Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated August 18, 2023; Posted August 24, 2023

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   SpecsIntact (SEC) in compressed ZIP  |   Adobe Acrobat (PDF)

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Titlesort descending Date View CCR
UFGS 32 12 16.19 Cold-Mix Asphalt Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 17.19 Fuel Resistant Asphalt Paving For Airfields - Surface Course   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 36.13 Asphaltic Seal and Fog Coats   05-01-2017  PDF |  ZIP  CCR
UFGS 32 12 36.26 Polymer Concrete Micro-Overlay (PCMO) For Fuel And Abrasion Resistant Wearing Surfaces   11-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.17 Roller Compacted Concrete Paving   11-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.43 High Temperature Concrete Paving for Airfields Using Lightweight and Traprock Aggregates   02-01-2018  PDF |  ZIP  CCR
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements   11-01-2022  PDF |  ZIP  CCR
UFGS 32 13 14.14 Concrete Paving for Small Airfield Projects   08-01-2023  PDF |  ZIP  CCR
UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes   11-02-2022  PDF |  ZIP  CCR
UFGS 32 13 43 Pervious Concrete Paving   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant   11-01-2019  PDF |  ZIP  CCR
UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 32 15 00 Aggregate Surfacing   05-01-2017  PDF |  ZIP  CCR
UFGS 32 16 19 Concrete Curbs, Gutters and Sidewalks   05-01-2018  PDF |  ZIP  CCR
UFGS 32 17 23 Pavement Markings   08-01-2016  PDF |  ZIP  CCR
UFGS 32 18 16.13 Playground Protective Surfacing   08-01-2017  PDF |  ZIP  CCR
UFGS 32 31 13 Chain Link Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 26 Wire Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall   02-01-2020  PDF |  ZIP  CCR
UFGS 32 84 23 Underground Sprinklers   02-01-2021  PDF |  ZIP  CCR
UFGS 32 84 24 Irrigation Sprinkler Systems   08-01-2011  PDF |  ZIP  CCR
UFGS 32 92 19 Seeding   08-01-2017  PDF |  ZIP  CCR
UFGS 32 92 23 Sodding   04-01-2006  PDF |  ZIP  CCR
UFGS 32 92 26 Sprigging   08-01-2017  PDF |  ZIP  CCR
UFGS 32 93 00 Exterior Plants   08-01-2017  PDF |  ZIP  CCR
UFGS 32 96 00 Transplanting Exterior Plants   08-01-2017  PDF |  ZIP  CCR
UFGS 33 01 30.16 TV Inspection of Sewer Lines   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 30.72 Relining Sewers   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.31 Leak Detection For Fueling Systems   02-01-2020  PDF |  ZIP  CCR
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications   02-01-2023  PDF |  ZIP  CCR
UFGS 33 05 23 Trenchless Utility Installation   08-01-2015  PDF |  ZIP  CCR
UFGS 33 05 23.13 Utility Horizontal Directional Drilling   11-01-2019  PDF |  ZIP  CCR
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up   08-01-2018  PDF |  ZIP  CCR
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant)   08-01-2019  PDF |  ZIP  CCR
UFGS 33 09 52 Fuel Pump Control and Annunciation System (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III)   02-01-2021  PDF |  ZIP  CCR
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V])   08-01-2018  PDF |  ZIP  CCR
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks)   08-01-2018  PDF |  ZIP  CCR
UFGS 33 11 00 Water Utility Distribution Piping   02-01-2018  PDF |  ZIP  CCR
UFGS 33 11 13 Potable Water Supply Wells   08-01-2017  PDF |  ZIP  CCR
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping   11-01-2009  PDF |  ZIP  CCR
UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank   04-01-2006  PDF |  ZIP  CCR
UFGS 33 16 15 Water Storage Steel Tanks   11-01-2020  PDF |  ZIP  CCR
UFGS 33 26 00.00 10 Relief Wells   04-01-2008  PDF |  ZIP  CCR
UFGS 33 30 00 Sanitary Sewerage   05-01-2018  PDF |  ZIP  CCR
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations   11-01-2019  PDF |  ZIP  CCR
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers   08-01-2018  PDF |  ZIP  CCR
UFGS 33 40 00 Stormwater Utilities   11-01-2021  PDF |  ZIP  CCR
UFGS 33 46 13 Foundation Drainage   05-01-2020  PDF |  ZIP  CCR
UFGS 33 46 16 Subdrainage Piping   05-01-2018  PDF |  ZIP  CCR
UFGS 33 47 13 Pond and Reservoir Liners   11-01-2014  PDF |  ZIP  CCR
UFGS 33 51 13.00 30 Natural-Gas Metering   05-01-2010  PDF |  ZIP  CCR
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines   08-01-2019  PDF |  ZIP  CCR
UFGS 33 51 39 Monitoring Wells   08-01-2017  PDF |  ZIP  CCR
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures   05-01-2022  PDF |  ZIP  CCR
UFGS 33 52 10 Fuel Systems Piping (Service Station)   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 23.15 POL Service Piping Welding   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.12 Aviation Fuel Pantographs   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.13 Aviation Fuel Piping   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.14 Aviation Fuel Control Valves   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.23 Aviation Fuel Pumps   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System   08-01-2018  PDF |  ZIP  CCR
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems   08-01-2022  PDF |  ZIP  CCR
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks   05-01-2019  PDF |  ZIP  CCR
UFGS 33 56 19 Fuel Impermeable Liner System   11-01-2022  PDF |  ZIP  CCR
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space   11-01-2018  PDF |  ZIP  CCR
UFGS 33 56 53 Compressed Gases Storage Tanks   05-01-2020  PDF |  ZIP  CCR
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant)   11-01-2018  PDF |  ZIP  CCR
UFGS 33 60 02 Aboveground Heat Distribution System   04-01-2008  PDF |  ZIP  CCR
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System   08-01-2010  PDF |  ZIP  CCR
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping   02-01-2010  PDF |  ZIP  CCR
UFGS 33 63 13 Exterior Underground Steam Distribution System   04-01-2006  PDF |  ZIP  CCR
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 33 63 14 Exterior Buried Pumped Condensate Return   04-01-2006  PDF |  ZIP  CCR
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution   07-01-2006  PDF |  ZIP  CCR
UFGS 33 63 23 Exterior Aboveground Steam Distribution   04-01-2006  PDF |  ZIP  CCR
UFGS 33 71 01 Overhead Transmission and Distribution   05-01-2019  PDF |  ZIP  CCR
UFGS 33 71 01.00 40 Overhead Transmission and Distribution   02-01-2023  PDF |  ZIP  CCR
UFGS 33 71 02 Underground Electrical Distribution   08-01-2021  PDF |  ZIP  CCR
UFGS 33 73 00.00 40 Utility Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 33 77 19.00 40 Medium-Voltage Switch   08-01-2016  PDF |  ZIP  CCR
UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses   08-01-2023  PDF |  ZIP  CCR
UFGS 33 82 00 Telecommunications Outside Plant (OSP)   04-01-2006  PDF |  ZIP  CCR
UFGS 34 11 00 Railroad Track and Accessories   04-01-2008  PDF |  ZIP  CCR
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method   08-01-2018  PDF |  ZIP  CCR
UFGS 34 71 13.16 Vehicle Crash Barriers   02-01-2015  PDF |  ZIP  CCR
UFGS 34 73 13 Aircraft Tiedowns   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 16 Airfield Grounding   11-01-2019  PDF |  ZIP  CCR
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls   02-01-2022  PDF |  ZIP  CCR
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams   08-01-2020  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2021  PDF |  ZIP  CCR
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures   08-01-2020  PDF |  ZIP  CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 14 Stoplogs   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures   08-01-2018  PDF |  ZIP  CCR
UFGS 35 20 16.33 Hydraulic Miter Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.39 Hydraulic Sector Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.54 Slide Gates and Actuators   05-01-2021  PDF |  ZIP  CCR
UFGS 35 20 16.59 Closure Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 20 Electrical Equipment for Gate Hoist   05-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23 Dredging   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures   01-01-2008  PDF |  ZIP  CCR
UFGS 35 31 19.20 Articulating Concrete Block Revetments   01-01-2008  PDF |  ZIP  CCR
UFGS 35 41 00 Levee Construction   11-01-2018  PDF |  ZIP  CCR
UFGS 35 42 34 Reinforced Soil Slope   08-01-2020  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   05-01-2021  PDF |  ZIP  CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps   05-01-2022  PDF |  ZIP  CCR
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type   11-01-2020  PDF |  ZIP  CCR

Pages