0
Date:
05-01-2024
PG 18-15 Volume DB completely replaces all elements of PG 18-15 Volume E, Design-Build Projects: Request for Proposal, to follow PG 18-15 Volume B formatting. This replacement document provides detailed checklists outlining all elements of the AE design period deliverables for a major design-build project.
View/Download:
Federal Facility Criteria:
Topics: