UFGS 01 35 26 Governmental Safety Requirements  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2018 N C 6 In response to CCR 5966, Note in para 1.6.1 has been updated to include Hawaii; in response to CCR 6077, item "e" under para 3.7.1 "Scaffolding" has been corrected.
Nov-2017 N C 5 Addition of lockout/tagout requirements when the Government of Utility is involved in the electrical outage
Feb-2017 N C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Nov-2016 N C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Aug-2016 N C 2 Changed requirements for portable ionizing radiation equipment.
May-2016 N C 1 Modified OSHA Form 300 and 300A requirements under Duties of the SSHO.
Nov-2015 N R Updated to EM 385-1-1 (NOV 2014) requirements and terms including clarifying requirements for Dive Protection, Fall Protection, Load Handling Equipment, and Electrical. Added Subcontractor Safety Requirements for Navy only.
Aug-2013 N C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2012 N C 1 Modified subpart 1.7
Feb-2012 N R Major revision
Feb-2010 N R Section References (SRF) update
Aug-2009 N R Major revision
Feb-2009 N R Added 1.6.1.2
Nov-2008 N R Added Note for NAVFAC Pacific projects
Aug-2008 N R Added missing Metric measurement and English measurement tags; Added Guam requirements to para 1.6.1.1
Apr-2008 N N Unified section; superseding UFGS 01 35 29 Safety and Occupational Health Requirements