Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
May-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 In response to CCR 8507, Section has been updated to capture the requirements for surplus soil disposal at Camp Lejeune, NC (1.4.6.1.2).
May-2020 N UFGS 01 73 19 Installation of Government-Furnished Medical Equipment D Superseded by UFGS 11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 1 Updated reference publications in response to CCR 8209.
May-2020 N UFGS 01 91 00.15 Building Commissioning C 1 Preparing Activity changed to NAVFAC as this section has been for Navy-use only since 05-2019; In response to the following: CCR 6881, paragraph Project Schedule (1.6.2) is not appropriate for use on Navy projects and was removed; and CCR 8403, in paragraph Lead Commissioning Specialist (1.8.1) , "ASHRAE Commissioning Process Management Professional (CPMP) was changed to "ASHRAE Building Commissioning Professional (BCxP)"
May-2020 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R Complete review and update.
May-2020 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R Complete review and update.
May-2020 A UFGS 08 39 53 Blast Resistant Doors (Earth Covered Magazines) C 1 Revised 1st editor's note in response to CCR 7534.
May-2020 N UFGS 11 70 00 General Requirements for Medical and Dental Equipment R Complete review and update; Revision includes merging contents of UFGS 01 73 19 INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT into this Section.
May-2020 A UFGS 11 71 00 Sterilizers and Associated Equipment R Complete review and update including section title change from WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT to STERILIZERS AND ASSOCIATED EQUIPMENT.
May-2020 N UFGS 11 72 13 Medical Equipment, Miscellaneous R Complete review and update.
May-2020 N UFGS 11 74 00 Dental Equipment R Complete review and update.
May-2020 A UFGS 11 82 19 Packaged Incinerators N This UFGS number and title has been reinstated, with Army serving as Preparing Activity; Superseding UFGS 11 82 20 INCINERATORS, GENERAL PURPOSE without revision (nontechnical number and title change) to comply with MF 2011 in response to CCR 1999.
May-2020 A UFGS 11 82 20 Incinerators, General Purpose D Superseded by UFGS 11 82 19 PACKAGED INCINERATORS without revision to comply with MF 2011 in response to CCR 1999. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 13 17 43 Hydrotherapy Equipment R Complete review and update.
May-2020 A UFGS 13 48 00 [Seismic ]Bracing for Miscellaneous Equipment D Superseded by UFGS 13 48 73 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment N Superseding UFGS 13 48 00 [SEISMIC ]BRACING FOR MISCELLANEOUS EQUIPMENT without revision to comply with MF 2011 in response to CCR 2006. Nontechnical number and title change.
May-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities R Complete review and update.
May-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems D Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
May-2020 A UFGS 23 11 20 Facility Gas Piping N Superseding UFGS 23 11 25 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Nontechnical number change. Updated reference in paragraphs 2.8 and 2.9 in response to CCR 6024.
May-2020 A UFGS 23 11 25 Facility Gas Piping D Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 30 00 HVAC Air Distribution N Superseding UFGS 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS without revision to comply with MF 2011 in response to CCR 2023. Nontechnical number and title change. Updated test requirements in paragraphs 1.4.5 and 3.13 in response to CCR 7212. Updated paragraph 2.10.5.2.4 in response to CCR 8015.
May-2020 A UFGS 23 35 00.00 10 Overhead Vehicle Tailpipe [and Welding Fume] Exhaust Removal System(s) D Superseded by UFGS 23 35 16.17 10 MECHANICAL ENGINE [AND WELDING FUME] EXHAUST SYSTEMS without revision to comply with MF 2011 in response to CCR 2029. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems N Superseding UFGS 23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE[ AND WELDING FUME] EXHAUST REMOVAL SYSTEM(S) without revision to comply with MF 2011 in response to CCR 2029. Nontechnical number and title change.
May-2020 A UFGS 23 52 30.00 10 Heat Recovery Boilers N Superseding UFGS 23 52 43.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031. Nontechnical number change.
May-2020 A UFGS 23 52 30.01 10 Central Coal-Fired Steam-Generating System N Superseding UFGS 23 70 01.00 10 CENTRAL STEAM-GENERATING SYSTEM, COAL-FIRED without revision to comply with MF 2011 in response to CCR 2034. Nontechnical number and title change.
May-2020 A UFGS 23 52 30.02 10 Central Steam Generating System - Combination Gas and Oil Fired N Superseding UFGS 23 70 02.00 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED without revision to comply with MF 2011 in response to CCR 2035. Nontechnical number change.
May-2020 A UFGS 23 52 43.00 10 Heat Recovery Boilers D Superseded by UFGS 23 52 30.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters D Superseded by UFGS 23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT without revision to comply with MF 2011 in response to CCR 2032. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems N Superseding UFGS 23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM without revision to comply with MF 2011 in response to CCR 2036. Nontechnical number and title change.
