UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2023 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C 1 Incorporated various CCRs.
Nov-2023 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Superseding UFGS-41 24 26 HYDRAULIC POWER SYSTEMS. Complete review and update.
Nov-2023 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures R Complete review and update.
Nov-2023 A UFGS 35 31 19.20 Articulating Concrete Block Revetments R Complete review and update.
Nov-2023 A UFGS 41 24 26 Hydraulic Power Systems D Superseded by UFGS-35 05 40.14 10 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES.
Nov-2023 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment C 2 In response to CCR 13074, updated to imperative mood; removed "shall" from the Section text.
Nov-2023 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Aug-2023 N UFGS 01 30 00 Administrative Requirements C 3 Revised benchmarks for NAVFAC partnering based on 11013.40B
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) R Complete refresh of the Section to coincide with the 15.2 update of the system; added "(eCMS)" to Section title
Aug-2023 A UFGS 01 32 01.00 10 Project Schedule R Complete review and update.
Aug-2023 N UFGS 01 35 26 Governmental Safety Requirements C 4 In response to CCR 11849, "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17) has been relocated to this section from UFGS-01 45 00 QUALITY CONTROL. The references and submittals have also been updated to correspond with this new Article.
Aug-2023 A UFGS 01 42 00 Sources for Reference Publications C 1 Incorporated new organization Cool Roof Rating Council (CRRC)
Aug-2023 N UFGS 01 45 00 Quality Control N Unified Section superseding UFGS-01 45 00.00 10 QUALITY CONTROL (Army), UFGS-01 45 00.00 20 QUALITY CONTROL (Navy), and UFGS-01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
Aug-2023 A UFGS 01 45 00.00 10 Quality Control D Superseded by UFGS 01 45 00 QUALITY CONTROL. "Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives."
Aug-2023 N UFGS 01 45 00.00 20 Quality Control D Superseded by Unified UFGS-01 45 00 QUALITY CONTROL Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 01 45 00.00 40 Quality Control R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 01 45 00.10 20 Quality Control for Minor Construction D Superseded by Unified UFGS-01 45 00 QUALITY CONTROL Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 01 91 00.15 Building Commissioning C 1 Clarified the language in COMMISSIONING FIRM paragraph (1.11)
Aug-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 5 In response to the following CCRs: 12710 - updated requirements in Testing Concrete Structure for Strength (1.14.3.9 - item d.); 12783 - updated Mixing (3.6.2) to align with current ASTM C94 and ACI 301; 12993 - updated table in Properties and Requirements (2.5.1, item i.) under column 'Miscellaneous Requirements,' row 'Lightweight concrete suspended slab' changed units to pounds per cubic foot; 13132 - updated submittal item to "Quality Control Program"; and 13205 - updated test intervals/requirements in paragraphs Slump Tests (3.14.3.1) and Compressive Strength Tests (3.14.3.3).
Aug-2023 A UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 41 33 Precast Structural Pretensioned Concrete C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 47 13 Tilt-Up Concrete C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 S UFGS 03 62 16 Metallic Non-Shrink Grouting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 05 14 00.13 Welding Structural Aluminum Framing C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 S UFGS 05 51 00 Metal Stairs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5458, 7328, 11237
Aug-2023 S UFGS 05 52 00 Metal Railings R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 11143
Aug-2023 S UFGS 05 72 00 Decorative Metal Specialties R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 18 00 Glued-Laminated Construction R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 10243
Aug-2023 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 07 11 13 Bituminous Dampproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 14 00 Fluid-Applied Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 16 19 Metallic Oxide Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 19 00 Water Repellents R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 13 Board and Block Insulation R Complete review and update
Aug-2023 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 23 Loose Fill Thermal Insulation R Complete review and update
Aug-2023 N UFGS 07 22 00 Roof and Deck Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 27 10 Building Air Barrier System N Superseding UFGS 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM. Complete review and update, to include section number chage (unification). Incorporated CCRs #5650, 9348, 12613
Aug-2023 A UFGS 07 27 10.00 10 Building Air Barrier System D Superseded by UFGS 07 27 10 BUILDING AIR BARRIER SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 07 27 19.01 Self-Adhering Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 26 Fluid-Applied Membrane Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 36 Spray Foam Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Complete review and update.
Aug-2023 N UFGS 07 60 00 Flashing and Sheet Metal R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 72 20 Gravity-Type Roof Ventilators R Complete review and update.
Aug-2023 N UFGS 07 92 00 Joint Sealants R Complete review and update including the incorporation of CCRs.
Aug-2023 S UFGS 12 48 13 Entrance Floor Mats and Frames R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 01 30.41 HVAC System Cleaning C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 05 15 Common Piping for HVAC C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems C 1 Incorporated various CCRs.
