UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2019 A UFGS 07 27 10.00 10 Building Air Barrier System R Complete review and update.
Aug-2019 N UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks C 2 In response to CCR 4193, the NOTE under paragraph "SURFACE PREPARATION" (3.8) has been removed as the instructions refer to SSPC SP 12 which has been withdrawn.
Aug-2019 A UFGS 23 52 00 Heating Boilers C 4 Revised paragraph 2.12.14 in response to CCR 7344.
Aug-2019 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 09 23.00 40 Lighting Control Devices R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 N UFGS 26 20 00 Interior Distribution System R Complete review and update
Aug-2019 S UFGS 26 24 16.00 40 Panelboards R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Aug-2019 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. Title changed from Grounding and Bonding for Electronic Safety and Security to Grounding and Bonding for Electrical Systems.
Aug-2019 A UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements R Complete review and update.
Aug-2019 N UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) R New title (formerly COMMISSIONING OF FUEL FACILITIES); Section revised and enhanced to include the requirements for Initial fuel receipt, flushing, cleaning, control valve adjustments, equipment tests and performance testing for fuel facilities that are “dead-end” type; Preparing Activity has been changed from Air Force to Navy.
Aug-2019 A UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines R Complete review and update including section title change from NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION to NATURAL-GAS / LIQUEFIED PETROLEUM GAS DISTRIBUTION PIPELINES.
Aug-2019 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 1 Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.
Aug-2019 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling; title changed from Medium-Voltage Gas Switch to Medium Voltage Switch.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
May-2019 S UFGS 01 33 00 Submittal Procedures C 3 Editing Para 1.17
May-2019 N UFGS 01 35 26 Governmental Safety Requirements C 7 In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer.
May-2019 N UFGS 01 57 19 Temporary Environmental Controls C 2 In response to CCR 7194, FAR clause 52.242-14 Suspension of Work was added to the paragraph "Non-Compliance Notifications"; updated links per CCRs 7375 and 7376
May-2019 A UFGS 01 78 00 Closeout Submittals R Complete review and update.
May-2019 A UFGS 01 91 00.15 10 Total Building Commissioning N This UFGS is for Army and Air Force use only; superseding UFGS 01 91 00.15 TOTAL BUILDING COMMISSIONING for Army and Air Force requirements only. Note: 01 91 00.15 is now for Navy use only, USACE remains the Preparing Activity [until 05-2020].
May-2019 A UFGS 04 20 00 Unit Masonry C 2 Added sentence to paragraph 2.6.2.7 in response to CCR 7025.
May-2019 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 2456, 5773); also address CCR 3956 – Reference NFPA 285 where required
May-2019 N UFGS 08 51 13 Aluminum Windows R Provide requirements for ATFP and windborne debris regions (which addresses CCRs 1785, 5195, 6074), also addresses the following CCRs: 1876 - Provide bracket option for mock-ups; 2454 – Thermal performance of assembly; 2673 – Remove redundancy of hung windows; 2769 – Testing requirements for thermal performance
May-2019 N UFGS 08 81 00 Glazing R Address the following CCRs: 2253, 2342 – Separate requirements for Fire Protection and Fire Resistant Glazing; 2701 – Option for blast mitigation glazing; 3917 – Option for glazing for passive solar and dynamic control fenestration; 4302 – Option for triple glazed insulated units; 4339, 5838 – Glazing tape types; 5176 – Updated testing reference for performance of insulated glass units; 5389 – Removal of redundant information regarding insulated glass units
May-2019 A UFGS 11 13 19.13 Loading Dock Levelers C 1 Added reference publications MHI MH30.1, MHI MH30.3, ASTM D624, and ASTM D2632 in response to CCR 7391.
May-2019 S UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers R New title (formerly THREE-PHASE PAD-MOUNTED TRANSFORMERS) CCR changes.
May-2019 S UFGS 26 24 19.00 40 Motor-Control Centers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 A UFGS 26 33 53 Static Uninterruptible Power Supply (UPS) N Superseding UFGS 26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA CAPACITY and UFGS 26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS).
May-2019 N UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) D Superseded by UFGS 26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS) (Preparing Authority: Army) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2019 S UFGS 26 60 13.00 40 Low-Voltage Motors R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks R Complete review and update.
May-2019 N UFGS 33 71 01 Overhead Transmission and Distribution R Changes required for formatting, updating transformer efficiencies, and CCR changes.
May-2019 S UFGS 33 73 00.00 40 Utility Transformers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
May-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 3 Updated list of allowable materials in paragraph 2.2 in response to CCR 6444, CCR 6719, and CCR 7165.
