UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2020 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks C 1 Updated subpart 2.4.1 in response to CCR 7770. Updated note in subpart 2.5. Added subparts 2.6.1.1 and 2.6.2.1. Updated subpart 2.14.1 in response to CCR 9187.
Nov-2020 A UFGS 33 56 19 Fuel Impermeable Liner System C 1 Updated notes in subparts 2.1.3, 2.2.7, 3.5.1 and 3.7 in response to CCR 4564.
Nov-2020 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 1 Updated Reference Article and paragraphs "Weld Inspector Certification" (1.9.4), "Qualifications of API Std 653 Inspector" (1.9.7), "Mechanical Tape Level Gauge" (2.13.5) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) C 1 Updated paragraph "Filters" (2.29.1.3).
Nov-2020 A UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type N New UFGS.
Nov-2020 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar N New crane section developed specifically for aircraft hangars.
Nov-2020 A UFGS 41 24 26 Hydraulic Power Systems C 1 Deleted all references to SAE J1165 and replaced with ISO 4406 in response to CCR 1788.
Aug-2020 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 01 14 00 Work Restrictions C 10 Incorporate EURAFCENT requirements from, and supersede UFGS 00 74 00 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA. Also, incorporate the following CCRs: CCR 8681, revised requirements to ensure adherence to all appropriate PPE in paragraphs "Activity Regulations" (1.5.1) and "Shipyard Regulations" (1.5.3); CCR 8683, updated Specifier Note and paragraph "Working Hours" (1.5.5) to reflect the work schedules for various regions.
Aug-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 3 In response to CCR 8819, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and in paragraph "Data Required" (1.3.1)
Aug-2020 N UFGS 01 30 00 Administrative Requirements C 4 In response to CCRS 8820 and 9015, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01, updated paragraph "Formal Partnering" (1.12.1), and added paragraph "MOBILIZATION" (1.14).
Aug-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 5 In response to CCR 8821, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01
Aug-2020 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Aug-2020 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 3 In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).
Aug-2020 N UFGS 01 35 26 Governmental Safety Requirements C 10 In response to CCR 8826, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "ACCIDENT PREVENTION PLAN (APP)" (1.8).
Aug-2020 N UFGS 01 45 00.00 20 Quality Control C 7 In response to the following CCRs: CCR 8960, the Note pertaining to paragraph "Registered Fire Protection Engineer" (1.5.8) has been revised for clarity; CCR 8961, paragraph "QC Administrative Assistant" (1.5.10) has been removed to align with the other QC sections; CCR 8827, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: revised Submittal Article SD-01 and paragraph "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17).
Aug-2020 N UFGS 01 45 00.10 20 Quality Control for Minor Construction C 2 In response to CCR 8828, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and Note and to paragraph "QC PLAN" (1.6).
Aug-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
Aug-2020 N UFGS 01 57 19 Temporary Environmental Controls C 4 In response to CCR 8832, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and paragraph "ENVIRONMENTAL PROTECTION PLAN" (1.7); under paragraphs "Stormwater Pollution Prevention Plan" (3.2.1.1) and "Stormwater Notice of Intent for Construction Activities" (3.2.1.2) added note and text.
Aug-2020 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Additional change made regarding CCR 8507, the section has been updated to clarify requirements for surplus soil disposal at Camp Lejenue (1.4.6.1.2). In response to CCR 8833, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under SD-01 and in paragraph "Notice of Construction (NOC) and Notice of Completion" (1.5.3.6).
Aug-2020 N UFGS 01 58 00 Project Identification C 1 In response to CCR 8950, revised Specifier Note in paragraph Quality Control (1.3) for additional guidance.
Aug-2020 A UFGS 01 74 19 Construction Waste Management and Disposal C 1 Updated last paragraph of designer's note and specification text in subpart 1.5 in response to CCR 9043. Added notes for NAVFAC PAC requirements in subparts 1.5 and 1.7, and updated text in first paragraph of subpart 1.7 in response to CCR 8834. Deleted tailoring options in subparts 1.3 and 1.4.3 in response to CCR 8911. Added tailoring options to submittal SD-06 in response to CCR 8912. Updated designer's note referring to Third Party Certification in subpart 1.7 in response to CCR 8913. Added tailoring options in subparts 1.6 and 1.7, and deleted first designer's note in subpart 1.7 in response to CCR 8914.
