1000.6 PBS P-120 Public Buildings Service Cost and Schedule Management Policy Requirements |
Federal Facility Criteria (FFC) |
AE120 Requirements for Project & Construction Cost Estimating Services |
Federal Facility Criteria (FFC) |
Consider Non-Quantifiable Benefits |
Design Objective |
Cost–Effective |
Design Objective |
GSA LEED Cost Study |
Federal Facility Criteria (FFC) |
Making the Business Case for Resilience Projects |
Continuing Education |
Manual for Preparation of Cost Estimates and Related Documents for VA Facilities |
Federal Facility Criteria (FFC) |
NAVFAC Cost Engineering Policy and Procedures, v1.0, Replaced by FC-1-300-09N |
Federal Facility Criteria (FFC) |
NAVFAC MII Template English 2022V1 |
Federal Facility Criteria (FFC) |
Setting Escalation Rates Responsibly: FEMP Guidance and the EERC |
Continuing Education |
Use Economic Analysis to Evaluate Design Alternatives |
Design Objective |
Utilize Cost and Value Engineering Throughout the Project Life Cycle |
Design Objective |
Working with Your Utility Series: Utility Cost Implications of a Distributed Energy Project |
Continuing Education |