Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

UFGS Master Updated August 13, 2020; Posted August 20, 2020

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.

As of June 2008 :Updated UFGS will be posted quarterly in February, May, August and November.

As of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the SpecsIntact website.

For Specsintact Technical Support: 321-867-8800  |   E-mail  |   specsintact.ksc.nasa.gov

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. The user should follow this order of precedence in selecting UFGS sections:

  1. Regional UFGS specific to their Agency
  2. UFGS identified as specific to their Agency
  3. Unified UFGS if one is available
  4. UFGS identified as specific to another DoD Agency (for DoD projects only)
  5. UFGS from another agency.

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below. If a CCR does not fit cleanly into an existing section, submit a CCR to the section most closely related to the CCR. CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal or after a project award. Questions or interpretations pertaining to these documents or situation should be referred to the Contracting Officer.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.

These documents are available in the following formats:   Adobe Acrobat (PDF)  |   SpecsIntact (SEC) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

Title Datesort descending View CCR
UFGS 03 52 00 Lightweight Concrete Roof Insulation   08-01-2011  PDF |  ZIP  CCR
UFGS 07 11 13 Bituminous Dampproofing   08-01-2011  PDF |  ZIP  CCR
UFGS 03 52 16.19 Lightweight Insulation Concrete Overlay   08-01-2011  PDF |  ZIP  CCR
UFGS 31 62 13.24 Concrete Cylinder Piles   08-01-2011  PDF |  ZIP  CCR
UFGS 08 56 46.10 20 Radio Frequency Shielded Enclosures, Demountable Type   08-01-2011  PDF |  ZIP  CCR
UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type   08-01-2011  PDF |  ZIP  CCR
UFGS 12 35 30.23 20 Bathroom Casework   08-01-2011  PDF |  ZIP  CCR
UFGS 31 62 16.16 Steel H Piles   11-01-2011  PDF |  ZIP  CCR
UFGS 01 45 00.00 20 Quality Control   11-01-2011  PDF |  ZIP  CCR
UFGS 01 14 00 Work Restrictions   11-01-2011  PDF |  ZIP  CCR
UFGS 01 20 00.00 20 Price and Payment Procedures   11-01-2011  PDF |  ZIP  CCR
UFGS 07 21 16 Mineral Fiber Blanket Insulation   11-01-2011  PDF |  ZIP  CCR
UFGS 01 35 13 Special Project Procedures   11-01-2011  PDF |  ZIP  CCR
UFGS 07 14 00 Fluid-Applied Waterproofing   02-01-2012  PDF |  ZIP  CCR
UFGS 07 51 13 Built-Up Asphalt Roofing   05-01-2012  PDF |  ZIP  CCR
UFGS 07 52 00 Modified Bituminous Membrane Roofing   05-01-2012  PDF |  ZIP  CCR
UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing   05-01-2012  PDF |  ZIP  CCR
UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks)   02-01-2013  PDF |  ZIP  CCR
UFGS 23 07 00 Thermal Insulation for Mechanical Systems   02-01-2013  PDF |  ZIP  CCR
UFGS 07 54 19 Polyvinyl Chloride Roofing   02-01-2013  PDF |  ZIP  CCR
UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels   02-01-2013  PDF |  ZIP  CCR
UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications   05-01-2013  PDF |  ZIP  CCR
UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems   08-01-2013  PDF |  ZIP  CCR
UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear   08-01-2013  PDF |  ZIP  CCR
UFGS 26 41 00 Lightning Protection System   11-01-2013  PDF |  ZIP  CCR
UFGS 00 22 13.00 20 Supplementary Instructions to Offerors   02-01-2014  PDF |  ZIP  CCR
UFGS 23 05 15 Common Piping for HVAC   02-01-2014  PDF |  ZIP  CCR
UFGS 01 42 15 Metric Measurements   02-01-2014  PDF |  ZIP  CCR
UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete   05-01-2014  PDF |  ZIP  CCR