Aug-2020 A UFGS 01 91 00.15 10 Total Building Commissioning C 2 Updated commissioning certification in paragraph 1.8.1 in response to CCR 8404.
Aug-2020 A UFGS 03 70 00 Mass Concrete C 2 Updated paragraph 3.7.2.6.5 in response to CCR 1786.
Aug-2020 A UFGS 06 61 16 Solid Surfacing Fabrications R Complete review and update including sustainability requirements.
Aug-2020 N UFGS 07 21 13 Board and Block Insulation C 2 In response to CCR 8689, updated phrasing used in SPECIAL WARRANTIES (1.8) for the start of the warranty period to include "or Substantial Completion".
Aug-2020 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 2 In response to CCR 8741, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 2 In response to the following CCRs: 8742, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01; and 8779, added Specifier Note and dry film thickness requirements to paragraph "Installation of Fluid-Applied Membrane Air Barrier" (3.3.3) .
Aug-2020 N UFGS 07 27 36 Spray Foam Air Barriers C 2 In response to CCR 8743, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 07 41 13 Metal Roof Panels C 3 In response to CCR 8778, updated supporting steel tolerances to reflect industry standards in paragraph "Erection Tolerances" (3.8.1).
Aug-2020 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 4 In response to CCR 8748, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 08 11 13 Steel Doors and Frames R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 11 73 Sliding Fire Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 32 13 Aluminum Sliding Glass Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 S UFGS 08 33 23 Overhead Coiling Doors R Periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and Submittals. Superseding UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors. Revision incorporates information from UFGS 08 34 19.10 20 and CCR 3405.
Aug-2020 N UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors D Superseded by UFGS 08 33 23 OVERHEAD COILING DOORS (NASA-prepared) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 08 36 13 Sectional Overhead Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 36 19 Vertical Lift Doors R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 23 Steel Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 51 69.10 Aluminum Storm Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 52 00 Wood Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 53 00 Plastic Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 56 53 Blast Resistant Tempered Glass Windows R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRS as well as correcting formatting, references, and submittals.
Aug-2020 N UFGS 08 71 00 Door Hardware C 3 In response to CCR 4895, the Specifier Note in "Locks and Latches" (2.3.5) has been revised to reflect the latest door locking system specified in the Unaccompanied Housing FC.
Aug-2020 N UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 09 51 00 Acoustical Ceilings R Complete review and update including sustainability requirements.
Aug-2020 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System C 2 In response to CCR 6045, replaced "Vulkem 245" with "Stoneflex MP7" in Table II for Vendor Stonhard's sealant.
Aug-2020 A UFGS 09 68 00 Carpeting C 2 Deleted second paragraph of subpart 2.1.1 in response to CCR 8744.
Aug-2020 N UFGS 09 90 00 Paints and Coatings C 5 In response to the following CCRs: CCR 3281, corrected metric equivalent measurements in "Existing Surfaces with a Bituminous or Mastic-Type Coating" (3.5.6), "Concrete and Masonry" (3.6.1), and "New[, Existing Uncoated,][ and ][Existing Coated] Plywood and Wood Surfaces, Except Floors" (3.7.1); CCR 4282, added the options of corrosive environments to "Exterior Paint Tables" (3.15.1), EXTERIOR GALVANIZED SURFACES, "G" and "H"; CCR 6392, removed references to SCS Global; CCR 6869, removed "MPI 7" from References and replaced "MPI 7" with "MPI 6" in "Exterior Paint Tables" (3.15.1), Division 6 "A"; and CCR 8722, capitalized "Contractor" throughout.
Aug-2020 A UFGS 10 11 00 Visual Display Units R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 14 00.20 Interior Signage R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 21 13 Toilet Compartments R Complete review and update including sustainability requirements.
Aug-2020 N UFGS 10 22 26.13 Accordion Folding Partitions C 2 In response to CCR 8746, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 N UFGS 10 22 26.23 Coiling Partitions C 2 In response to CCR 8747, "Statement of Code Compliance" and "Statement of Standards Conformity" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.
Aug-2020 A UFGS 10 22 39 Folding Panel Partitions R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 26 00 Wall and Door Protection R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 10 28 13 Toilet Accessories R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 24 13 Roller Window Shades R Complete review and update including sustainability requirements.
Aug-2020 A UFGS 12 61 13 Upholstered Audience Seating R Complete review and update including sustainability requirements.