Feb-2019 S UFGS 01 33 00 Submittal Procedures C 2 In response to CCR's 7173, 7174, 7175, 7176, 7177, and 7123. 02/28/19 INTERIM RELEASE: This section was updated in response to CCR's 7314 and 7315 - the banner was incorrectly marked and was corrected to indicate Change 2; the command Execute Revisions was run to eliminate formatting elements that displayed in the previous version.
Feb-2019 A UFGS 01 42 00 Sources for Reference Publications R Complete review and update.
Feb-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.
Feb-2019 A UFGS 01 74 19 Construction Waste Management and Disposal R Complete review and update including section title change from CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT to CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Feb-2019 A UFGS 01 78 00 Closeout Submittals C 5 Added submittal item to paragraph 1.7.1 in response to CCR 7121.
Feb-2019 A UFGS 01 91 00.15 Building Commissioning R Complete review and update.
Feb-2019 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 2 Coordinated the requirements for demolition and deconstruction activities with UFGS 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
Feb-2019 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 11 19.00 Insulating Concrete Forming D This UFGS (03 11 19.00 10) is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 15 00.00 10 Concrete Accessories D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 20 00.00 10 Concrete Reinforcing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 N UFGS 03 30 00 Cast-In-Place Concrete R Specification refresh. This section supersedes the following ARMY sections: 03 11 13.00 10 Structural Cast-In-Place Concrete Forming, 03 11 19.00 10 Insulating Concrete Forming, 03 15 00.00 10 Concrete Accessories, 03 20 00.00 10 Concrete Reinforcing, 03 30 00.00 10 Cast-In-Place Concrete, 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works, 03 35 00.00 10 Concrete Finishing, 03 39 00.00 10 Concrete Curing
Feb-2019 A UFGS 03 30 00.00 10 Cast-In-Place Concrete D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 N UFGS 03 31 29 Marine Concrete with Service Life Modeling R New title (formerly MARINE CONCRETE); Section revised to incorporate data, recommended changes, align with current industry practice, and address challenges of concrete service life modeling.
Feb-2019 N UFGS 03 31 30 Marine Concrete N New marine concrete section developed for projects not requiring concrete service life modeling.
Feb-2019 A UFGS 03 35 00.00 10 Concrete Finishing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 03 39 00.00 10 Concrete Curing D This UFGS is no longer required and is superseded by UFGS 03 30 00 CAST-IN-PLACE CONCRETE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) R Complete review and update including section title change from BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES) to BLAST RESISTANT DOORS (EARTH COVERED MAGAZINES). PA changed from NAVFAC to ARMY.
Feb-2019 N UFGS 12 35 30.23 20 Bathroom Casework R Non-technical revision; Formerly titled UFGS 12 36 00.00 20 MANUFACTURED VANITIES; In response to CCR# 7057, section number and title have been revised (with no section date change) to conform with CSI MasterFormat.
Feb-2019 N UFGS 12 36 00.00 20 Manufactured Vanities D To conform with CSI MasterFormat, Section 12 36 00.00 20 MANUFACTURED VANITIES has been renumbered and renamed as Section 12 35 30.23 20 BATHROOM CASEWORK with no date change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 21 13 25 High-Expansion Foam System, Fire Protection N New UFGS.
Feb-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC R Complete review and update.
Feb-2019 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems R Complete review and update.
Feb-2019 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems R Complete review and update.
Feb-2019 A UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration R Complete review and update.
Feb-2019 A UFGS 26 54 21.00 10 Helipad Lighting and Visual Navigation Aids D Superseded by UFGS 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 26 56 20 Airfield and Heliport Lighting and Visual Navigation Aids N Superseding UFGS 26 54 21.00 10 HELIPAD LIGHTING AND VISUAL NAVIGATION AIDS, UFGS 26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS, and UFGS 34 43 00.00 20 AIRFIELD LIGHTING. Complete review and update.
Feb-2019 A UFGS 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids D Superseded by UFGS 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 32 12 15.16 Stone Matrix Asphalt (SMA) for Airfield Paving N Section number reinstated; Superseding UFGS 32 13 17 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS. Complete review and update including section number and title changes.
Feb-2019 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements D Superseded by UFGS 32 12 15.16 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 33 40 00 Stormwater Utilities C 6 Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.
Feb-2019 N UFGS 34 43 00.00 20 Airfield Lighting D Superseded by Army Section 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2019 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 2 Updated Hydroelectric Design Center (HDC) phone number and ER reference in response to CCR 7048.
Nov-2018 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 3 Deleted requirement for Azores excess shipping cost provisions. 
