013 A UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile D Superseded by UFGS 09 30 13 Ceramic Tiling. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 09 30 13 Ceramic Tiling N Superseding UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile
Nov-2013 A UFGS 09 68 00 Carpeting R Revised section title to comply with MasterFormat. Routine section maintenance.
Nov-2013 S UFGS 12 32 00 Manufactured Wood Casework R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 1 Revised subparts 2.2.1, 2.2.2, 2.3, 2.4, 2.4.1, 2.4.2, 2.5.1, 2.5.3, 2.8 and 3.2.4
Nov-2013 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers C 1 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS within the General Note
Nov-2013 N UFGS 26 12 19.20 Single-Phase Pad-Mounted Transformers D Retired; Superseded by UFGS 26 12 21 Single-Phase Pad-Mounted Transformers. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers N Superseding UFGS 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
Nov-2013 N UFGS 26 41 00 Lightning Protection System N Superseding UFGS 26 41 00.00 20 Lightning Protection System and UFGS 26 41 01.00 10 Lightning Protection System
Nov-2013 N UFGS 26 41 00.00 20 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 15 19.00 10 Wire Line Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 21 10.00 10 Fiber Optic Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 31 23 00.00 20 Excavation and Fill C 1 Revised subpart 1.6 and table in subpart 2.10
Nov-2013 N UFGS 31 62 19 Timber Piles C 1 Revised subpart 2.1.4
Nov-2013 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement C 1 Revised notes before Part 1 and subparts 2.1.1 and 3.1.2.1. Deleted subparts 1.6.2.1 Hot-Poured Liquid Sealant and 2.1.1.2 Sealant, Joint, Jet-
Nov-2013 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement C 1 Revised subparts 2.5 and 3.3.2.1
Nov-2013 N UFGS 32 12 17 Hot Mix Bituminous Pavement C 1 Revised subparts 1.6.1, 2.2, 2.5.1, 2.5.2, 3.3, 3.5.2.2 and 3.5.2.3
Nov-2013 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities C 1 Added subparts 1.2, 2.1.1.2, 2.1.1.4 and 2.1.2; Revised subparts 1.4, 1.6.2, 2.1.1, 2.1.3, 2.1.3.1, 2.3, 3.3.7, 3.7.5.1, 3.7.5.2 and 3.7.7
Nov-2013 N UFGS 32 13 43 Pervious Concrete Paving C 1 Revised subparts 1.3, 1.5.1 and 3.3.4
Nov-2013 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2013 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type C 1 Revised subpart 2.5.3 and 2.6.2.2
Nov-2013 N UFGS 33 52 90.00 20 Welding for POL Service Piping C 1 Revised subpart 3.3
Nov-2013 A UFGS 33 82 33.00 10 Coaxial Cable Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators C 1 Revised subpart 3.2
Aug-2013 A UFGS 00 31 10 Metric Measurements D Section removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2013 N UFGS 01 33 29.00 20 Sustainable Requirements N NEW; Interim change to 01 33 29, LEED DOCUMENTATION, to include the Guiding Principles, for Navy-use only.
Aug-2013 N UFGS 01 35 26 Governmental Safety Requirements C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
Aug-2013 N UFGS 06 13 33 Pier Timberwork C 1 Modified subpart 2.1.1.2
Aug-2013 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 1 Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg
Aug-2013 A UFGS 07 84 00 Firestopping C 1 Industry input
Aug-2013 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 Modified notes before Part 1 and in subpart 3.6
Aug-2013 S UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 A UFGS 21 30 00 Fire Pumps C 1 CCR 1147, fuel piping specified by NFPA 20
Aug-2013 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 09 23.00 40 Lighting Control Devices R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear N NEW
Aug-2013 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 26 24 16.00 40 Panelboards R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 26 27 29 Marina Electrical Work C 1 Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note)
Aug-2013 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Modified subparts 1.5 and 3.5 (notes)
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2013 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 2 Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3
Aug-2013 N UFGS 46 23 00 Grit Removal and Handling Equipment C 1 Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6
May-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials R Revised Section Title from RECYCLED / RECOVERED MATERIALS. Also, added Biopreferred Fed
May-2013 N UFGS 03 45 00 Precast Architectural Concrete C 1 Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9