UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2020 N UFGS 23 75 15 Custom-Packaged, Aircraft Pre-Conditioned Air Units N New specification covering the requirements for high-pressure, preconditioned air units, ductwork and controls for aircraft cooling systems in conjunction with UFC 4-211-01, Aircraft Maintenance Hangars.
Feb-2020 N UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems N New specification covering the requirements for variable refrigerant flow (VRF) type air conditioning and heat pumps systems and accessories in conjunction with UFGS 23 09 00 Instrumentation and Control for HVAC, UFGS 23 09 23.01 LONWORKS Direct Digital Control for HVAC and Other Building Control Systems, UFGS 23 09 23.02 BACNET Direct Digital Control for HVAC and Other Building Control Systems, UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems, and UFC 3-410-02 Direct Digital Control for HVAC and Building Control Systems.
Feb-2020 A UFGS 23 82 01.00 10 Warm Air Heating Systems C 1 Updated section reference in paragraph 2.11.6 in response to CCR 5140.
Feb-2020 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear C 1 Complete review and update; CCRs to address updating references and use of imperative language
Feb-2020 N UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts R Complete review and update, including Section Title change (was VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS)
Feb-2020 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Complete review and update including section title change from HIGH-SECURITY CHAIN LINK FENCES AND GATES to HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES.
Feb-2020 A UFGS 32 31 26 Wire Fences and Gates R Complete review and update.
Feb-2020 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall D Superseded by UFGS 32 32 23.13 SEGMENTAL CONCRETE BLOCK RETAINING WALL. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 32 32 23.13 Segmental Concrete Block Retaining Wall N Superseding UFGS 32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL. Complete review and update including section number change from 32 32 23 to 32 32 23.13.
Feb-2020 A UFGS 33 01 50.31 Leak Detection For Fueling Systems N Superseding UFGS 33 58 00 LEAK DETECTION FOR FUELING SYSTEMS. Complete review and update including section number change from 33 58 00 to 33 01 50.31.
Feb-2020 F UFGS 33 12 33.00 30 Water Meters D Section is no longer needed. All water meter requirements are covered in UFGS 33 11 00 WATER UTILITY DISTRIBUTION PIPING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 33 58 00 Leak Detection for Fueling Systems D Superseded by UFGS 33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System C 1 Deleted reference from paragraphs 3.9.1.1 and 3.9.1.2 in response to CCR 2504. Updated paragraph 2.4.4 in response to CCR 3271.
Feb-2020 A UFGS 34 41 26.00 10 Access Control Point Control System D Section is no longer required. Superseded by UFGS 34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls R Complete review and update including section title change from ACTIVE VEHICLE BARRIERS to CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS. Superseding UFGS 34 41 26.00 10 ACCESS CONTROL POINT CONTROL SYSTEM.
Feb-2020 A UFGS 35 41 00 Levee Construction C 1 Incorporated changes to provide clarification to the responsibility of the contractor related to subsurface interpretation in paragraph 1.6.3; temporary excavation slopes in paragraph 3.9.5; and slope failure and sliding due to fault or negligence of the contractor in paragraph 3.11.
Feb-2020 A UFGS 40 05 13 Pipelines, Liquid Process Piping C 2 Updated references and paragraph 2.14.1 in response to CCR 79.
Feb-2020 N UFGS 41 22 13.13 Bridge Cranes D Superseded by UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley R Complete review and update. Incorporates latest crane test and certification requirements.
Feb-2020 N UFGS 41 22 13.16 Gantry Cranes C 1 Updated Specifier Note in Part 1 clarifying when to use related UFGS crane sections.
Feb-2020 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment N New Section combining UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration and 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical
Feb-2020 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration D Superseded by UFGS 46 07 53 Packaged Wastewater Treatment Equipment Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 A UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical D Superseded by new (Navy) UFGS 46 07 53 PACKAGED WASTEWATER TREATMENT EQUIPMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2020 N UFGS 46 23 00 Grit Removal and Handling Equipment R Complete review and update.
Feb-2020 N UFGS 46 43 21 Circular Clarifier Equipment R Complete review and update.
Feb-2020 A UFGS 48 06 15 Turbine Oil C 1 Updated paragraphs 1.4, 2.1.1, 2.1.2, 2.2, 2.3 and 2.4 in response to CCR 4578.
Nov-2019 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 6757, paragraph FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS (1.7) was deleted as it is repetitive of requirements already noted in Section 02 82 00 ASBESTOS REMEDIATION; per CCR 6658, Air Force tailoring has been added to the paragraphs "Duties" (1.7.2.1) and FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ) (1.9) since AFCEC/CF utilizes the Red Zone processes.