Nov-2018 N UFGS 00 73 03 Supplementary Conditions for Azores Projects D Section is outdated and not used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 01 14 00 Work Restrictions C 6 Changed tailoring tags from NAVFAC PAC to NAVFAC HI based on CCRs, removed outdated information for Naval Shipyard Pearl Harbor, HI, and added personnel security requirements for use in secure or controlled areas.
Nov-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Corrected notes and paragraphs, for DB and DBB, on Baseline NAS submittals and requirements.
Nov-2018 S UFGS 01 33 00 Submittal Procedures C 1 Submittal Note updated and tailoring changes.
Nov-2018 A UFGS 01 78 00 Closeout Submittals C 4 Deleted reference to NFAS Clause. Added Sustainable Materials certification reporting requirements.
Nov-2018 A UFGS 02 42 91 Removal and Salvage of Historic Construction Materials R Periodic update. Complete review and update.
Nov-2018 A UFGS 02 81 00 Transportation and Disposal of Hazardous Materials R Periodic update. Complete review and update.
Nov-2018 N UFGS 02 82 00 Asbestos Remediation N Update to industry standards and unifying into one Tri-Service UFGS.  Superseding UFGS 02 82 13.00 10 (Army) Asbestos Abatement and UFGS 02 82 16.00 20 (Navy) Engineering Control of Asbestos Containing Materials.
Nov-2018 A UFGS 02 82 13.00 10 Asbestos Abatement D Superseded by new UFGS 02 82 00 ASBESTOS REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials D Superseded by UFGS 02 82 00 ASBESTOS REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead D Superseded by UFGS 02 83 00 LEAD REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 02 83 00 Lead Remediation N Update to industry standards and unifying into one Tri-Service UFGS. Superseding UFGS 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead (Navy), UFGS 02 83 13.00 20 Lead in Construction (Navy), and UFGS 02 83 19.13 10 Lead-Based Paint Abatement (Army).
Nov-2018 N UFGS 02 83 13.00 20 Lead in Construction D Superseded by UFGS 02 83 00 LEAD REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 A UFGS 02 83 19.13 10 Lead-Based Paint Abatement D Superseded by new UFGS 02 83 00 LEAD REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 02 85 00 Mold Remediation N Update to industry standards and unifying into one Tri-Service UFGS.  Superseding UFGS 02 85 00.00 20 Mold Remediation.
Nov-2018 N UFGS 02 85 00.00 20 Mold Remediation D Superseded by UFGS 02 85 00 MOLD REMEDIATION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2018 N UFGS 03 30 00 Cast-In-Place Concrete C 4 Added note to use UFGS 03 31 29 or UFGS 03 31 30 in ESC C4 and C5 locations or where deicing salts.
Nov-2018 N UFGS 03 31 29 Marine Concrete with Service Life Modeling C 2 Added notes to direct use of this section and Type II and V Portland cement in ESC C4 and C5 locations and where deicing salts used on structure, note for coral aggregates, and note for water reducing.
Nov-2018 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 1 Added requirement and note to use galvanized tendons in ESC C4 and C5 locations, and concrete cover requirements for tendon anchorages for post tensioning.
Nov-2018 A UFGS 04 20 00 Unit Masonry C 1 Added Single-Wythe Exterior Wall CMU Flashing System, requirements for tooled joints, and note for load-bearing unit types.
Nov-2018 N UFGS 05 12 00 Structural Steel C 1 Added note for shop primer requirements in exterior locations or areas open to the exterior.
Nov-2018 N UFGS 06 10 00 Rough Carpentry C 2 Added notes for requirement of preservative treatment and hot-dip galvanized rough hardware in ESC C3 thru C5 and humid locations, and not to use particle board or OSB in C4 and C5 and humid locations.
Nov-2018 A UFGS 06 17 19 Cross-Laminated Timber C 1 Added recommendation not to use CLT in humid or ESC locations C4 and C5.
Nov-2018 S UFGS 06 18 00 Glued-Laminated Construction C 1 Added Note to not use GLC in ESC C4 and C5 and humid locations.
Nov-2018 N UFGS 06 20 00 Finish Carpentry C 2 Added notes to not use particleboard or hardboard siding in humid or ESC C4 and C5 locations.
Nov-2018 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets C 1 Updated reference in response to CCR 6899.
Nov-2018 N UFGS 07 22 00 Roof and Deck Insulation C 3 Added notes to consider use of polystyrene as a roof insulation in humid or ESC C3-C5 locations and not to use wood fiberboard in humid or ESC C4-C5 locations.
Nov-2018 N UFGS 07 41 13 Metal Roof Panels C 2 Added notes for gauge requirements of Aluminum and Steel Sheet Panels in humid and ESC C3-C5 locations.