Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated May 18, 2022; Posted May 26, 2022

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master complies with UFC 1-300-02. SpecsIntact supports the UFGS format. SpecsIntact can still open Masters or Jobs created with older versions of the UFGS format.

Updated UFGS are posted quarterly in February, May, August, and November.

SpecsIntact version 4.5.0 and above incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, "30" by AFCEC, and "40" by NASA. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for UFGS: These templates are provided to assist the user in creating a new section and available in SpecsIntact.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request (CCR). To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices   05-01-2019  PDF |  ZIP  CCR
UFGS 08 81 00 Glazing   05-01-2019  PDF |  ZIP  CCR
UFGS 01 91 00.15 10 Total Building Commissioning   05-01-2019  PDF |  ZIP  CCR
UFGS 26 33 53 Static Uninterruptible Power Supply (UPS)   05-01-2019  PDF |  ZIP  CCR
UFGS 08 44 00 Curtain Wall and Glazed Assemblies   05-01-2019  PDF |  ZIP  CCR
UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers   05-01-2019  PDF |  ZIP  CCR
UFGS 33 71 01 Overhead Transmission and Distribution   05-01-2019  PDF |  ZIP  CCR
UFGS 26 24 19.00 40 Motor-Control Centers   05-01-2019  PDF |  ZIP  CCR
UFGS 08 51 13 Aluminum Windows   05-01-2019  PDF |  ZIP  CCR
UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems   08-01-2019  PDF |  ZIP  CCR
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines   08-01-2019  PDF |  ZIP  CCR
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements   08-01-2019  PDF |  ZIP  CCR
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant)   08-01-2019  PDF |  ZIP  CCR
UFGS 07 27 10.00 10 Building Air Barrier System   08-01-2019  PDF |  ZIP  CCR
UFGS 26 09 23.00 40 Lighting Control Devices   08-01-2019  PDF |  ZIP  CCR
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters   08-01-2019  PDF |  ZIP  CCR
UFGS 26 20 00 Interior Distribution System   08-01-2019  PDF |  ZIP  CCR
UFGS 01 58 00 Project Identification   08-01-2019  PDF |  ZIP  CCR
UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness   08-01-2019  PDF |  ZIP  CCR
UFGS 26 24 16.00 40 Panelboards   08-01-2019  PDF |  ZIP  CCR
UFGS 26 35 33.00 40 Power Factor Correction Equipment   08-01-2019  PDF |  ZIP  CCR
UFGS 32 11 36.13 Lean Concrete Base Course   11-01-2019  PDF |  ZIP  CCR
UFGS 33 05 23.13 Utility Horizontal Directional Drilling   11-01-2019  PDF |  ZIP  CCR
UFGS 02 42 51 Carpet Removal and Reclamation   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 13 Aircraft Tiedowns   11-01-2019  PDF |  ZIP  CCR
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations   11-01-2019  PDF |  ZIP  CCR
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running   11-01-2019  PDF |  ZIP  CCR
UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames   11-01-2019  PDF |  ZIP  CCR
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.)   11-01-2019  PDF |  ZIP  CCR
UFGS 08 34 73 Sound Control Door Assemblies   11-01-2019  PDF |  ZIP  CCR
UFGS 05 14 00.13 Welding Structural Aluminum Framing   11-01-2019  PDF |  ZIP  CCR
UFGS 31 63 29 Drilled Concrete Piers and Shafts   11-01-2019  PDF |  ZIP  CCR
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement   11-01-2019  PDF |  ZIP  CCR
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers   11-01-2019  PDF |  ZIP  CCR
UFGS 09 23 82 Fireproof Gypsum Plastering   11-01-2019  PDF |  ZIP  CCR
UFGS 32 11 13.13 Lime Treated Subgrade   11-01-2019  PDF |  ZIP  CCR
UFGS 09 67 23.13 Standard Resinous Flooring   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses   11-01-2019  PDF |  ZIP  CCR
UFGS 10 44 16 Fire Extinguishers   11-01-2019  PDF |  ZIP  CCR
UFGS 09 97 13.00 40 Steel Coatings   11-01-2019  PDF |  ZIP  CCR
UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant   11-01-2019  PDF |  ZIP  CCR
UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 32 12 16.19 Cold-Mix Asphalt Paving   11-01-2019  PDF |  ZIP  CCR
UFGS 34 73 16 Airfield Grounding   11-01-2019  PDF |  ZIP  CCR
UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall   02-01-2020  PDF |  ZIP  CCR
UFGS 33 01 50.31 Leak Detection For Fueling Systems   02-01-2020  PDF |  ZIP  CCR
UFGS 46 43 21 Circular Clarifier Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units   02-01-2020  PDF |  ZIP  CCR
UFGS 46 23 00 Grit Removal and Handling Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems   02-01-2020  PDF |  ZIP CCR
UFGS 46 07 53 Packaged Wastewater Treatment Equipment   02-01-2020  PDF |  ZIP  CCR
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running   02-01-2020  PDF |  ZIP  CCR
UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts   02-01-2020  PDF |  ZIP  CCR
UFGS 09 97 02 Painting: Hydraulic Structures   02-01-2020  PDF |  ZIP  CCR
UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch   05-01-2020  PDF |  ZIP  CCR
UFGS 11 71 00 Sterilizers and Associated Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 11 82 19 Packaged Incinerators   05-01-2020  PDF |  ZIP  CCR
UFGS 27 53 19.13 First Responder Distributed Antennae Systems (DAS)   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 13.16 Bituminous-Stabilized Subgrade   05-01-2020  PDF |  ZIP  CCR
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 26.19 Bituminous-Stabilized Base and Subbase Courses   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs)   05-01-2020  PDF |  ZIP  CCR
UFGS 32 11 33.13 Portland Cement-Stabilized Base Courses   05-01-2020  PDF |  ZIP  CCR
UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 32 13 43 Pervious Concrete Paving   05-01-2020  PDF |  ZIP  CCR
UFGS 40 60 00 Process Control   05-01-2020  PDF |  ZIP  CCR
UFGS 26 51 00 Interior Lighting   05-01-2020  PDF |  ZIP  CCR
UFGS 33 46 13 Foundation Drainage   05-01-2020  PDF |  ZIP  CCR
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps   05-01-2020  PDF |  ZIP  CCR
UFGS 33 56 53 Compressed Gases Storage Tanks   05-01-2020  PDF |  ZIP  CCR
UFGS 23 11 20 Facility Gas Piping   05-01-2020  PDF |  ZIP  CCR
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units   05-01-2020  PDF |  ZIP  CCR
UFGS 11 74 00 Dental Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 41 22 23.19 Monorail Hoists   05-01-2020  PDF |  ZIP  CCR
UFGS 23 30 00 HVAC Air Distribution   05-01-2020  PDF |  ZIP  CCR
UFGS 44 13 51 Thermal Oxidation Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 41 24 26 Hydraulic Power Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 27 05 13.43 Television Distribution System   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.00 10 Heat Recovery Boilers   05-01-2020  PDF |  ZIP  CCR
UFGS 32 01 17.62 Paving Fabric Interlayer   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System   05-01-2020  PDF |  ZIP  CCR
UFGS 27 51 16 Public Address Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired   05-01-2020  PDF |  ZIP  CCR
UFGS 26 56 19.00 40 Roadway Lighting   05-01-2020  PDF |  SEC  CCR
UFGS 26 05 13.00 40 Medium-Voltage Cables   05-01-2020  PDF |  ZIP  CCR
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems   05-01-2020  PDF |  ZIP  CCR
UFGS 13 17 43 Hydrotherapy Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 26 56 36.00 40 Flood Lighting   05-01-2020  PDF |  SEC  CCR
UFGS 23 80 20.00 10 Gas-Fired Heating Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 11 70 00 General Requirements for Medical and Dental Equipment   05-01-2020  PDF |  ZIP  CCR
UFGS 22 00 70 Plumbing for Healthcare Facilities   05-01-2020  PDF |  ZIP  CCR
UFGS 26 32 15.00 Engine-Generator Set Stationary 15-2500 Kw, with Auxiliaries   05-01-2020  PDF |  ZIP  CCR
UFGS 11 72 13 Medical Equipment, Miscellaneous   05-01-2020  PDF |  ZIP  CCR
UFGS 08 52 00 Wood Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 28 31 70 Interior Fire Alarm System, Addressable   08-01-2020  PDF |  ZIP  CCR
UFGS 09 51 00 Acoustical Ceilings   08-01-2020  PDF |  ZIP  CCR
UFGS 08 53 00 Plastic Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment   08-01-2020  PDF |  ZIP  CCR
UFGS 10 21 13 Toilet Compartments   08-01-2020  PDF |  ZIP  CCR
UFGS 10 11 00 Visual Display Units   08-01-2020  PDF |  ZIP  CCR
UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels]   08-01-2020  PDF |  ZIP  CCR
UFGS 10 22 39 Folding Panel Partitions   08-01-2020  PDF |  ZIP  CCR
UFGS 10 14 00.20 Interior Signage   08-01-2020  PDF |  ZIP  CCR
UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers   08-01-2020  PDF |  ZIP  CCR
UFGS 10 26 00 Wall and Door Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 10 28 13 Toilet Accessories   08-01-2020  PDF |  ZIP  CCR
UFGS 22 33 30.00 10 Solar Water Heating Equipment   08-01-2020  PDF |  ZIP  CCR
UFGS 12 24 13 Roller Window Shades   08-01-2020  PDF |  ZIP  CCR
UFGS 12 61 13 Upholstered Audience Seating   08-01-2020  PDF |  ZIP  CCR
UFGS 06 61 16 Solid Surfacing Fabrications   08-01-2020  PDF |  ZIP  CCR
UFGS 08 11 13 Steel Doors and Frames   08-01-2020  PDF |  ZIP  CCR
UFGS 08 56 53 Blast Resistant Tempered Glass Windows   08-01-2020  PDF |  ZIP  CCR
UFGS 08 11 73 Sliding Fire Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams   08-01-2020  PDF |  ZIP  CCR
UFGS 08 32 13 Aluminum Sliding Glass Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly   08-01-2020  PDF |  ZIP  CCR
UFGS 08 33 23 Overhead Coiling Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 16 Dry Pipe Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR
UFGS 35 20 23 Dredging   08-01-2020  PDF |  ZIP  CCR
UFGS 08 36 13 Sectional Overhead Doors   08-01-2020  PDF |  ZIP  CCR
UFGS 21 13 18 Preaction Sprinkler Systems, Fire Protection   08-01-2020  PDF |  ZIP  CCR

Pages