UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Aug-2017 N UFGS 26 23 00 Low Voltage Switchgear C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Aug-2017 N UFGS 26 24 13 Switchboards C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Aug-2017 N UFGS 31 62 19.13 Timber Marine Piles C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Aug-2017 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement C 2 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Aug-2017 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities C 2 Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Aug-2017 N UFGS 32 13 43 Pervious Concrete Paving C 2 Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Aug-2017 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Aug-2017 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide , Open Protocol , Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Aug-2017 N UFGS 33 65 00 Cleaning Petroleum Storage Tanks C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
May-2017 N UFGS 05 50 13 Miscellaneous Metal Fabrications R Addressed the following CCRs: 1669-Include welded headed shear studs; 3556-Access Doors and panels relocated to new UFGS 08 31 00 ACCESS DOORS AND PANELS; Added different types of downspout terminations
May-2017 N UFGS 07 27 19.01 Self-Adhering Air Barriers N New specifications for vapor permeable and vapor retarding self-adhering air barrier systems as part of building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2017 N UFGS 07 27 26 Fluid-Applied Membrane Barriers N New specifications for vapor permeable and vapor retarding fluid applied air barrier systems as part of the building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2017 N UFGS 07 27 36 Spray Foam Air Barriers N New specifications for open and closed cell spray polyurethane foam (SPF) air barrier systems as part of the building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2017 N UFGS 07 60 00 Flashing and Sheet Metal R Addressed CCR 3360 which establishes Energy Star requirements.
May-2017 N UFGS 08 11 16 Aluminum Doors and Frames R Addressed the following CCRs: 1822-Air Infiltration requirements; 2330-Water penetration and insulation requirements; 2393-Requirements for ATFP and windborne debris regions; and 2392-Update requirements for thermal performance
May-2017 N UFGS 08 31 00 Access Doors and Panels N New Section
May-2017 N UFGS 08 34 16 Corrosion Control Hangar Doors R Complete revision as part of the normal refresh cycle and to coordinate with concurrent revisions to UFC 4-211-01 which is becoming a Tri-Service document.
May-2017 N UFGS 08 34 16.10 Horizontal Rolling Steel Doors R Complete revision as part of the normal refresh cycle and to coordinate with concurrent revisions to UFC 4-211-01 which is becoming a Tri-Service document.
May-2017 N UFGS 23 82 46.00 40 Electric Unit Heaters R Tri-Annual Database Maintenance (TADM) completed
May-2017 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers R Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology.
May-2017 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers R Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology.
May-2017 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement D Pervious Bituminous Concrete Pavement lacks an acceptable industry standard and the majority of Installations do not have acceptable maintenance practices in place to perform required maintenance. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 N UFGS 48 15 00 Wind Generator System N New Section.
May-2017 N UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials C 1 In response to CCR 5044, updated language in paragraph 3.1.3.2 for the Asbestos Warning Label per OSHA 1926.1101(k)(8)(iii).
May-2017 N UFGS 07 11 13 Bituminous Dampproofing C 1 In response to CCR 1816, updated para 1.3-Delivery and Storage
May-2017 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems C 1 Clarified contractor requirements throughout. Revised the subparagraphs of 1.2.4 to remove requirements to be performed by the Government and to clarify the Contractor's requirements. CCR 5584: Revised 1.2 and 3.1 to read QUALITY CONTROL and FIELD QUALITY CONTROL, respectively. CCR 5629: Clarified 1.2.1 and 1.2.2 to provide submittal via Registered Mail.
May-2017 N UFGS 31 31 16.19 Termite Control Barriers C 1 Changes made to include a note for Air Force to use Chemical Termite Control and deleting reference to ASTM C289 in response to CCR 4978.
May-2017 N UFGS 32 84 24 Irrigation Sprinkler Systems C 1 Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307
Feb-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting R Required revisions in order to align with numerous changes in Federal requirements and DOD policy.
Feb-2017 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems N New Navy-only Section identifying the requirements for a NAVFAC Cybersecurity Hygiene Checklist.
