Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated February 9, 2023; Posted February 16, 2023

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems   02-01-2018  PDF |  ZIP  CCR
UFGS 05 72 00 Decorative Metal Specialties   05-01-2018  PDF |  ZIP  CCR
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)   05-01-2018  PDF |  ZIP  CCR
UFGS 33 30 00 Sanitary Sewerage   05-01-2018  PDF |  ZIP  CCR
UFGS 33 46 16 Subdrainage Piping   05-01-2018  PDF |  ZIP  CCR
UFGS 23 05 48.19 [Seismic] Bracing for HVAC   05-01-2018  PDF |  ZIP  CCR
UFGS 01 78 24.00 10 Facility Data Requirements   05-01-2018  PDF |  ZIP  CCR
UFGS 23 81 00 Decentralized Unitary HVAC Equipment   05-01-2018  PDF |  ZIP  CCR
UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil   05-01-2018  PDF |  ZIP  CCR
UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders   05-01-2018  PDF |  ZIP  CCR
UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 13.62 Asphalt Surface Treatment   05-01-2018  PDF |  ZIP  CCR
UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 16.70 Cold-Mix Reused Asphalt Paving   05-01-2018  PDF |  ZIP  CCR
UFGS 32 01 16.74 In Place Hot Reused Asphalt Paving   05-01-2018  PDF |  ZIP  CCR
UFGS 32 16 19 Concrete Curbs, Gutters and Sidewalks   05-01-2018  PDF |  ZIP  CCR
UFGS 46 53 22 Trickling Filter   05-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System   08-01-2018  PDF |  ZIP  CCR
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules   08-01-2018  PDF |  ZIP  CCR
UFGS 01 33 00 Submittal Procedures   08-01-2018  PDF |  ZIP  CCR
UFGS 02 62 13.00 10 Air and Steam Stripping   08-01-2018  PDF |  ZIP  CCR
UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments   08-01-2018  PDF |  ZIP  CCR
UFGS 05 05 23.16 Structural Welding   08-01-2018  PDF |  ZIP  CCR
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 05 12 00 Structural Steel   08-01-2018  PDF |  ZIP  CCR
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers   08-01-2018  PDF |  ZIP  CCR
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures   08-01-2018  PDF |  ZIP  CCR
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters   08-01-2018  PDF |  ZIP  CCR
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method   08-01-2018  PDF |  ZIP  CCR
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems   08-01-2018  PDF |  ZIP  CCR
UFGS 05 50 14 Structural Metal Fabrications   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.12 Aviation Fuel Pantographs   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.13 Aviation Fuel Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.14 Aviation Fuel Control Valves   08-01-2018  PDF |  ZIP  CCR
UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish   08-01-2018  PDF |  ZIP  CCR
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V])   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.23 Aviation Fuel Pumps   08-01-2018  PDF |  ZIP  CCR
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks)   08-01-2018  PDF |  ZIP  CCR
UFGS 05 50 15 Civil Works Fabrications   08-01-2018  PDF |  ZIP  CCR
UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements   08-01-2018  PDF |  ZIP  CCR
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space   11-01-2018  PDF |  ZIP  CCR
UFGS 35 73 13 Embankment for Earth and Rockfill Dams   11-01-2018  PDF |  ZIP  CCR
UFGS 31 11 00 Clearing and Grubbing   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 31 21 13 Radon Mitigation   11-01-2018  PDF |  ZIP  CCR
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials   11-01-2018  PDF |  ZIP  CCR
UFGS 02 82 00 Asbestos Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 10 Fuel Systems Piping (Service Station)   11-01-2018  PDF |  ZIP  CCR
UFGS 02 83 00 Lead Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 02 85 00 Mold Remediation   11-01-2018  PDF |  ZIP  CCR
UFGS 11 11 37 Electric Vehicle Supply Equipment   11-01-2018  PDF |  ZIP  CCR
UFGS 33 09 52 Fuel Pump Control and Annunciation System (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 35 41 00 Levee Construction   11-01-2018  PDF |  ZIP  CCR
UFGS 32 01 29.62 Concrete Pavement Raising   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 23.15 POL Service Piping Welding   11-01-2018  PDF |  ZIP  CCR
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration   02-01-2019  PDF |  ZIP  CCR
UFGS 01 42 00 Sources for Reference Publications   02-01-2019  PDF |  ZIP  CCR
UFGS 32 12 15.16 Stone Matrix Asphalt (SMA) for Airfield Paving   02-01-2019  PDF |  ZIP  CCR