Aug-2023 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 26 05 73 Power System Studies N Superseding UFGS 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION. New UFGS section.
Aug-2023 N UFGS 26 20 00 Interior Distribution System R Complete review and update to incorporate CCRs
Aug-2023 A UFGS 26 28 01.00 10 Coordinated Power System Protection D Superseded by UFGS 26 05 73 POWER SYSTEM STUDIES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 9563
Aug-2023 N UFGS 26 41 00 Lightning Protection System R Complete review and update based on CCRs and age of the document.
Aug-2023 S UFGS 26 52 00.00 40 Emergency Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 26 53 00.00 40 Exit Signs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5180, 7562
Aug-2023 S UFGS 26 55 53 Security Lighting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 28 08 10 Electronic Security System Acceptance Testing R Complete review and update.
Aug-2023 N UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators D Superseded by 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 32 Fire Alarm Reporting System, Digital Communicator Type N Superseding UFGS 28 31 02.00 20 COORDINATED POWER SYSTEM PROTECTION and UFGS 28 31 75.00 10 CENTRAL FIRE ALARM SYSTEM, DIGITAL ALARM COMMUNICATOR TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33 Fire Alarm Reporting System, Radio Type N Superseding UFGS 28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE and UFGS 28 31 33.13 20 EXTERIOR FIRE REPORTING SYSTEM, RADIO TYPE. New UFGS section.
Aug-2023 A UFGS 28 31 33.00 10 Fire Alarm Reporting System, Radio Type D Superseded by UFGS 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type D Superseded by 28 31 33 FIRE ALARM REPORTING SYSTEM, RADIO TYPE Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type D Section has been Archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 28 31 75.00 10 Central Fire Alarm System, Digital Alarm Communicator Type D Superseded by UFGS 28 31 32 FIRE ALARM REPORTING SYSTEM, DIGITAL COMMUNICATOR TYPE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 31 00 00 Earthwork R Superseding UFGS 31 23 00.00 20 EXCAVATION AND FILL. Complete review and update.
Aug-2023 N UFGS 31 23 00.00 20 Excavation and Fill D Superseded by 31 00 00 EARTHWORK Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 A UFGS 32 13 14.14 Concrete Paving for Small Airfield Projects N New UFGS Section.
Aug-2023 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 1 Incorporated various CCRs
Aug-2023 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 3 Incorporated various CCRs
May-2023 N UFGS 01 78 23 Operation and Maintenance Data R Revised throughout to unify Army and Navy requirements of Operation and Maintenance Manuals that were previously in this Section and in UFGS-01 78 24.00 10 and UFGS-01 78 24.00 20. Incorporated industry standards for the Operation and Maintenance Manual organization.
May-2023 A UFGS 01 78 24.00 10 Facility Data Requirements R Non-technical revision to update the Target Refresh Date.
May-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Removed Operation and Maintenance Manual requirements throughout, this content has been incorporated into UFGS 01 78 23. Only Facility Data Workbook requirements remain in this section. Section Title changed from FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) to FACILITY DATA WORKBOOK (FDW).
May-2023 A UFGS 01 91 00.15 10 Total Building Commissioning D Section Archived; 01 91 00.15 10 has been superseded by Unified Section UFGS-01 91 00.15 BUILDING COMMISSIONING Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 20 Total Building Commissioning D Superseded by unified UFGS-01 91 00.15 BUILDING COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 Building Commissioning N Section number has been reinstated with the unification of Army and Navy Commissioning Sections. This new version supersedes UFGS-01 91 00.15 10 and UFGS-01 91 00.15 20 TOTAL BUILDING COMMISSIONING. Title has been changed to BUILDING COMMISSIONING.
May-2023 A UFGS 01 91 19 Building Enclosure Commissioning N New UFGS section superseding UFGS 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2023 A UFGS 02 42 51 Carpet Removal and Reclamation C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness D Superseded by UFGS 01 91 19 BUILDING ENCLOSURE COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 07 41 63 Fabricated Roof Panel Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 N UFGS 08 11 69 Metal Storm Doors D Section has been archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 08 33 23 Overhead Coiling Doors C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 08 34 73 Sound Control Door Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 A UFGS 09 23 82 Fireproof Gypsum Plastering C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 67 23.13 Standard Resinous Flooring C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 96 00 High-Performance Coatings C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 10 44 16 Fire Extinguishers C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 N UFGS 23 08 00 Commissioning of Mechanical[ and Plumbing] Systems N Unified Section superseding UFGS-23 08 00.00 20 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS.
May-2023 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems D Superseded by unified UFGS-23 08 00 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers R Complete life cycle review. Updated technical requirements, references, formatting.