Nov-2019 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 3 In response to CCR 7497, brackets were added to the paragraph Field Administration (1.4.3) and the text was updated to clarify the disposition of the tablet computer.
Nov-2019 N UFGS 01 35 13 Special Project Procedures C 2 In response to CCR 4579, landing area "clear zones" in paragraph Definitions (1.2) has been updated to correct fixed wing information and add helicopter information.
Nov-2019 N UFGS 01 45 00.00 20 Quality Control C 4 In response to the following: CCR 7292, the Designer Note with instructions for bracketed sentences was removed from the paragraph COORDINATION AND MUTUAL UNDERSTANDING MEETING (1.7) since the text did not contain any brackets; CCR 7294, the Designer Note for paragraph QC ORGANIZATION (1.5) and paragraph Qualifications (1.5.1.2) has been updated to read FEAD/ROICC; CCRs 6296, 6300, 6301, OMSI has been replaced with O&M in paragraphs INFORMATION FOR THE CONTRACTING OFFICER (1.3-h.), Completion Certification (1.13.3), and DOCUMENTATION-Testing Plan and Log (1.15.4) to better align with the terminology utilized in Section 01 78 23 Operation and Maintenance Data.
Nov-2019 S UFGS 02 42 51 Carpet Removal and Reclamation R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 N UFGS 02 82 00 Asbestos Remediation C 1 In response to CCR 6757, paragraph "Competent Person Documentation" has been changed to "Designated Competent Person Documentation" (1.5.2) and a first tier requirement was added.
Nov-2019 S UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 A UFGS 03 55 16 Gypsum Concrete Floor Planks D Section is obsolete and no longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 05 14 00.13 Welding Structural Aluminum Framing R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 5 Added notes throughout the specification and notes to the specifier prohibiting torch application of the roofing system when the roof deck, the materials used in the installation of the roofing system, or the existing roof deck or materials are combustible as defined by NFPA 101. Added required submittal to Submittals Article (1.3) of torch applicators CERTA card. Added requirement in paragraph "Preroofing Conference" (1.4.8-g). for torch operator to attend the preroofing conference. Added requirement in paragraph "Fire Watch" (1.7.2) for the use of thermal heat imager during the firewatch.
Nov-2019 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 08 33 23 Overhead Coiling Doors R Superseding section 08 34 19.10 20 - ROLLING SERVICE [AND FIRE] DOORS Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 08 34 73 Sound Control Door Assemblies R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 23 82 Fireproof Gypsum Plastering R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 67 23.13 Standard Resinous Flooring R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 09 97 13.00 40 Steel Coatings R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 N UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks (For Petroleum Fuels) D This section is no longer required as the information has become obsolete. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 10 44 16 Fire Extinguishers R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment C 1 Updated paragraphs 2.2 and 2.3 in response to CCR 6932.
Nov-2019 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 1 Updated paragraphs 2.3, 2.4.1, and 2.5 in response to CCR 6932.
Nov-2019 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 09 00 Instrumentation and Control for HVAC C 1 Added new paragraph 1.1.1 to accommodate a recent change in Navy policy.
Nov-2019 N UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 23 52 00 Heating Boilers C 5 Updated designer's note on page 15 in response to CCR 6454.
Nov-2019 A UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers R Complete review and update.
Nov-2019 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (1.11-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”
Nov-2019 S UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems R This section supersedes UFGS 28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY. The Section title and number were changed to align with the Electrical Systems.
Nov-2019 N UFGS 26 05 33 Dockside Power Connection Stations C 1 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.6-a.), “Decal shall be Panduit No. PPSO710D72 or approved equal.”.
Nov-2019 N UFGS 26 11 16 Secondary Unit Substations C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS (2.5-a.), "Decal shall be Panduit No. PPSO710D72 or approved equal.".
Nov-2019 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
Nov-2019 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 2 FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph/list WARNING SIGNS AND LABELS (2.6-a.), “(decals, Panduit No. PPSO710D72 or approved equal)”.
Nov-2019 N UFGS 26 20 00 Interior Distribution System C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 23 00 Low Voltage Switchgear C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 26 32 13.00 20 Single Operation Generator Sets C 2 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 A UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) C 1 Updated paragraphs 2.3.11.3, 2.3.14, 3.5.2.1, and 3.5.2.2 to remove "brand name or approved equal" language in response to CP/DWG discussions.
Nov-2019 S UFGS 26 51 00.00 40 Interior Lighting D Removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems D Section has been superseded by UFGS 26 05 26.00 40 Grounding and Bonding for Electrical Systems. The Section number was changed to align with the Electrical Systems. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 31 63 29 Drilled Concrete Piers and Shafts R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement R Complete review and update to meet MF2016 and UFC 1-300-02; title changed from RESEALING OF JOINTS IN RIGID PAVEMENT. Revision supersedes previous version and UFGS 32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS.