Feb-2017 N UFGS 01 35 26 Governmental Safety Requirements C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Feb-2017 N UFGS 02 83 13.00 20 Lead in Construction C 1 CCR 5279: updated paragraph 1.5.2.2 Lead Compliance Plan.
Feb-2017 N UFGS 07 22 00 Roof and Deck Insulation C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
Feb-2017 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 BACnet Operator Workstation (B-OWS) updated to BACnet Advanced Operator Workstation (B-AWS) in 2.1.6.2-[BACnet Operator Workstation][and][Notebook Computer] DDC Software.
Feb-2017 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 4 Updated Technical Note in 2.2.2-Fittings and End Connections (Joints)
Feb-2017 N UFGS 32 93 00 Exterior Plants C 2 CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section.
Aug-2016 N UFGS 06 10 00 Rough Carpentry R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 06 20 00 Finish Carpentry R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 31 13 Asphalt Shingles R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 61 14.00 20 Steel Standing Seam Roofing R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 92 00 Joint Sealants R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 08 14 00 Wood Doors R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 23 00 Gypsum Plastering R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 26 00 Veneer Plaster R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 29 00 Gypsum Board R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 64 00 Portable (Demountable) Wood Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 64 66 Wood Athletic Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Oct-2016 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R INTERIM RELEASE: It was recently brought to our attention that the February 2016 revision of this section contained performance requirements that have been met by only one supplier for the entire paint system. This revision restores the February 2010, Change 1 version that provides for a competitive product.
Aug-2016 N UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures N New section
Aug-2016 N UFGS 10 22 13 Wire Mesh Partitions R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 10 22 26.13 Accordion Folding Partitions R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 10 22 26.23 Coiling Partitions R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 12 22 00 Curtains and Drapes R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 31 31 16.13 Chemical Termite Control R Revised submittals, updated format and addressed the 26 comments in CCR #4559. Preparing Activity changed from USACE to NAVFAC
Aug-2016 N UFGS 32 01 13.00 20 Emulsified Asphalt Seal Coats [with] [without] Aggregate D UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats supersedes portions of this UFGS section. The remainder of content within this UFGS section also exists in UFGS 32 01 13 Bituminous Seal and Fog Coats; therefore it is not necessary to maintain this UFGS section any longer. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2016 N UFGS 33 01 30.16 TV Inspection of Sewer Lines N New section
Aug-2016 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type D Superseded by UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2016 N UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations N Superseding Section 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type. Includes updates to format as well as technical updates and adding non clog submersible pipe.
Aug-2016 N UFGS 01 35 26 Governmental Safety Requirements C 2 Changed requirements for portable ionizing radiation equipment.
Aug-2016 N UFGS 01 57 19 Temporary Environmental Controls C 1 Fixed bracketed items and tailoring.
Aug-2016 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Changed NAVFAC NW Installation's notes, and related information, for Hazardous Waste Management.
Aug-2016 N UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats C 1 Proprietary language has been removed from this specification.
Aug-2016 N UFGS 33 01 30.72 Relining Sewers C 1 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
Aug-2016 N UFGS 33 05 23 Trenchless Utility Installation C 2 Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines
May-2016 N UFGS 03 45 00 Precast Architectural Concrete R Complete review and revision of section.
May-2016 N UFGS 03 45 33 Precast [Prestressed] Structural Concrete R Complete review and revision of section.
May-2016 N UFGS 14 21 00.00 20 Electric Traction Elevators D Superseded by completely revised UFGS sections 14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS and 14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2016 N UFGS 14 21 13 Electric Traction Freight Elevators R Complete revision. Preparing Activity changed from USACE to NAVFAC.
May-2016 N UFGS 14 21 23 Electric Traction Passenger Elevators R Complete revision. Preparing Activity changed from USACE to NAVFAC.
May-2016 N UFGS 14 24 13 Hydraulic Freight Elevators N Superseding UFGS 14 24 00 HYDRAULIC ELEVATORS previously prepared by USACE. Complete review and update concerning hydraulic freight elevators.
