Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated May 11, 2023; Posted May 25, 2023

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 33 56 19 Fuel Impermeable Liner System   11-01-2022  PDF |  ZIP  CCR
UFGS 26 12 21 Single-Phase Pad-Mounted Transformers   11-01-2022  PDF |  ZIP  CCR
UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type   11-01-2022  PDF |  ZIP  CCR
UFGS 26 05 19.00 10 Insulated Wire and Cable   11-01-2022  PDF |  ZIP  CCR
UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type   11-01-2022  PDF |  ZIP  CCR
UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes   11-02-2022  PDF |  ZIP  CCR
UFGS 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package   02-01-2023  PDF |  ZIP  CCR
UFGS 33 71 01.00 40 Overhead Transmission and Distribution   02-01-2023  PDF |  ZIP  CCR
UFGS 13 31 33 Frame Supported Membrane Structures for Protection of Aircraft   02-01-2023  PDF |  ZIP  CCR
UFGS 40 17 30.00 40 Welding General Piping   02-01-2023  PDF |  ZIP  CCR
UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping   02-01-2023  PDF |  ZIP  CCR
UFGS 23 22 23.00 40 Steam Condensate Pumps   02-01-2023  PDF |  ZIP  CCR
UFGS 23 41 13.00 40 Panel Filters   02-01-2023  PDF |  ZIP  CCR
UFGS 27 13 23.00 40 Communications Optical Backbone Cabling   02-01-2023  PDF |  ZIP  CCR
UFGS 22 07 19.00 40 Plumbing Piping Insulation   02-01-2023  PDF |  ZIP  CCR
UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm   02-01-2023  PDF |  ZIP  CCR
UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications   02-01-2023  PDF |  ZIP  CCR
UFGS 22 14 29.00 Sump Pumps   02-01-2023  PDF |  ZIP  CCR
Unified Master Reference List (UMRL)   04-01-2023  PDF
Division 07 - Thermal and Moisture Protection   05-01-2023  ZIP
Division 32 - Exterior Improvements   05-01-2023  ZIP
UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers   05-01-2023  PDF |  ZIP  CCR
Division 08 - Openings   05-01-2023  ZIP
Division 33 - Utilities   05-01-2023  ZIP
UFGS 26 56 13.00 40 Lighting Poles and Standards   05-01-2023  PDF |  SEC  CCR
Division 09 - Finishes   05-01-2023  ZIP
Division 34 - Transportation   05-01-2023  ZIP
Division 10 - Specialties   05-01-2023  ZIP
Division 35 - Waterway and Marine Construction   05-01-2023  ZIP
Division 11 - Equipment   05-01-2023  ZIP
Division 40 - Process Integration   05-01-2023  ZIP
Division 12 - Furnishings   05-01-2023  ZIP
Division 41 - Material Processing and Handling Equipment   05-01-2023  ZIP
Division 13 - Special Construction   05-01-2023  ZIP
Division 42 - Process Heating, Cooling and Drying Equipment   05-01-2023  ZIP
Division 14 - Conveying Equipment   05-01-2023  ZIP
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment   05-01-2023  ZIP
Division 21 - Fire Suppression   05-01-2023  ZIP
UFGS 01 91 19 Building Enclosure Commissioning   05-01-2023  PDF |  ZIP  CCR
Division 44 - Pollution and Waste Control Equipment   05-01-2023  ZIP
Division 00 - Procurement and Contracting Requirements   05-01-2023  ZIP
Division 22 - Plumbing   05-01-2023  ZIP
UFGS 31 41 16.16 Synthetic Sheet Piling   05-01-2023  PDF |  ZIP  CCR
Division 46 - Water and Wastewater Equipment   05-01-2023  ZIP
UFGS Forms, Graphics, and Tables   05-01-2023
Division 01 - General Requirements   05-01-2023  ZIP
Division 23 - Heating, Ventilating, and Air Conditioning   05-01-2023  ZIP
UFGS 23 08 00 Commissioning of Mechanical[ and Plumbing] Systems   05-01-2023  PDF |  ZIP  CCR
Division 48 - Electrical Power Generation   05-01-2023  ZIP
UFGS 01 78 24.00 10 Facility Data Requirements   05-01-2023  PDF |  ZIP  CCR
Division 02 - Existing Conditions   05-01-2023  ZIP
Division 25 - Integrated Automation   05-01-2023  ZIP
UFGS Complete   05-01-2023  PDF
UFGS 01 78 24.00 20 Facility Data Workbook (FDW)   05-01-2023  PDF |  ZIP  CCR
Division 03 - Concrete   05-01-2023  ZIP
Division 26 - Electrical   05-01-2023  ZIP
UFGS Table of Contents   05-01-2023  PDF
UFGS 01 91 00.15 Building Commissioning   05-01-2023  PDF |  ZIP  CCR
Division 04 - Masonry   05-01-2023  ZIP
Division 27 - Communications   05-01-2023  ZIP
UFGS 01 78 23 Operation and Maintenance Data   05-01-2023  PDF |  ZIP  CCR
Division 05 - Metals   05-01-2023  ZIP
Division 28 - Electronic Safety and Security   05-01-2023  ZIP
UFGS Changes and Revisions   05-01-2023
Division 06 - Wood, Plastics and Composites   05-01-2023  ZIP
Division 31 - Earthwork   05-01-2023  ZIP
UFGS MASTER   05-11-2023  ZIP

Pages