UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2013 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type C 1 Revised subpart 2.5.3 and 2.6.2.2
Nov-2013 N UFGS 33 52 90.00 20 Welding for POL Service Piping C 1 Revised subpart 3.3
Nov-2013 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators C 1 Revised subpart 3.2
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2013 N UFGS 01 35 26 Governmental Safety Requirements C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
Aug-2013 N UFGS 06 13 33 Pier Timberwork C 1 Modified subpart 2.1.1.2
Aug-2013 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 1 Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg
Aug-2013 A UFGS 07 84 00 Firestopping C 1 Industry input
Aug-2013 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 Modified notes before Part 1 and in subpart 3.6
Aug-2013 A UFGS 21 30 00 Fire Pumps C 1 CCR 1147, fuel piping specified by NFPA 20
Aug-2013 N UFGS 26 27 29 Marina Electrical Work C 1 Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note)
Aug-2013 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Modified subparts 1.5 and 3.5 (notes)
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 2 Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3
Aug-2013 N UFGS 46 23 00 Grit Removal and Handling Equipment C 1 Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6
May-2013 N UFGS 03 45 00 Precast Architectural Concrete C 1 Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9
May-2013 N UFGS 05 21 19 Open Web Steel Joist Framing C 1 Modified subpart 2.2.1
May-2013 N UFGS 07 21 13 Board and Block Insulation C 1 modified subpart 1.3
May-2013 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 21 23 Loose Fill Thermal Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 22 00 Roof and Deck Insulation C 1 Modified subpart 1.4.3
May-2013 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 1 modified subpart 1.5.10
May-2013 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 1 modified subpart 1.4.6
May-2013 N UFGS 08 14 00 Wood Doors C 1 Modified subpart1.3
May-2013 N UFGS 08 36 13 Sectional Overhead Doors C 1 Modified subparts 2.2, 2.3, 2.4.1, 2.4.1.1, 2.4.3, 2.5.1, 2.6.4, 2.7
May-2013 N UFGS 09 23 00 Gypsum Plastering C 1 modified subpart 1.3.2
May-2013 N UFGS 09 26 00 Veneer Plaster C 1 Modified subpart 1.4
May-2013 N UFGS 09 29 00 Gypsum Board C 1 Modified subpart 1.3
May-2013 N UFGS 09 64 00 Portable (Demountable) Wood Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 64 66 Wood Athletic Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 90 00 Paints and Coatings C 1 modified subpart 1.4.4
May-2013 N UFGS 10 22 13 Wire Mesh Partitions C 1 modified subpart 1.4
May-2013 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 modified subpart 1.3.4
May-2013 N UFGS 10 22 26.23 Coiling Partitions C 1 modified subpart 1.4
May-2013 N UFGS 12 22 00 Curtains and Drapes C 1 modified subpart 1.5
May-2013 A UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Updated references to sections and paragraphs of ASME A17.1/CSA B44
May-2013 N UFGS 22 00 00 Plumbing, General Purpose C 1 modified subpart 2.1
May-2013 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added the option for pneumatic or electric damper operator
May-2013 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 1 modified subpart 1.4.5.3
May-2013 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 1 modified subparts 2.1.1.11, 2.2 and 2.4.3
May-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) C 1 Inserted NOTES on Impressed Current Anodes and Anode Installation
May-2013 A UFGS 33 40 00 Stormwater Utilities C 2 Added requirements for use of Polypropylene (PP) Pipe
Feb-2013 A UFGS 09 65 00 Resilient Flooring C 1 Adjusted sustainability requirements
Feb-2013 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 23 11 25 Facility Gas Piping C 1 Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements
Feb-2013 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 1 Modified subpart 1.6 and notes before part 1
Feb-2013 N UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines C 1 Removed fiberglass piping, and added CSST and EFV
Feb-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 1 Modified subpart 2.7.3.1
Feb-2013 N UFGS 46 43 21 Circular Clarifier Equipment C 2 Modified subpart 2.2.3.2
Nov-2012 S UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Modified subparts 1.4 and 1.4 to add Primavera P6
Nov-2012 S UFGS 01 33 00 Submittal Procedures C 2 In the last paragraph of the General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag
Nov-2012 A UFGS 01 45 35 Special Inspections C 1 Section title change only; formerly SPECIAL INSPECTION FOR SEISMIC- RESISTING SYSTEMS
Nov-2012 S UFGS 03 62 16 Metallic Non-Shrink Grouting C 1 There was an incomplete statement in Subpart 2.1, which has been corrected
Nov-2012 A UFGS 04 20 00 Unit Masonry C 1 CCR: 2299: Added provisions for telescoping bar positioners
Nov-2012 S UFGS 05 14 00.13 Welding Structural Aluminum Framing C 2 Updated CSI Section Format per latest UFC 1-300-02, - Added Subpart 1.3, deleted Subpart 1.4
Nov-2012 S UFGS 05 52 00 Metal Railings C 2 Imperative language
Nov-2012 S UFGS 07 41 63 Fabricated Roof Panel Assemblies C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes
Nov-2012 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes
Nov-2012 A UFGS 08 33 13 Coiling Counter Doors C 2 CCR 1919: added test tags and warranty submittal
Nov-2012 S UFGS 08 33 23 Overhead Coiling Doors C 1 Updated Section Format per latest UFC 1-300-02,removed text (redundant) text from Submittal Article and located info in body of the text in the appropriate Part; added testing tags at several locations.
Nov-2012 A UFGS 08 34 59 Vault Doors and Day Gates C 1 Added Sustainability Requirements
Nov-2012 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes.
Nov-2012 A UFGS 09 24 23 Cement Stucco C 1 Added Sustainability Requirements
Nov-2012 S UFGS 09 23 82 Fireproof Gypsum Plastering C 1 Updated CSI Section Format per latest UFC 1-300-02; added Subpart 1.2,1.2.1
Nov-2012 S UFGS 09 67 23.13 Standard Resinous Flooring C 1 Updated CSI Section Format per latest UFC 1-300-02; modified Submittal Article; modified titles in Subpart 3.2.4, 3.3.1, 3.3.2 and 3.3, other minor revisions
Nov-2012 S UFGS 12 36 00 Countertops C 2 Modified Submittal Article; minor revisions
Nov-2012 S UFGS 12 48 13.13 Entrance Floor Mats C 2 Imperative language
Nov-2012 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping C 1 Modified Submittal Article; minor revisions
Nov-2012 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment C 2 Modified Submittal Article; minor changes to the heading titles in table to resolve the issues of the CCR #589; imperative language; added some TST tags
Dec-2012 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 2 INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section.
Nov-2012 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 1 CCR 836: deleted aboveground cold pipe phenolic insulation
Nov-2012 S UFGS 23 22 23.00 40 Steam Condensate Pumps C 2 Submittal Article compliance, deleted Subpart 1.3.1, added Subpart 1.4, 1.4.1, 1.4.2; imperative language
Nov-2012 S UFGS 23 36 00.00 40 Air Terminal Units C 1 Modified Submittal Article; imperative language; minor revisions
Nov-2012 S UFGS 23 37 13.00 40 Diffusers, Registers, and Grills C 1 Submittal Article compliance
Nov-2012 S UFGS 23 41 13.00 40 Panel Filters C 1 Submittal Article compliance
Nov-2012 S UFGS 26 53 00.00 40 Exit Signs C 1 Submittal Article compliance, title change in Subpart 1.2, added Subpart 1.2.1; imperative language
Nov-2012 S UFGS 27 21 00.00 40 Intercommunication System C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; modified text in General Not and Part 1, deleted Subpart 1.2, 1.3, 1.3.1, 1.3.2, 1.3.3,added Subpart 2.1 - 2.1.1.3, modified 2.2.4 - 2.2.4.2; Submittal Article compliance, Imperative language
Nov-2012 S UFGS 32 31 13 Chain Link Fences and Gates C 1 CCR #893 - modified Subpart 2.5, 2.18; CCR #2148 - modified Subpart 3.19
Nov-2012 N UFGS 33 11 00 Water Utility Distribution Piping C 1 Modified subpart 3.1.1.1; added AWWA C515 throughout
Nov-2012 N UFGS 33 71 02.00 20 Underground Electrical Distribution C 1 Modified subpart 1.4.2
Nov-2012 S UFGS 40 17 30.00 40 Welding General Piping C 1 Tri-Annual Database Maintenance and the revisions are minor - modified Subpart 1.3.1, 1.5, 3.1.1.2, 3.2.1, 3.3, 3.3.1
Nov-2012 A UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas C 1 Replace reference to ASA S2.19 with ISO 1940-1
Nov-2012 N UFGS 46 43 21 Circular Clarifier Equipment C 1 Removed note before Part 1; modified note in subpart 2.2.1
Aug-2012 S UFGS 01 30 00 Administrative Requirements C 1 Modified subpart 1.10
Aug-2012 S UFGS 01 33 00 Submittal Procedures C 1 Per Action Item 41, inserted a Note into subparts 1.4.1, 1.4.3, 1.11.4, where users can obtain the Section 01 33 16; Replace the CONSTRUCTION tailoring option tag with DESIGN-BID- BUILD in subparts 1.1, 1.2.1, 1.4.2, 1.4.6, 1.10.4.1, 1.14, 1.16
Aug-2012 N UFGS 01 35 26 Governmental Safety Requirements C 1 Modified subpart 1.7
Aug-2012 N UFGS 01 78 23 Operation and Maintenance Data C 1 Modified subparts 1.2, 1.2.2, 1.2.3, 1.2.4 and 1.4-g
Aug-2012 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made.
Aug-2012 S UFGS 03 47 13 Tilt-Up Concrete C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made
Aug-2012 N UFGS 05 12 00 Structural Steel C 1 Modified subparts 1.6.2.1, 2.2.4.1, 3.2.1, 3.3, 3.9.3, 3.9.4.2
Aug-2012 S UFGS 05 14 00.13 Welding Structural Aluminum Framing C 1 Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made
Aug-2012 N UFGS 05 30 00 Steel Decks C 1 Removed subparts 2.3.3 Open Beam... and 3.3 Joint Sealing for Roof Decks; modified subpart 3.2.4.6

Pages