UFGS 21 13 25 High-Expansion Foam System, Fire Protection   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 00 Instrumentation and Control for HVAC   02-01-2019  PDF |  SEC  CCR
UFGS 26 56 20 Airfield and Heliport Lighting and Visual Navigation Aids   02-01-2019  PDF |  ZIP  CCR
UFGS 03 31 30 Marine Concrete   02-01-2019  PDF |  ZIP  CCR
UFGS 01 74 19 Construction Waste Management and Disposal   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems   02-01-2019  PDF |  ZIP  CCR
UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems   02-01-2019  PDF |  ZIP  CCR
UFGS 03 30 00 Cast-In-Place Concrete   02-01-2019  PDF |  ZIP  CCR
UFGS 03 31 29 Marine Concrete with Service Life Modeling   02-01-2019  PDF |  ZIP  CCR
UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines)   02-01-2019  PDF |  ZIP  CCR
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks   05-01-2019  PDF |  ZIP  CCR
UFGS 33 71 01 Overhead Transmission and Distribution   05-01-2019  PDF |  ZIP  CCR
UFGS 08 44 00 Curtain Wall and Glazed Assemblies   05-01-2019  PDF |  ZIP  CCR
UFGS 08 51 13 Aluminum Windows   05-01-2019  PDF |  ZIP  CCR
UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices   05-01-2019  PDF |  ZIP  CCR
UFGS 33 73 00.00 40 Utility Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 26 60 13.00 40 Low-Voltage Motors   05-01-2019  PDF |  ZIP  CCR
UFGS 01 78 00 Closeout Submittals   05-01-2019  PDF |  ZIP  CCR
UFGS 01 91 00.15 10 Total Building Commissioning   05-01-2019  PDF |  ZIP  CCR
UFGS 26 24 19.00 40 Motor-Control Centers   05-01-2019  PDF |  ZIP  CCR
UFGS 26 33 53 Static Uninterruptible Power Supply (UPS)   05-01-2019  PDF |  ZIP  CCR
UFGS 08 81 00 Glazing   05-01-2019  PDF |  ZIP  CCR
UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems   08-01-2019  PDF |  ZIP  CCR
UFGS 26 09 23.00 40 Lighting Control Devices   08-01-2019  PDF |  ZIP  CCR
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters   08-01-2019  PDF |  ZIP  CCR
UFGS 26 20 00 Interior Distribution System   08-01-2019  PDF |  ZIP  CCR
UFGS 26 24 16.00 40 Panelboards   08-01-2019  PDF |  ZIP  CCR
UFGS 26 35 33.00 40 Power Factor Correction Equipment   08-01-2019  PDF |  ZIP  CCR
UFGS 01 58 00 Project Identification   08-01-2019  PDF |  ZIP  CCR
UFGS 07 27 10.00 10 Building Air Barrier System   08-01-2019  PDF |  ZIP  CCR
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines   08-01-2019  PDF |  ZIP  CCR
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant)   08-01-2019  PDF |  ZIP  CCR
UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness   08-01-2019  PDF |  ZIP  CCR
UFGS 09 23 82 Fireproof Gypsum Plastering   11-01-2019  PDF |  ZIP  CCR
UFGS 09 67 23.13 Standard Resinous Flooring   11-01-2019  PDF |  ZIP  CCR
UFGS 31 63 29 Drilled Concrete Piers and Shafts   11-01-2019  PDF |  ZIP  CCR
UFGS 09 97 13.00 40 Steel Coatings   11-01-2019  PDF |  ZIP  CCR
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement   11-01-2019  PDF |  ZIP  CCR
UFGS 02 42 51 Carpet Removal and Reclamation   11-01-2019  PDF |  ZIP  CCR
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 13 Aircraft Tiedowns   11-01-2019  PDF |  ZIP  CCR
UFGS 32 11 36.13 Lean Concrete Base Course   11-01-2019  PDF |  ZIP  CCR
UFGS 32 11 13.13 Lime Treated Subgrade   11-01-2019  PDF |  ZIP  CCR
UFGS 33 05 23.13 Utility Horizontal Directional Drilling   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses   11-01-2019  PDF |  ZIP  CCR
UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames   11-01-2019  PDF |  ZIP  CCR
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.)   11-01-2019  PDF |  ZIP  CCR
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running   11-01-2019  PDF |  ZIP  CCR
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations   11-01-2019  PDF |  ZIP  CCR
UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant   11-01-2019  PDF |  ZIP  CCR
UFGS 08 34 73 Sound Control Door Assemblies   11-01-2019  PDF |  ZIP  CCR
UFGS 05 14 00.13 Welding Structural Aluminum Framing   11-01-2019  PDF |  ZIP  CCR
UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 10 44 16 Fire Extinguishers   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 16.19 Cold-Mix Asphalt Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 16 Airfield Grounding   11-01-2019  PDF |  ZIP  CCR
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall   02-01-2020  PDF |  ZIP  CCR
UFGS 33 01 50.31 Leak Detection For Fueling Systems   02-01-2020  PDF |  ZIP  CCR
UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units   02-01-2020  PDF |  ZIP  CCR

Pages