Market Style BEQ Model RFP  

Date: 
01-15-2020

FOR ALL DOCUMENTS AND ATTACHMENTS–Download the complete set zipped file. You may also add your company name, work order number, and project name to the documents in a customizable set.

FOR INDIVIDUAL DOCUMENTS–Find the document in the list below and download the appropriate format.

Questions, comments, suggestions and recommended changes for the NDBM are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the appropriate document below.

These documents are available in the following formats:   Microsoft Word, Excel and SpecsIntact in compressed ZIP
 Adobe Acrobat (PDF)  |   Microsoft Word (DOC)  |   SpecsIntact (SEC) in compressed ZIP

Title Date View CCR
MARKET STYLE BEQ COMPLETE SET 01-15-2020  ZIP  
PART 2 - GENERAL REQUIREMENTS
1.0 Table of Contents (RFP Parts 2-6) 12-15-2018  DOC  CCR
UFGS 01 14 00 Work Restrictions 11-01-2011  PDF  |   ZIP  CCR
UFGS 01 20 00.05 20 Price and Payment Procedures for Design-Build 01-01-2012  PDF  |   ZIP  CCR
UFGS 01 30 00.05 20 Administrative Requirements for Design-Build 03-01-2013  PDF  |   ZIP  CCR
UFGS 01 31 19.05 20 Post Award Meetings 09-01-2015  PDF  |   ZIP  CCR
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System 05-01-2017  PDF  |   ZIP  CCR
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) 05-01-2018  PDF  |   ZIP  CCR
UFGS 01 33 00.05 20 Construction Submittal Procedures 05-01-2014  PDF  |   ZIP  CCR
UFGS 01 33 10.05 20 Design Submittal Procedures 05-01-2017  PDF  |   ZIP  CCR
UFGS 01 33 29.05 20 Sustainability Reporting for Design-Build 03-01-2019  PDF  |   ZIP  CCR
UFGS 01 35 13.05 20 Special Project Procedures for Design-Build 11-01-2007  PDF  |   ZIP  CCR
UFGS 01 35 26.05 20 Government Safety Requirements for Design-Build 12-01-2015  PDF  |   ZIP  CCR
UFGS 01 45 00.05 20 Design and Construction Quality Control 06-01-2015  PDF  |   ZIP  CCR
UFGS 01 45 35.05 20 Special Inspections 09-01-2015  PDF  |   ZIP  CCR
UFGS 01 50 00.05 20 Temporary Facilities and Controls for Design-Build 11-01-2007  PDF  |   ZIP  CCR
UFGS 01 57 19 Temporary Environmental Controls 11-01-2015  PDF  |   ZIP  CCR
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls 11-01-2015  PDF  |   ZIP  CCR
UFGS 01 74 19 Construction Waste Management and Disposal 02-01-2019  PDF  |   ZIP  CCR
UFGS 01 78 00 Closeout Submittals 05-01-2019  PDF  |   ZIP  CCR
UFGS 01 78 23 Operation & Maintenance Data 08-01-2015  PDF  |   ZIP  CCR
UFGS 01 78 24.00 20 Facility Electronic Operation and Maintenance Support Information (eOMSI) 02-01-2015  PDF  |   ZIP  CCR
UFGS 01 91 00.15 Total Building Commissioning 02-01-2019  PDF  |   ZIP  CCR
PART 3 - PROJECT PROGRAM
1.0 Project Description 12-15-2018  DOC  CCR
2.0 Project Objectives 02-01-2018  DOC  CCR
3.0 Site Analysis 02-01-2018  DOC  CCR
4.0 Building Requirement 02-01-2018  DOC  CCR
5.0 Room Requirements 02-01-2018  DOC  CCR
6.0 Engineering System Requirements  CCR
   –  ESR-A10 Foundations 02-01-2018  DOC  CCR
   –  ESR-A20 Basement Construction 02-01-2018  DOC  CCR
   –  ESR-B10 Superstructure 02-01-2018  DOC  CCR
   –  ESR-B20 Exterior Closure 02-01-2018  DOC  CCR
   –  ESR-B30 Roofing 02-01-2018  DOC  CCR
   –  ESR-C10 Interior Construction 02-01-2018  DOC  CCR
   –  ESR-C20 Stairs 02-01-2018  DOC  CCR
   –  ESR-C30 Interior Finishes 02-01-2018  DOC  CCR
   –  ESR-D10 Conveying 02-01-2018  DOC  CCR
   –  ESR-D20 Plumbing 02-01-2018  DOC  CCR
   –  ESR-D30 HVAC 01-15-2020  DOC  CCR
   –  ESR-D40 Fire Protection 02-01-2018  DOC  CCR
   –  ESR-D50 Electrical 12-15-2018  DOC  CCR
   –  ESR-E10 Equipment 02-01-2018  DOC  CCR
   –  ESR-E20 Furnishings 02-01-2018  DOC  CCR
   –  ESR-F10 Special Construction 02-01-2018  DOC  CCR
   –  ESR-F20 Selective Building Demolition 01-15-2020  DOC  CCR
   –  ESR-G10 Site Preparation 01-15-2020  DOC  CCR
   –  ESR-G20 Site Improvements 02-01-2018  DOC  CCR
   –  ESR-G30 Site Civil/Mechanical Utilities 02-01-2018  DOC  CCR
   –  ESR-G40 Site Electrical Utilities 02-01-2018  DOC  CCR
PART FOUR - PERFORMANCE TECHNICAL SPECIFICATIONS
PTS-A10 Foundations 12-15-2018  DOC  CCR
PTS-A20 Basement Construction 12-15-2018  DOC  CCR
PTS-B10 Superstructure 12-15-2018  DOC  CCR
PTS-B20 Exterior Enclosure 12-15-2018  DOC  CCR
PTS-B30 Roofing 12-15-2018  DOC  CCR
PTS-B30 Appendix A Forms 12-15-2018  DOC  CCR
PTS-C10 Interior Construction 12-15-2018  DOC  CCR
PTS-C20 Stairs 12-15-2018  DOC  CCR
PTS-C30 Interior Finishes 01-15-2020  DOC  CCR
PTS-D10 Conveying 12-15-2018  DOC  CCR
PTS-D20 Plumbing 12-15-2018  DOC  CCR
PTS-D30 HVAC 12-15-2018  DOC  CCR
PTS-D40 Fire Protection 12-15-2018  DOC  CCR
PTS-D50 Electrical 12-15-2018  DOC  CCR
PTS-E10 Equipment 12-15-2018  DOC  CCR
PTS-E20 Furnishings 12-15-2018  DOC  CCR
PTS-F10 Special Construction 12-15-2018  DOC  CCR
PTS-F20 Selective Building Demolition 12-15-2018  DOC  CCR
PTS-G10 Site Preparation 12-15-2018  DOC  CCR
PTS-G20 Site Improvements 12-15-2018  DOC  CCR
PTS-G30 Site Civil/Mechanical Utilities 12-15-2018  DOC  CCR
PTS-G40 Site Electrical Utilities 12-15-2018  DOC  CCR
PTS-Z10 General Performance Technical Specification 12-15-2018  DOC  CCR
Federal Facility Criteria: