UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2014 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements C 1 Revised par. 2.2.2.5 as noted in CCR 3847. Revised note in par. 2.4 as noted in CCR 2731.
Nov-2014 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements C 1 Revised references as noted in CCR 3293.
Nov-2014 A UFGS 32 16 13 Concrete Sidewalks and Curbs and Gutters C 1 Added requirements for detectable warning systems as noted in CCR 1754.
Nov-2014 A UFGS 32 16 15 Concrete Block Pavements C 1 Revised references and par. 2.2.1.1 as noted in CCR 3785.
Nov-2014 N UFGS 32 17 23.00 20 Pavement Markings C 2 Qualifications submission moved from SD-03 to SD-07, Add Subparts 1.8 QUALIFICATIONS FOR AIRFILED MARKING and 1.8.1, Airfield Marking Pavement Qualifications
Nov-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 4 Updated Note under Subpart 2.1 Allowable Piping Materials, paragraph 4.
Nov-2014 A UFGS 33 30 00 Sanitary Sewerage C 3 Deleted reference to CID A-A-60005 and revised par. 2.3.4.1 per CCR 2394.
Nov-2014 S UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 A UFGS 33 40 00 Stormwater Utilities C 4 Replaced ASTM C 924/C924M with ASTM C969/C969M per CCR 3584.
Nov-2014 A UFGS 33 46 16 Subdrainage Piping C 1 Deleted reference to UFC and updated FAA reference per CCR 2805.
Nov-2014 N UFGS 33 47 13 Pond and Reservoir Liners R Added and updated references in Subpart 1.1 References, added section on warranties (1.5.1), Revised text and deleted table in in Section 2.1.3, revised text in sections 3.7.1 and 3.7.2
Nov-2014 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 N UFGS 33 71 02 Underground Electrical Distribution C 1 Changed Section Reference 31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL to Section Reference 31 31 16.13 CHEMICAL TERMITE CONTROL
Nov-2014 S UFGS 33 73 00.00 40 Utility Transformers R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 S UFGS 33 75 00.00 40 Switchgear and Protection Devices R Tri-Annual Database Maintenance (TADM) completed.
Nov-2014 N UFGS 33 81 27 Pier Telephone Distribution Systems D Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 A UFGS 34 73 13 Aircraft Tiedowns C 1 Revised paragraphs as noted in CCR 1569.
Nov-2014 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Revised section to include requirements for locks and dams.
Nov-2014 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures C 1 SRF update, changed 00 41 00 BID SCHEDULES to 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.
Nov-2014 N UFGS 40 95 33.23 20 Fiber Optic (FO) Outside Plant (OSP) Media D Previously incorporated into UFGS 33 82 00 Telecommunications Outside Plant (OSP). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2014 A UFGS 43 31 14 Trickling Filter C 1 Deleted reference and revised par. 2.4.1 and 2.4.2 as noted in CCR 768.
Aug-2014 N UFGS 00 01 15 List of Drawings C 1 Added editor's note to import list of drawings as Excel XML spreadsheet.
Aug-2014 N UFGS 00 41 00 Bid Schedules D Deleted, Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors through unification. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2014 N UFGS 01 14 00 Work Restrictions C 2 Fixed tailoring and bracket issue throughout. Revised Employment Restrictions for Bremerton, WA
Aug-2014 N UFGS 01 30 00 Administrative Requirements C 2 Deleted 35 mm slides as picture media
Aug-2014 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Moved execution requirements to Part 3 as noted in CCR 3562
Aug-2014 N UFGS 01 78 23 Operation and Maintenance Data C 2 Added editor's note to coordinate with UFGS 01 78 24.00 20 FACILITY eOMSI for Navy projects.
Aug-2014 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Added reference note to newly published ECB; changed validation to verification, and deleted manuals from verification process.
Aug-2014 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 1 Added FAA requirements as noted in CCR 857
Aug-2014 A UFGS 03 15 00.00 10 Concrete Accessories C 1 Made corrections as noted in CCR 3836
Aug-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing C 1 Corrected spelling as noted in CCR 3841; made corrections as noted in CCR 3842
Aug-2014 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 2 Fixed typo under "Substrate Preparation. Changed "Don not" to "Do not"
Aug-2014 N UFGS 09 22 00 Supports for Plaster and Gypsum Board C 1 In 2.1 UFC 3-310-04 needed a RID tag; fixed
Aug-2014 N UFGS 13 34 19 Metal Building Systems C 1 Fixed spacing in manufacturers data
Aug-2014 S UFGS 22 14 29.00 Sump Pumps R Tri Annual Database Maintenance (TADM) completed
Aug-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 3 Added Energy Star requirements
Aug-2014 A UFGS 23 52 00 Heating Boilers C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Aug-2014 S UFGS 23 82 43.00 40 Electric Duct Heaters R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 23 82 46.00 40 Electric Unit Heaters R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 26 52 00.00 40 Emergency Lighting R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Tri Annual Database Maintenance (TADM) completed
Aug-2014 N UFGS 31 31 16.19 Termite Control Barriers R Changes to 3.1, 3.1.1, 3.1.2, 3.2.2, and 3.4; Section Title was changed from TERMITE CONTROL BARRIER SYSTEM to MESH TERMITE CONTROL BARRIER SYSTEM
Aug-2014 N UFGS 31 31 16.20 Basaltic Termite Barrier C 1 Added SDs 6,8, and 11
Aug-2014 A UFGS 31 41 16 Metal Sheet Piling C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Aug-2014 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall C 1 Deleted paragraph as noted in CCR 3331
Aug-2014 N UFGS 32 93 00 Exterior Plants C 1 CCR 3597: ASTM D1527 has been withdrawn with not replacement and CCR 3602: ASTM D1972 has been withdrawn with no replacement
Aug-2014 A UFGS 33 30 00 Sanitary Sewerage C 2 Made corrections as noted in CCR 1672
Aug-2014 A UFGS 33 40 00 Stormwater Utilities C 3 Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333
Aug-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices C 1 Made minor editorial corrections
Aug-2014 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.4.1.1, and 1.4.2, this section was deleted from the UFGS Database
Aug-2014 S UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 42 23 13.00 40 Process Condensers R Tri Annual Database Maintenance (TADM) completed
Aug-2014 S UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels R Tri Annual Database Maintenance (TADM) completed
Aug-2014 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System C 1 Added paint requirements as noted in CCR 2518
Aug-2014 A UFGS 46 61 00 Filtration Equipment C 1 Added paint requirements as noted in CCR 2519
Aug-2014 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System C 1 Deleted publication as noted in CCR 776
Aug-2014 A UFGS 46 76 23.16 Recessed Chamber Filter Presses C 1 Added paint requirements as noted in CCR 2520
May-2014 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 1 Changed Physical Security Equipment (PSE) to Electronic Security Equipment (ESS) and modified FF&E and A/V CLIN.
May-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Modified subpart 3.1.1.1
May-2014 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Revised "eOMSI documents" to "eOMSI Manual", revised "eOMSI Facility data" to "eOMSI Facility Data Workbook" and revised throughout to coordinate requirements.
May-2014 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 11 19.00 Insulating Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 15 00.00 10 Concrete Accessories R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing R Major revision to comply with ICC IBC 2012
May-2014 N UFGS 03 30 00 Cast-In-Place Concrete R Major revision to comply with IBC 2012
May-2014 A UFGS 03 30 00.00 10 Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 35 00.00 10 Concrete Finishing R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 39 00.00 10 Concrete Curing R Major revision to comply with ICC IBC 2012
May-2014 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 S UFGS 03 47 13 Tilt-Up Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 A UFGS 05 05 23 Welding, Structural D Superseded by UFGS 05 05 23.16 Structural Welding for compliance with MasterFormat. Also, major revision to comply with ICC IBC 2012. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 05 23.16 Structural Welding N Superseding UFGS 05 05 23 Welding, Structural for compliance with MasterFormat. Section also updated to comply with ICC IBC 2012
May-2014 N UFGS 05 12 00 Structural Steel R Major revision to comply with IBC 2012
May-2014 A UFGS 05 50 14 Structural Metal Fabrications R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 50 15 Civil Works Fabrications R Major revision to comply with ICC IBC 2012
May-2014 S UFGS 05 51 00 Metal Stairs C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING.
May-2014 S UFGS 05 52 00 Metal Railings C 3 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning D Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 07 27 10.00 10 Building Air Barrier System N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 07 55 00 Protected Membrane Roofing (PMR) C 1 Energy efficiency requirements added
May-2014 N UFGS 08 34 16.20 Vertical Lift Fabric Doors R Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.
May-2014 N UFGS 08 53 00 Plastic Windows C 1 Modified subpart 1.6.3
May-2014 N UFGS 08 88 58 Air Traffic Control Tower Cab Glass N New section
May-2014 A UFGS 11 44 00 Food Cooking Equipment C 1 Energy efficiency requirements added
May-2014 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
May-2014 S UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units R Tri-Annual Database Maintenance (TADM) completed
May-2014 S UFGS 23 82 19.00 40 Fan Coil Units R Tri-Annual Database Maintenance (TADM) completed
May-2014 S UFGS 23 82 23.00 40 Unit Ventilators R Tri-Annual Database Maintenance (TADM) completed
May-2014 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 N UFGS 32 17 23.00 20 Pavement Markings C 1 Modified subpart 2.1 (note), 2.1.1 and 2.1.2.
May-2014 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) C 1 Clarified washer material requirements as noted in CCR 2605
May-2014 A UFGS 33 52 43.13 Aviation Fuel Piping C 1 Clarified washer material requirements as noted in CCR 2604
May-2014 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2014 A UFGS 35 01 43 Wire Rope for Gate Operating Devices D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 01 70.13 Wire Rope for Gate Operating Devices. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.

Pages