Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated May 18, 2022; Posted May 26, 2022

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

SpecsIntact version 4.5.0 and above incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for UFGS: These templates are provided to assist the user in creating a new section and available in SpecsIntact.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort ascending View CCR
UFGS MASTER   05-18-2022  ZIP
Division 06 - Wood, Plastics and Composites   05-01-2022  ZIP
Division 31 - Earthwork   05-01-2022  ZIP
Division 07 - Thermal and Moisture Protection   05-01-2022  ZIP
UFGS 13 48 73 Seismic Control For Miscellaneous Equipment   05-01-2022  PDF |  ZIP  CCR
Division 32 - Exterior Improvements   05-01-2022  ZIP
Division 08 - Openings   05-01-2022  ZIP
UFGS 09 97 13.15 Low VOC Polysulfide Interior Coating of Welded Steel Petroleum Fuel Tanks   05-01-2022  PDF |  ZIP  CCR
Division 33 - Utilities   05-01-2022  ZIP
Division 09 - Finishes   05-01-2022  ZIP
UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks   05-01-2022  PDF |  ZIP  CCR
Division 34 - Transportation   05-01-2022  ZIP
Division 10 - Specialties   05-01-2022  ZIP
UFGS 09 97 13.27 High Performance Coating for Steel Structures   05-01-2022  PDF |  ZIP  CCR
UFGS 01 31 20 Project Technical Data Management and Visualization   05-01-2022  PDF |  ZIP  CCR
Division 35 - Waterway and Marine Construction   05-01-2022  ZIP
Division 11 - Equipment   05-01-2022  ZIP
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures   05-01-2022  PDF |  ZIP  CCR
Division 40 - Process Integration   05-01-2022  ZIP
Division 12 - Furnishings   05-01-2022  ZIP
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors   05-01-2022  PDF |  ZIP  CCR
Division 41 - Material Processing and Handling Equipment   05-01-2022  ZIP
UFGS 23 01 30.41 HVAC System Cleaning   05-01-2022  PDF |  ZIP  CCR
Division 13 - Special Construction   05-01-2022  ZIP
Division 42 - Process Heating, Cooling and Drying Equipment   05-01-2022  ZIP
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment   05-01-2022  ZIP
UFGS 23 05 15 Common Piping for HVAC   05-01-2022  PDF |  ZIP  CCR
UFGS 35 20 20 Electrical Equipment for Gate Hoist   05-01-2022  PDF |  ZIP  CCR
Division 14 - Conveying Equipment   05-01-2022  ZIP
Division 44 - Pollution and Waste Control Equipment   05-01-2022  ZIP
UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment   05-01-2022  PDF |  ZIP  CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps   05-01-2022  PDF |  ZIP  CCR
Division 21 - Fire Suppression   05-01-2022  ZIP
Division 46 - Water and Wastewater Equipment   05-01-2022  ZIP
UFGS Forms, Graphics, and Tables   05-01-2022
Division 00 - Procurement and Contracting Requirements   05-01-2022  ZIP
Division 22 - Plumbing   05-01-2022  ZIP
Division 48 - Electrical Power Generation   05-01-2022  ZIP
Division 01 - General Requirements   05-01-2022  ZIP
Division 23 - Heating, Ventilating, and Air Conditioning   05-01-2022  ZIP
UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving   05-01-2022  PDF |  ZIP  CCR
UFGS Complete   05-01-2022  PDF
Division 02 - Existing Conditions   05-01-2022  ZIP
UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures   05-01-2022  PDF |  ZIP  CCR
Division 25 - Integrated Automation   05-01-2022  ZIP
UFGS 32 11 20 [Base Course for Rigid][ and ][Subbase] [Select-Material] [For Flexible Paving]   05-01-2022  PDF |  ZIP  CCR
UFGS Table of Contents   05-01-2022  PDF
Division 03 - Concrete   05-01-2022  ZIP
Division 26 - Electrical   05-01-2022  ZIP
UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving   05-01-2022  PDF |  ZIP  CCR
Division 04 - Masonry   05-01-2022  ZIP
Division 27 - Communications   05-01-2022  ZIP
UFGS Changes and Revisions   05-01-2022
Division 05 - Metals   05-01-2022  ZIP
Division 28 - Electronic Safety and Security   05-01-2022  ZIP
Unified Master Reference List (UMRL)   04-01-2022  PDF
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls   02-01-2022  PDF |  ZIP  CCR
UFGS 26 05 33 Dockside Power Connection Stations   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar   02-01-2022  PDF |  ZIP  CCR
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation   11-01-2021  PDF |  ZIP  CCR
UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems   11-01-2021  PDF |  ZIP  CCR
UFGS 08 34 16.10 Horizontal Rolling Steel Doors   11-01-2021  PDF |  ZIP  CCR
UFGS 08 34 49.00 20 Hemp Shielded Door   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.16 Extruded and Molded Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 26 11 13.00 20 Primary Unit Substation   11-01-2021  PDF |  ZIP  CCR
UFGS 26 11 16 Secondary Unit Substations   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 13 Chain Link Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 26 Wire Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 30.16 TV Inspection of Sewer Lines   11-01-2021  PDF |  ZIP  CCR
UFGS 31 23 00.00 Tunnel Excavation – Blasting   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 30.72 Relining Sewers   11-01-2021  PDF |  ZIP  CCR
UFGS 26 13 13 Metal-Clad Switchgear   11-01-2021  PDF |  ZIP  CCR
UFGS 33 40 00 Stormwater Utilities   11-01-2021  PDF |  ZIP  CCR
UFGS 26 13 14 Switchgear House   11-01-2021  PDF |  ZIP  CCR
UFGS 27 41 00 Audio-Visual Systems   11-01-2021  PDF |  ZIP  CCR
UFGS 27 51 23 Intercommunication System   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.17 Foam-Filled Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 26 08 00 Apparatus Inspection and Testing   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 08 34 16.20 Vertical Lift Fabric Doors   08-01-2021  PDF |  ZIP  CCR
UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures   08-01-2021  PDF |  ZIP  CCR
UFGS 23 23 00 Refrigerant Piping   08-01-2021  PDF |  ZIP  CCR
UFGS 33 71 02 Underground Electrical Distribution   08-01-2021  PDF |  ZIP  CCR
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System   08-01-2021  PDF |  ZIP  CCR
UFGS 23 76 00 Evaporative Cooling Systems   08-01-2021  PDF |  ZIP  CCR
UFGS 26 35 44 270 VDC Solid State Converter   08-01-2021  PDF |  ZIP  CCR
UFGS 26 24 13 Switchboards   08-01-2021  PDF |  ZIP  CCR
UFGS 23 54 19 Building Heating Systems, Warm Air   08-01-2021  PDF |  ZIP  CCR
UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter   08-01-2021  PDF |  ZIP  CCR
UFGS 26 28 01.00 10 Coordinated Power System Protection   08-01-2021  PDF |  ZIP  CCR
UFGS 26 56 00 Exterior Lighting   08-01-2021  PDF |  SEC  CCR
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures   05-01-2021  PDF |  ZIP  CCR
UFGS 46 61 00 Filtration Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 66 56 Open-Channel Disinfection Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 13 Galvanic (Sacrificial) Anode Cathodic Protection (GACP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 25 08 10 Utility Monitoring and Control System Testing   05-01-2021  PDF |  ZIP  CCR
UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 15 Cathodic Protection System for the Interior of Steel Water Tanks   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 17 Impressed Current Cathodic Protection (ICCP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 35 20 16.54 Slide Gates and Actuators   05-01-2021  PDF |  ZIP  CCR
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment   05-01-2021  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2021  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   05-01-2021  PDF |  ZIP  CCR
UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear   05-01-2021  PDF |  ZIP  CCR
UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder   05-01-2021  PDF |  ZIP  CCR
UFGS 26 27 29 Marina Electrical Work   05-01-2021  PDF |  ZIP  CCR
UFGS 46 24 16 Comminutors   05-01-2021  PDF |  ZIP  CCR
UFGS 46 51 00.00 10 Air and Gas Diffusion System   05-01-2021  PDF |  ZIP  CCR
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System   05-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.13 Geomembrane Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 09 90 00 Paints and Coatings   02-01-2021  PDF |  ZIP  CCR
UFGS 31 36 00 Gabions   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.16 Clay Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 31 62 23.13 Concrete-Filled Steel Piles   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2021  PDF |  ZIP  CCR
UFGS 02 66 16 Test Fill   02-01-2021  PDF |  ZIP  CCR
UFGS 32 84 23 Underground Sprinklers   02-01-2021  PDF |  ZIP  CCR