UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output)  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2018 N C 3

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

May-2016 N C 2

CCR 4532: revised use of "shall" and imperative language

Aug-2015 N C 1

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

May-2015 N R

Revised throughout to incorporate CCRs 1007 and 4266. Modifications included references, boiler installation requirements, detail drawings, water analysis, safety standards, submittals, controls, safety features, operational tests, and acceptance operational test and inspection.