Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated November 16, 2021; Posted November 30, 2021

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.

As of June 2008 :Updated UFGS will be posted quarterly in February, May, August and November.

As of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. The user should follow this order of precedence in selecting UFGS sections:

  1. Regional UFGS specific to their Agency
  2. UFGS identified as specific to their Agency
  3. Unified UFGS if one is available
  4. UFGS identified as specific to another DoD Agency (for DoD projects only)
  5. UFGS from another agency.

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 08 51 69.10 Aluminum Storm Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 60 Interior Fire Alarm System, Non-Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly   08-01-2020  PDF |  ZIP  CCR
UFGS 13 34 19 Metal Building Systems   08-01-2020  PDF |  ZIP  CCR
UFGS 08 52 00 Wood Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 66 Interior Fire Alarm And Mass Notification System, Non-Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 23 Dredging   08-01-2020  PDF |  ZIP  CCR
UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling   08-01-2020  PDF |  ZIP  CCR
UFGS 08 53 00 Plastic Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 70 Interior Fire Alarm System, Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 10 21 13 Toilet Compartments   08-01-2020  PDF |  ZIP  CCR
UFGS 35 42 34 Reinforced Soil Slope   08-01-2020  PDF |  ZIP  CCR
UFGS 09 51 00 Acoustical Ceilings   08-01-2020  PDF |  ZIP  CCR
UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels]   08-01-2020  PDF |  ZIP  CCR
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment   08-01-2020  PDF |  ZIP  CCR
UFGS 10 22 39 Folding Panel Partitions   08-01-2020  PDF |  ZIP  CCR
UFGS 48 06 15 Turbine Oil   08-01-2020  PDF |  ZIP  CCR
UFGS 10 11 00 Visual Display Units   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers   08-01-2020  PDF |  ZIP  CCR
UFGS 10 26 00 Wall and Door Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures   08-01-2020  PDF |  ZIP  CCR
UFGS 10 14 00.20 Interior Signage   08-01-2020  PDF |  ZIP  CCR
UFGS 08 56 53 Blast Resistant Tempered Glass Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 10 28 13 Toilet Accessories   08-01-2020  PDF |  ZIP  CCR
UFGS 12 24 13 Roller Window Shades   08-01-2020  PDF |  ZIP  CCR
UFGS 12 61 13 Upholstered Audience Seating   08-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.24 Concrete Cylinder Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 36.26 Polymer Concrete Micro-Overlay (PCMO) For Fuel And Abrasion Resistant Wearing Surfaces   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.26 Pressure-Injected Footings   11-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.17 Roller Compacted Concrete Paving   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 16.16 Steel H-Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 19 Timber Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 01 20 00 Price and Payment Procedures   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 15.13 Asphalt Paving for Airfields   11-01-2020  PDF |  ZIP  CCR
UFGS 31 63 16 Augered Cast-In-Place Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 23 81 23 Computer Room Air Conditioning Units   11-01-2020  PDF |  ZIP  CCR
UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC   11-01-2020  PDF |  ZIP  CCR
UFGS 33 16 15 Water Storage Steel Tanks   11-01-2020  PDF |  ZIP  CCR
UFGS 31 68 13 Soil and Rock Anchors   11-01-2020  PDF |  ZIP  CCR
UFGS 25 08 11.00 20 Risk Management Framework for Facility-Related Control Systems   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 16.13 Steel Pipe Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 50 Densified Aggregate Piers   11-01-2020  PDF |  ZIP  CCR
UFGS 31 63 26.60 [Grouted] Helical Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar   11-01-2020  PDF |  ZIP  CCR
UFGS 13 49 10 X-Ray Shielding   11-01-2020  PDF |  ZIP  CCR
UFGS 01 30 00 Administrative Requirements   11-01-2020  PDF |  ZIP  CCR
UFGS 13 49 21 Radio Frequency (RF) Shielding: Magnetic Resonance Imaging (MRI)   11-01-2020  PDF |  ZIP  CCR
UFGS 01 35 13 Special Project Procedures   11-01-2020  PDF |  ZIP  CCR
UFGS 27 21 10.00 40 Fiber Optic Data Transmission System   11-01-2020  PDF |  ZIP  CCR
UFGS 26 05 00.00 40 Common Work Results for Electrical   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 23 Piling: Composite, Wood And Cast In-Place Concrete   11-01-2020  PDF |  ZIP  CCR
UFGS 01 35 26 Governmental Safety Requirements   11-01-2020  PDF |  ZIP  CCR
UFGS 27 52 24 Nurse Call System   11-01-2020  PDF |  ZIP  CCR
UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 16.16 Road-Mix Asphalt Paving   11-01-2020  PDF |  ZIP  CCR