Aug-2020 N UFGS 13 34 19 Metal Building Systems R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Aug-2020 A UFGS 13 48 73 Seismic Control For Miscellaneous Equipment C 1 Updated/added UFC reference in second paragraph of subpart 3.6 note and updated last sentence of first text paragraph in response to CCR 8586.
Aug-2020 A UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION and UFGS 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION.
Aug-2020 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 21 13 13.00 20 Wet Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 16 Dry Pipe Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 16.00 20 DRY-PIPE FIRE SPRINKLER SYSTEMS and UFGS 21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION.
Aug-2020 N UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems D Superseded by UFGS 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection D Superseded by UFGS 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 18 Preaction Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION.
Aug-2020 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection D Superseded by UFGS 21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 21 13 19 Deluge Sprinkler Systems, Fire Protection N New unified section superseding UFGS 21 13 19.00 20 [DELUGE] [PREACTION] FIRE SPRINKLER SYSTEMS.
Aug-2020 N UFGS 21 13 19.00 20 [Deluge] [Preaction] Fire Sprinkler Systems D Superseded by UFGS 21 13 19 DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 22 33 30.00 10 Solar Water Heating Equipment R Complete review and update.
Aug-2020 A UFGS 23 05 48.19 [Seismic] Bracing for HVAC C 2 Added reference to UFC 3-301-02 to various subparts in response to CCR 8761.
Aug-2020 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment D Superseded by UFGS 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 00.00 10 Fire Detection and Alarm System, Direct Current Loop D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and revised UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 N UFGS 28 31 49 Carbon Monoxide Detectors D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 60 Interior Fire Alarm System, Non-Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 N UFGS 28 31 63.00 20 Analog/Addressable Interior Fire Alarm System D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 64.00 10 Fire Detection and Alarm System, Addressable D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 66 Interior Fire Alarm And Mass Notification System, Non-Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 A UFGS 28 31 70 Interior Fire Alarm System, Addressable N New unified section replacing/consolidating UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP; UFGS 28 31 49 CARBON MONOXIDE DETECTORS; UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM; UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM.
Aug-2020 N UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System D Superseded by new unified sections: UFGS 28 31 60 INTERIOR FIRE ALARM SYSTEM, NON-ADDRESSABLE; UFGS 28 31 66 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, NON-ADDRESSABLE; UFGS 28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE; and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 28 31 76 Interior Fire Alarm and Mass Notification System, Addressable R Completely new section replacing/consolidating (previous) UFGS 28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM and UFGS 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, UFGS 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP, UFGS 28 31 49 CARBON MONOXIDE DETECTORS, UFGS 28 31 63.00 20 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM, and UFGS 28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE.
Aug-2020 N UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads D Superseded by UFGS 32 11 33.13 PORTLAND CEMENT-STABILIZED BASE COURSES Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Complete review and update.
Aug-2020 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Complete review and update.
Aug-2020 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly R Complete review and update.
Aug-2020 A UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures C 1 Deleted third paragraph of subpart 1.8.3 in response to CCR 7032.
Aug-2020 A UFGS 35 20 23 Dredging R Complete review and update. PA changed from NAVFAC to USACE.
Aug-2020 A UFGS 35 42 34 Reinforced Soil Slope R Complete review and update.
Aug-2020 N UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment N New Unified Section; Superseding UFGS 44 41 00.00 20 WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT
Aug-2020 N UFGS 44 41 00.00 20 Water Pollution Containment and Cleanup Equipment D Superseded by unified section UFGS 44 41 00 WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2020 A UFGS 48 06 15 Turbine Oil R Complete review and update.
May-2020 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 35 26 Governmental Safety Requirements C 9 In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. A link to the contractor safety self-evaluation checklist has been added to Contractor Safety Self-Evaluation Checklist (para 1.5).
May-2020 N UFGS 01 45 00.00 20 Quality Control C 6 Added information under QC Manager Duties (1.5.1.1) as well as new paragraph "QC for [Secure Space][Controlled Area][Sound Rated] Perimeter Construction" (1.5.12) to ensure that the government Site Security Manager is involved with the inspection process early on when accreditation is required by ICD/ICS 705 and that the contractor follow a formal process for the inspection and acceptance of secure spaces, controlled areas and sound rated assemblies. Also, in response to the following: CCR 6711, clarified Note in paragraph Laboratory Accreditation Authorities (1.12.2) to include Design Manager (DM); and CCR 6867, updated to ensure duplicate technical commissioning requirements were removed.