1000.6 PBS P-120 Public Buildings Service Cost and Schedule Management Policy Requirements |
Federal Facility Criteria (FFC) |
AE120 Requirements for Project & Construction Cost Estimating Services |
Federal Facility Criteria (FFC) |
Consider Non-Quantifiable Benefits |
Design Objective |
Cost–Effective |
Design Objective |
Estimating - Manual for Preparation of Cost Estimates and Related Documents for VA Facilities |
Federal Facility Criteria (FFC) |
GSA LEED Cost Study |
Federal Facility Criteria (FFC) |
NAVFAC Cost Engineering Policy and Procedures, v1.0, Replaced by FC-1-300-09N |
Federal Facility Criteria (FFC) |
NAVFAC MII English Template V5 |
Federal Facility Criteria (FFC) |
NISTIR 85-3273-34 Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis – 2019 Annual Supplement to NIST Handbook 135 |
Federal Facility Criteria (FFC) |
Remedial Action Cost Engineering and Requirements (RACER®) |
Tools |
Use Economic Analysis to Evaluate Design Alternatives |
Design Objective |
Utilize Cost and Value Engineering Throughout the Project Life Cycle |
Design Objective |