UFGS 01 45 35 Special Inspections   11-01-2020  PDF |  ZIP  CCR
UFGS 31 41 16 Metal Sheet Piling   11-01-2020  PDF |  ZIP  CCR
UFGS 31 62 13.20 Precast/Prestressed Concrete Piles   11-01-2020  PDF |  ZIP  CCR
UFGS 32 12 17.19 Fuel Resistant Asphalt Paving For Airfields - Surface Course   11-01-2020  PDF |  ZIP  CCR
UFGS 01 50 00 Temporary Construction Facilities and Controls   11-01-2020  PDF |  ZIP  CCR
UFGS 02 56 13.16 Clay Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 09 90 00 Paints and Coatings   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 01 33 29 Sustainability Requirements and Reporting   02-01-2021  PDF |  ZIP  CCR
UFGS 09 97 13.27 High Performance Coating for Steel Structures   02-01-2021  PDF |  ZIP  CCR
UFGS 26 27 14.00 20 Electricity Metering   02-01-2021  PDF |  ZIP  CCR
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover   02-01-2021  PDF |  ZIP  CCR
UFGS 02 66 16 Test Fill   02-01-2021  PDF |  ZIP  CCR
UFGS 31 32 19.16 Geotextile Soil Stabilization   02-01-2021  PDF |  ZIP  CCR
UFGS 31 32 19.13 Geogrid Soil Stabilization   02-01-2021  PDF |  ZIP  CCR
UFGS 32 84 23 Underground Sprinklers   02-01-2021  PDF |  ZIP  CCR
UFGS 31 35 19.13 Geogrid Slope Protection   02-01-2021  PDF |  ZIP  CCR
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III)   02-01-2021  PDF |  ZIP  CCR
UFGS 31 05 19.13 Geotextiles for Earthwork   02-01-2021  PDF |  ZIP  CCR
UFGS 31 10 00 Site Clearing   02-01-2021  PDF |  ZIP  CCR
UFGS 31 43 13.13 Concrete Pressure Grouting   02-01-2021  PDF |  ZIP  CCR
UFGS 31 21 00 Off-Gassing Mitigation   02-01-2021  PDF |  ZIP  CCR
UFGS 31 56 13.13 Soil-Bentonite Slurry Walls   02-01-2021  PDF |  ZIP  CCR
UFGS 31 36 00 Gabions   02-01-2021  PDF |  ZIP  CCR
UFGS 02 32 13 Subsurface Drilling and Sampling   02-01-2021  PDF |  ZIP  CCR
UFGS 31 66 10 Rock Foundation Preparation   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 31 62 23.13 Concrete-Filled Steel Piles   02-01-2021  PDF |  ZIP  CCR
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption   02-01-2021  PDF |  ZIP  CCR
UFGS 31 73 19 Tunnel and Shaft Grouting   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.13 Bioremediation Using Landfarming   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 01 Underwater Blasting   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 06.00 Blasting - Surface   02-01-2021  PDF |  ZIP  CCR
UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems   02-01-2021  PDF |  ZIP  CCR
UFGS 02 51 19 Solidification and Stabilization Decontamination   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2021  PDF |  ZIP  CCR
UFGS 01 91 00.15 20 Total Building Commissioning   02-01-2021  PDF |  ZIP  CCR
UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System   02-01-2021  PDF |  ZIP  CCR
UFGS 08 71 63.10 Electrical Locking Control for Brigs   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.13 Geomembrane Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 05 05 20.00 27 Post-Installed Concrete and Masonry Anchors   02-01-2021  PDF |  ZIP  CCR
UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   05-01-2021  PDF |  ZIP  CCR
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 13 Galvanic (Sacrificial) Anode Cathodic Protection (GACP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 46 24 16 Comminutors   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 15 Cathodic Protection System for the Interior of Steel Water Tanks   05-01-2021  PDF |  ZIP  CCR
UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear   05-01-2021  PDF |  ZIP  CCR
UFGS 46 51 00.00 10 Air and Gas Diffusion System   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 17 Impressed Current Cathodic Protection (ICCP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 26 27 29 Marina Electrical Work   05-01-2021  PDF |  ZIP  CCR
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System   05-01-2021  PDF |  ZIP  CCR
UFGS 35 20 16.54 Slide Gates and Actuators   05-01-2021  PDF |  ZIP  CCR
UFGS 25 08 10 Utility Monitoring and Control System Testing   05-01-2021  PDF |  ZIP  CCR
UFGS 46 61 00 Filtration Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment   05-01-2021  PDF |  ZIP  CCR
UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 46 66 56 Open-Channel Disinfection Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures   05-01-2021  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2021  PDF |  ZIP  CCR
UFGS 08 34 16.20 Vertical Lift Fabric Doors   08-01-2021  PDF |  ZIP  CCR
UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures   08-01-2021  PDF |  ZIP  CCR
UFGS 23 54 19 Building Heating Systems, Warm Air   08-01-2021  PDF |  ZIP  CCR
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System   08-01-2021  PDF |  ZIP  CCR
UFGS 26 24 13 Switchboards   08-01-2021  PDF |  ZIP  CCR

Pages