UFGS 08 34 16.20 Vertical Lift Fabric Doors   05-01-2014  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2014  PDF |  ZIP  CCR
UFGS 08 88 58 Air Traffic Control Tower Cab Glass   05-01-2014  PDF |  ZIP  CCR
UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear   11-01-2014  PDF |  ZIP  CCR
UFGS 12 31 00 Manufactured Metal Casework   11-01-2014  PDF |  ZIP  CCR
UFGS 27 13 23.00 40 Communications Optical Backbone Cabling   11-01-2014  PDF |  ZIP  CCR
UFGS 09 96 00 High-Performance Coatings   11-01-2014  PDF |  ZIP  CCR
UFGS 33 47 13 Pond and Reservoir Liners   11-01-2014  PDF |  ZIP  CCR
UFGS 26 55 53.00 40 Security Lighting   11-01-2014  PDF |  ZIP  CCR
UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers   11-01-2014  PDF |  ZIP  CCR
UFGS 26 56 13.00 40 Lighting Poles and Standards   11-01-2014  PDF |  SEC  CCR
UFGS 33 71 01.00 40 Overhead Transmission and Distribution   11-01-2014  PDF |  ZIP  CCR
UFGS 33 75 00.00 40 Switchgear and Protection Devices   11-01-2014  PDF |  ZIP  CCR
UFGS 01 32 01.00 10 Project Schedule   02-01-2015  PDF |  ZIP  CCR
UFGS 23 01 30.41 HVAC System Cleaning   02-01-2015  PDF |  ZIP  CCR
UFGS 34 71 13.16 Vehicle Crash Barriers   02-01-2015  PDF |  ZIP  CCR
UFGS 09 97 13.15 Low VOC Polysulfide Interior Coating of Welded Steel Petroleum Fuel Tanks   02-01-2015  PDF |  ZIP  CCR
UFGS 10 14 53 Traffic Signage   02-01-2015  PDF |  ZIP  CCR
UFGS 01 78 24.00 20 Facility Electronic Operation and Maintenance Support Information (eOMSI)   02-01-2015  PDF |  ZIP  CCR
UFGS 33 71 02 Underground Electrical Distribution   02-01-2015  PDF |  ZIP  CCR
UFGS 05 40 00 Cold-Formed Metal Framing   05-01-2015  PDF |  ZIP  CCR
UFGS 33 56 19 Fuel Impermeable Liner System   05-01-2015  PDF |  ZIP  CCR
UFGS 26 23 00 Low Voltage Switchgear   05-01-2015  PDF |  ZIP  CCR
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors   05-01-2015  PDF |  ZIP  CCR
UFGS 26 24 13 Switchboards   05-01-2015  PDF |  ZIP  CCR
UFGS 23 37 13.00 40 Diffusers, Registers, and Grills   05-01-2015  PDF |  ZIP  CCR
UFGS 26 31 00 Solar Photovoltaic (PV) Components   05-01-2015  PDF |  ZIP  CCR
UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output)   05-01-2015  PDF |  ZIP  CCR
UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output)   05-01-2015  PDF |  ZIP  CCR
UFGS 05 21 00 Steel Joist Framing   05-01-2015  PDF |  ZIP  CCR
UFGS 05 30 00 Steel Decks   05-01-2015  PDF |  ZIP  CCR
UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping   08-01-2015  PDF |  ZIP  CCR
UFGS 23 22 23.00 40 Steam Condensate Pumps   08-01-2015  PDF |  ZIP  CCR
UFGS 01 22 00.00 10 Price and Payment Procedures   08-01-2015  PDF |  ZIP  CCR
UFGS 01 11 00 Summary of Work   08-01-2015  PDF |  ZIP  CCR
UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment   08-01-2015  PDF |  ZIP  CCR
UFGS 01 78 23 Operation and Maintenance Data   08-01-2015  PDF |  ZIP  CCR
UFGS 01 30 00 Administrative Requirements   08-01-2015  PDF |  ZIP  CCR
UFGS 33 05 23 Trenchless Utility Installation   08-01-2015  PDF |  ZIP  CCR
UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites   08-01-2015  PDF |  ZIP  CCR
UFGS 01 35 26 Governmental Safety Requirements   11-01-2015  PDF |  ZIP  CCR
UFGS 01 57 19 Temporary Environmental Controls   11-01-2015  PDF |  ZIP  CCR
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls   11-01-2015  PDF |  ZIP  CCR
UFGS 04 01 20.73 Masonry Strengthening Using FRP Bars   11-01-2015  PDF |  ZIP  CCR
UFGS 26 53 00.00 40 Exit Signs   11-01-2015  PDF |  ZIP  CCR
UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites   11-01-2015  PDF |  ZIP  CCR
UFGS 23 09 13 Instrumentation and Control Devices for HVAC   11-01-2015  PDF |  ZIP  CCR
UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC   11-01-2015  PDF |  ZIP  CCR
UFGS 04 20 00 Unit Masonry   11-01-2015  PDF |  ZIP  CCR
UFGS 04 23 00 Glass Unit Masonry   11-01-2015  PDF |  ZIP  CCR
UFGS 23 09 93 Sequences of Operation for HVAC Control   11-01-2015  PDF |  SEC  CCR
UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC   11-01-2015  PDF |  ZIP  CCR
UFGS 09 69 13 Rigid Grid Access Flooring   11-01-2015  PDF |  ZIP  CCR
UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites   11-01-2015  PDF |  ZIP  CCR
UFGS 09 69 19 Stringerless Access Flooring   11-01-2015  PDF |  ZIP  CCR
UFGS 22 00 00 Plumbing, General Purpose   11-01-2015  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   02-01-2016  PDF |  ZIP  CCR
UFGS 08 71 00 Door Hardware   02-01-2016  PDF |  ZIP  CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps   02-01-2016  PDF |  ZIP  CCR
UFGS 07 12 00 Built-Up Bituminous Waterproofing   02-01-2016  PDF |  ZIP  CCR
UFGS 27 21 00.00 40 Intercommunication System   02-01-2016  PDF |  ZIP  CCR
UFGS 07 13 53 Elastomeric Sheet Waterproofing   02-01-2016  PDF |  ZIP  CCR
UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type)   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 05 51 33 Metal Ladders   02-01-2016  PDF |  ZIP  CCR
UFGS 07 17 00 Bentonite Waterproofing   02-01-2016  PDF |  ZIP  CCR
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes   02-01-2016  PDF |  ZIP  CCR
UFGS 09 97 13.26 Coating of Steel Waterfront Structures, Zero VOC, (SZC) Splash Zone Coating   02-01-2016  PDF |  ZIP  CCR
UFGS 07 21 13 Board and Block Insulation   02-01-2016  PDF |  ZIP  CCR
UFGS 23 41 13.00 40 Panel Filters   02-01-2016  PDF |  ZIP  CCR
UFGS 07 22 00 Roof and Deck Insulation   02-01-2016  PDF |  ZIP  CCR
UFGS 31 31 16.19 Termite Control Barriers   02-01-2016  PDF |  ZIP  CCR
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution   02-01-2016  PDF |  ZIP  CCR
UFGS 23 44 00.00 10 Chemical, Biological, and Radiological (CBR) Air Filtration System   02-01-2016  PDF |  ZIP  CCR
UFGS 23 50 52.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries   02-01-2016  PDF |  ZIP  CCR
UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats   02-01-2016  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2016  PDF |  ZIP  CCR
UFGS 23 82 00.00 20 Terminal Heating Units   02-01-2016  PDF |  ZIP  CCR
UFGS 03 51 13 Cementitious Wood Fiber Decks   05-01-2016  PDF |  ZIP  CCR
UFGS 03 23 00 Stressed Tendon Reinforcing   05-01-2016  PDF |  ZIP  CCR
UFGS 23 82 16.00 40 Air Coils   05-01-2016  PDF |  ZIP  CCR
UFGS 01 33 16.00 10 Design Data (Design After Award)   05-01-2016  PDF |  ZIP  CCR
UFGS 27 21 10.00 40 Fiber Optic Data Transmission System   05-01-2016  PDF |  ZIP  CCR
UFGS 23 31 13.00 40 Metal Ducts   05-01-2016  PDF |  ZIP  CCR
UFGS 33 01 30.72 Relining Sewers   05-01-2016  PDF |  ZIP  CCR
UFGS 28 08 10 Electronic Security System Acceptance Testing   05-01-2016  PDF |  ZIP  CCR
UFGS 26 05 19.10 10 Insulated Wire and Cable   05-01-2016  PDF |  ZIP  CCR
UFGS 28 10 05 Electronic Security Systems (ESS)   05-01-2016  PDF |  ZIP  CCR
UFGS 23 36 00.00 40 Air Terminal Units   05-01-2016  PDF |  ZIP  CCR
UFGS 14 21 13 Electric Traction Freight Elevators   05-01-2016  PDF |  ZIP  CCR
UFGS 14 21 23 Electric Traction Passenger Elevators   05-01-2016  PDF |  ZIP  CCR
UFGS 40 17 30.00 40 Welding General Piping   05-01-2016  PDF |  ZIP  CCR
UFGS 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction   05-01-2016  PDF |  ZIP  CCR
UFGS 14 24 13 Hydraulic Freight Elevators   05-01-2016  PDF |  ZIP  CCR
UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems   05-01-2016  PDF |  ZIP  CCR
UFGS 14 24 23 Hydraulic Passenger Elevators   05-01-2016  PDF |  ZIP  CCR