Nov-2019 A UFGS 32 11 13.13 Lime Treated Subgrade N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 11 29 LIME-[STABILIZED][MODIFIED] SUBGRADE and UFGS 32 11 30 LIME TREATED SUBGRADE [LIME MODIFIED SOILS]
Nov-2019 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade D Superseded by UFGS 32 11 13.13 LIME TREATED SUBGRADE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 N UFGS 32 11 36.13 Lean Concrete Base Course R Complete review and update to meet MF2016 and UFC 1-300-02.
Nov-2019 A UFGS 32 12 16.19 Cold-Mix Asphalt Paving N Section Number has been reinstated. Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 19 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX).
Nov-2019 A UFGS 32 12 18 Resin Modified Pavement Surfacing Material D Superseded by UFGS 32 12 19.16 RESIN-MODIFIED ASPHALT PAVING WEARING COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) D Superseded by UFGS 32 12 16.19 COLD-MIX ASPHALT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 12 18 RESIN MODIFIED PAVEMENT SURFACING MATERIAL.
Nov-2019 A UFGS 32 13 73 Compression Joint Seals for Concrete Pavements D Superseded by UFGS 32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 A UFGS 32 13 73.19 Compression Concrete Paving Joint Sealant N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS.
Nov-2019 A UFGS 32 14 13.13 Interlocking Precast Concrete Unit Paving N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 32 16 15 CONCRETE BLOCK PAVEMENTS.
Nov-2019 A UFGS 32 16 15 Concrete Block Pavements D Superseded by UFGS 32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 33 05 23.13 Utility Horizontal Directional Drilling R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2019 S UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type D Superseded by 33 32 16 - PACKAGED UTILITY WASTEWATER PUMPING STATIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2019 S UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations R Revised to combine Section 33 32 16 Packaged Utility Wastewater Pumping Stations with Section 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type. Preparing Activity changed from NAVFAC to NASA.
Nov-2019 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2019 N UFGS 33 71 01 Overhead Transmission and Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Nov-2019 N UFGS 33 71 02 Underground Electrical Distribution C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
Nov-2019 A UFGS 34 73 13 Aircraft Tiedowns R Complete review and update to meet MF2016 and UFC 1-300-02 including section title change from MOORING AND GROUNDING POINTS FOR AIRCRAFT to AIRCRAFT TIEDOWNS.
Nov-2019 A UFGS 34 73 16 Airfield Grounding N Complete review and update to meet MF2016 and UFC 1-300-02. Superseding UFGS 34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT.
Nov-2019 A UFGS 40 95 00 Process Control R Complete review and update.
Nov-2019 N UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running R Complete review and update. Incorporates latest crane test and certification requirements.
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2019 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 6316, added paragraph to "Schedule of Work/Aircraft Operating Schedules" (3.1.2 ) to define/clarify "Existing Conditions Survey"
Aug-2019 N UFGS 01 35 26 Governmental Safety Requirements C 8 In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19)
Aug-2019 N UFGS 01 45 00.00 20 Quality Control C 3 In response to CCRs 6298 and 6299, statements requiring eOMSI/OMSI were changed to bracketed options in paragraphs "Duties Statement" (1.5.2.1) and "Test Reports and Monthly Summary Report of Tests" (1.12.5), respectively. In response to CCR 6558, Specifier Note and bracketed option were added to paragraph "Requirements" (1.6.1.1), list item k. "LIST OF DEFINABLE FEATURES"
Aug-2019 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) C 2 Updated RMS requirements in paragraph 1.4 and deleted paragraph 1.5 in response to CCR 7627.
Aug-2019 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
Aug-2019 N UFGS 01 57 19 Temporary Environmental Controls C 3 In response to the following CCRs: #5233 - revised language in paragraph "Dust Control" (3.5.7) to reflect the Crystalline Silica hazard associated with cement and concrete products per the new OSHA Standard of Crystalline Silica; #5733 - "Stormwater Pollution Prevention Plan" has been added as a submittal item under SD-01 and in paragraph "Stormwater Pollution Prevention Plan" (3.2.1.1); #7178 - revision to clarify submittal item "Solid Waste Management Report", updated as "Monthly Solid Waste Disposal Report" in Part 1 (1.11.1) and "Project Solid Waste Disposal Documentation Report" in Part 3 (3.7.2.1) and in the Submittal Article under SD-06 and SD-11 respectively; #7179 - added a new row "C&D Debris Composted" to table under paragraph Nonhazardous Solid Waste Diversion Report (3.6.2)
Aug-2019 N UFGS 01 58 00 Project Identification R Complete review and update
Aug-2019 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness R Complete review and update.