UFC 3-520-02 Facility Energy System Resilience and Reliability

This Unified Facilities Criteria (UFC) summarizes current knowledge, research related to backup power system reliability, and identified best cost options in areas for R&D investment. The scope of this document is electrical systems, cooling systems (chilled water systems, condenser water systems, and all other aspects for facility cooling) and control systems.

USACE ECB 2023-9 Civil Works Design Milestone Checklists -- Category: Guidance

The purpose of this Engineering and Construction Bulletin (ECB) is to provide Project Delivery Teams (PDTs) with a list of submittal requirements by design milestone to identify design issues early enough to allow for mitigation or resolution. This ECB serves as a roadmap and a best practice and is not a comprehensive list of requirements. The items in this checklist have been associated with quality issues that impact project schedule and increase project costs.