May-2016 N UFGS 14 24 23 Hydraulic Passenger Elevators N Superseding UFGS 14 24 00 HYDRAULIC ELEVATORS previously prepared by USACE. Complete review and update concerning hydraulic freight elevators.
May-2016 N UFGS 26 51 00 Interior Lighting R Complete revision that includes a new and different product, LED light sources and LED light fixtures.
May-2016 N UFGS 28 20 00.00 20 Electronic Security Systems (ESS) Commercial D Superseded by UFGS 28 10 05 Electronic Security Systems (ESS). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2016 N UFGS 33 01 30.72 Relining Sewers N Superseding 33 01 99 Slip Lining of Existing Piping (Preparing Activity NASA).
May-2016 N UFGS 33 11 00 Water Utility Distribution Piping R Title changed from WATER DISTRIBUTION; revised throughout, superseding the previous section.
May-2016 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 2 Administrative, revised use of "The Contractor" and "shall"
May-2016 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 2 Added requirement for restrictions on Radio Transmitter Equipment previously located in Section 01 57 19.02.
May-2016 N UFGS 01 20 00.00 20 Price and Payment Procedures C 1 Updated invoice form numbers and DFARS clause for submission of Invoices.
May-2016 N UFGS 01 35 26 Governmental Safety Requirements C 1 Modified OSHA Form 300 and 300A requirements under Duties of the SSHO.
May-2016 N UFGS 08 51 13 Aluminum Windows C 2 CCR 3599: Removed ASTM D1972 reference from section and revised text in subpart 1.7
May-2016 N UFGS 08 51 23 Steel Windows C 2 CCR 4166: Removed subpart 2.2.6 and reference ASTM A167
May-2016 N UFGS 08 52 00 Wood Windows C 2 CCR 3600: Removed ASTM D1972 reference from section and revised text in subpart 1.4.1
May-2016 N UFGS 22 00 00 Plumbing, General Purpose C 1 Added Navy and Army/Air Force bracketed options to subpart 2.16
May-2016 N UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal C 2 Administrative changes per CCR 580
May-2016 N UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) C 2 CCR 4532: revised use of "shall" and imperative language
May-2016 N UFGS 32 92 19 Seeding C 1 CCR 4742: Revised subpart 3.4.4
May-2016 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 3 CCR 4187: Removed ASTM A167 reference from section. CCR 4581: Revised subpart 2.13.8 by replacing ASTM A176 with ASTM A240/A240M.
May-2011 N UFGS 00 22 13 Supplementary Instructions to Bidders R Reference update: modified subpart 1.1
May-2011 N UFGS 01 14 00 Work Restrictions R Modified subparts 1.4.1.2, 1.4.1.3, 1.4.10 and 1.5.7
May-2011 N UFGS 01 30 00 Administrative Requirements R Modified subparts 1.2, 1.7, 1.9, 1.15 and 1.16
May-2011 N UFGS 02 85 00.00 20 Mold Remediation R Modified General Note, subpart 1.2.16 and Appendix B, Note C
May-2011 N UFGS 06 10 00 Rough Carpentry R Reference updates: modified subparts 2.5.10.2 and 3.5; Removed subparts 2.6.5 and 2.6.9
May-2011 N UFGS 07 19 00 Water Repellents R Reference update: modified subpart 2.3.1 through 2.3.4
May-2011 N UFGS 07 21 13 Board and Block Insulation R Reference update: modified subpart 2.1.2
May-2011 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Reference update: modified subpart 2.1
May-2011 N UFGS 07 21 23 Loose Fill Thermal Insulation R Reference update: modified subpart 2.1
May-2011 N UFGS 07 22 00 Roof and Deck Insulation R Reference updates: Modified General Note, subparts 1.2 (note) and 2.1.1
May-2011 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Reference update: modified subpart 1.4
May-2011 N UFGS 07 31 13 Asphalt Shingles R Reference update: modified subpart 2.1.1