May-2020 A UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired D Superseded by UFGS 23 52 30.01 10 CENTRAL COAL-FIRED STEAM-GENERATING SYSTEM without revision to comply with MF 2011 in response to CCR 2034. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired D Superseded by UFGS 23 52 30.02 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED without revision to comply with MF 2011 in response to CCR 2035. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam D Superseded by UFGS 23 58 00.00 10 CENTRAL STEAM HEATING AND UTILITIES SYSTEMS without revision to comply with MF 2011 in response to CCR 2036. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 23 80 20.00 10 Gas-Fired Heating Equipment N Superseding UFGS 23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS without revision to comply with MF 2011 in response to CCR 2032. Nontechnical number and title change.
May-2020 N UFGS 26 00 00.00 20 Basic Electrical Materials and Methods D Section no longer required - The information in this Section has been incorporated into other UFGS Sections. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Performed Tri-Annual Maintenance. CCRs #6382 & 6784 Incorporated
May-2020 N UFGS 26 32 13.00 20 Single Operation Generator Sets D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 32 15 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries N New Unified UFGS superseding UFGS-26 32 13.00 20 Single Operation Generator Sets, UFGS-26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 kW, Standby Applications, and UFGS-26 32 15.00 10 Diesel-Generator Set, Stationary 100-250 kW, with Auxiliaries
May-2020 A UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries D Superseded by UFGS 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 36 00.00 10 Automatic Transfer Switch and By-Pass/Isolation Switch D Superseded by UFGS 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch N Superseding UFGS 26 36 00.00 10 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH and UFGS 26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES.
May-2020 N UFGS 26 36 23.00 20 Automatic Transfer Switches D Superseded by UFGS 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 26 51 00 Interior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 N UFGS 26 56 00 Exterior Lighting R Complete review and update. This includes the Lighting Plates found in both Related Materials and UFGS Forms, Graphics, and Tables.
May-2020 S UFGS 26 56 19.00 40 Roadway Lighting R Performed Tri-Annual Maintenance.CCR #4861 Incorporated
May-2020 S UFGS 26 56 36.00 40 Flood Lighting R Performed Tri-Annual Maintenance.
May-2020 N UFGS 27 05 13.43 Television Distribution System N New Unified Section superseding UFGS 27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM, UFGS 27 41 16.00 10 TELEVISION SIGNAL RECEPTION SYSTEM, and UFGS 27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
May-2020 A UFGS 27 05 14.00 10 Cable Television Premises Distribution System D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Performed Tri-Annual Maintenance.
May-2020 A UFGS 27 41 16.00 10 Television Signal Reception System D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 27 51 16 Public Address Systems R Complete review and update including section title change from RADIO AND PUBLIC ADDRESS SYSTEMS to PUBLIC ADDRESS SYSTEMS.
May-2020 A UFGS 27 53 19.13 First Responder Distributed Antennae Systems (DAS) N New UFGS.
May-2020 N UFGS 27 54 00.00 20 Community Antenna Television (CATV) D Superseded by UFGS 27 05 13.43 TELEVISION DISTRIBUTION SYSTEM Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 32 01 17.62 Paving Fabric Interlayer R Complete review and update. Section title has been changed from STRESS-ABSORBING MEMBRANE INTERLAYER to PAVING FABRIC INTERLAYER to match the revised content of this section.
May-2020 A UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements D Superseded by/consolidated into UFGS 32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 11 13.16 Bituminous-Stabilized Subgrade N Superseding UFGS 32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE.
May-2020 A UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets N This UFGS number has been reinstated. The section has undergone a complete review and update as well as a title change from BITUMINOUS BASE COURSE to HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND STREETS.
May-2020 A UFGS 32 11 26.19 Bituminous-Stabilized Base and Subbase Courses N Superseding UFGS 32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE.
May-2020 A UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade D Superseded by UFGS 32 11 13.16 BITUMINOUS-STABILIZED SUBGRADE and UFGS 32 11 26.19 BITUMINOUS-STABILIZED BASE AND SUBBASE COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] D Superseded by UFGS 32 11 13.13 LIME TREATED SUBGRADE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 11 33.13 Portland Cement-Stabilized Base Courses N Superseding UFGS 32 11 34 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE.
May-2020 A UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course D Superseded by UFGS 32 11 33.13 PORTLAND CEMENT-STABILIZED BASE COURSES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces D Superseded by UFGS 32 12 36.26 10 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 32 12 36.26 10 Polymer Concrete Micro-Overlay (PCMO) for Fuel and Abrasion Resistant Wearing Surfaces N Superseding UFGS 32 12 22.00 10 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES.
May-2020 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities R Complete review and update.
May-2020 N UFGS 32 13 43 Pervious Concrete Paving R Complete review and update.
May-2020 A UFGS 33 46 13 Foundation Drainage R Superseding UFGS 33 46 13 FOUNDATION DRAINAGE SYSTEM without revision to comply with MF 2011 in response to CCR 2146. Nontechnical title change.
May-2020 A UFGS 33 56 53 Compressed Gases Storage Tanks R Superseding UFGS 33 56 53 PRESSURE VESSELS FOR STORAGE OF COMPRESSED GASES without revision to comply with MF 2011 in response to CCR 2155. Nontechnical title change.
May-2020 A UFGS 40 60 00 Process Control N Superseding UFGS 40 95 00 PROCESS CONTROL without revision to comply with MF 2016 in response to CCR 5843. Nontechnical number change.
May-2020 A UFGS 40 95 00 Process Control D Superseded by UFGS 40 60 00 PROCESS CONTROL without revision to comply with MF 2016 in response to CCR 5843. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 41 22 23.19 Monorail Hoists R Complete review and update. Incorporates latest test and certification requirements.
May-2020 A UFGS 41 24 26 Hydraulic Power Systems R Superseding UFGS 41 24 46 HYDRAULIC FLUID POWER SYSTEMS without revision to comply with MF 2011 in response to CCR 2184. Nontechnical title change.
May-2020 A UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas D Superseded by UFGS 43 11 00.10 OFF-GAS FANS, BLOWERS AND PUMPS without revision to comply with MF 2011 in response to CCR 2189. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps N Superseding UFGS 43 11 00 FANS/BLOWERS/PUMPS; OFF-GAS without revision to comply with MF 2011 in response to CCR 2189. Nontechnical number and title change.
May-2020 A UFGS 43 13 13.13 Vapor Phase Activated Carbon Adsorption Units D Superseded by UFGS 44 13 10.13 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS without revision to comply with MF 2011 in response to CCR 2190. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 A UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units N Superseding UFGS 43 13 13.13 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS without revision to comply with MF 2011 in response to CCR 2190. Nontechnical number change.
May-2020 A UFGS 44 13 51 Thermal Oxidation Equipment N Superseding UFGS 44 13 52 THERMAL (CATALYTIC) OXIDATION SYSTEMS without revision to comply with MF 2011 in response to CCR 2196. Nontechnical number and title change.
May-2020 A UFGS 44 13 52 Thermal (Catalytic) Oxidation Systems D Superseded by UFGS 44 13 51 THERMAL OXIDATION EQUIPMENT without revision to comply with MF 2011 in response to CCR 2196. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 44 41 00.00 20 Water Pollution Containment and Cleanup Equipment N New Navy-only specification for containment of fire suppressant discharge.
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Feb-2020 A UFGS 01 45 00.00 10 Quality Control C 1 Added hyperlink to paragraph 3.7.2 in response to CCR 7765.
Feb-2020 N UFGS 01 45 00.00 20 Quality Control C 5 In response to the following: CCR 4323, "QCM" and "CQM" changed to "QC Manager" for clarity in paragraph (1.14.2) Pre-Final Inspection; CCR 6302, Specifier Note in paragraph (1.5.10) QC Administrative Assistant, removed reference to require Section 01 33 29 Sustainability Reporting. It is up to the contractor to determine how they comply with contract requirements; CCR 8046, Specifier Note in paragraph (1.5.1.2) Qualifications updated to properly select the CQC requirements; and CCR 8243, para QC PROGRAM REQUIREMENTS (1.4) updated to ensure uniformity for all NAVFAC projects that compliance of the Quality Control Manager will report to an officer of the firm/company.
Feb-2020 N UFGS 01 45 35 Special Inspections R Section has been unified and merged with Navy DB RFP Division 1 Specifications to ensure that the Division 1 specs for DB and DBB are aligned, current, and compatible with USACE and NAVFAC. PA changed from Army to NAVFAC.
Feb-2020 A UFGS 07 27 10.00 10 Building Air Barrier System C 1 Revised paragraph 1.7 to update air barrier inspector qualification requirements.
Feb-2020 N UFGS 09 29 00 Gypsum Board C 4 In response to CCR 8088
Feb-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 2 Updated paragraphs 2.4 and 2.4.7 in response to CCR 7072.
Feb-2020 A UFGS 09 97 02 Painting: Hydraulic Structures R Complete review and update.
Feb-2020 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 3 Updated paragraph 2.13 a. in response to CCR 2691.
Feb-2020 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.
Feb-2020 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 6 Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Feb-2020 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 09 23.02 BACnet Direct Digital Control for HVAC and Other Building Control Systems C 1 Incorporated changes to accommodate new requirements for an exception to the use of open protocols within specific system types when certain criteria are met.
Feb-2020 A UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters C 1 Updated paragraph 2.1.1 in response to CCR 3988.