UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Aug-2015 N UFGS 23 76 00.00 20 Evaporative Cooling System C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 23.00 20 Computer Room Air Conditioning Units C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 23 82 00.00 20 Terminal Heating Units C 2 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Aug-2015 N UFGS 31 23 00.00 20 Excavation and Fill C 2 In response to CCR 4371: reference update
Nov-2014 N UFGS 31 62 19 Timber Piles C 2 Changed Section Reference 00 41 00 BID SCHEDULES to Section Reference 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
Feb-2014 A UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems C 1 QC Checklist in APPENDIX A made available in electronic format for use with this section at: http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf
May-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
May-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
May-2015 S UFGS 01 33 00 Submittal Procedures C 6 Subpart 1.2.1, under SD-11, deleted the mention of DD Form 1354; Subpart 1.4.7, corrected typo, changed tittle to Sustainability Reporting Submittals (S), revised the 1st and 2nd paragraph ; added Sub[art 1.6.10, 1.6.10.1 and 1.6.11; Subpart 1.11.1, revised paragraph; added paragraph "j." to Subpart 1.11.3; Subpart 1.13, added the word "Contract" prior to the word clause, entitled "Changes.".
May-2015 A UFGS 01 45 00.00 10 Quality Control C 1 Add requirements to coordinate with Section 01 45 35 SPECIAL INSPECTIONS
May-2015 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 CCR 4158: Updated Fencing Paragraph a. to height requirements in EM 385-1-1.
May-2015 A UFGS 01 74 19 Construction Waste Management and Disposal C 2 Revised required diversion to 60%
May-2015 A UFGS 01 78 00 Closeout Submittals C 1 Incorporates multiple approved CCRs.
May-2015 N UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control C 1 CCR 985 and CCR 2715: Revised technical note in subpart 1.4.5 by deleting UFC 3-450-02 and replacing P-355 with UFC 3-310-04. Revised technical note in subparts 1.4.6, 1.4.6.2, and Part 2 by replacing DM 3.10 with UFC 3-450-01.
May-2015 N UFGS 23 22 26.00 20 Steam System and Terminal Units C 1 CCR 2840 - removed technical note in subpart 2.6
May-2015 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 2 Modified subparts 2.2.2, 2.2.2.4, 2.6.3, and 3.1.4.4 to show grooved connections are not used on NAVFAC projects.
May-2013 N UFGS 05 21 23 Steel Joist Girder Framing C 1 modified subpart 2.2.1
Nov-2012 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC C 2 Submittal Article compliance; minor revisions
Aug-2012 S UFGS 01 75 00 Starting and Adjusting C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 A UFGS 08 33 13 Coiling Counter Doors C 1 Updated paragraph LOCKS
Aug-2012 N UFGS 08 34 16.20 Vertical Lift Fabric Doors C 1 Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12
Aug-2012 N UFGS 08 81 00 Glazing C 1 Modified subpart 2.4.8
Aug-2012 S UFGS 12 36 00 Countertops C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 S UFGS 12 48 13.13 Entrance Floor Mats C 1 Updated Imperative Language and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC C 1 Updated Imperative Language, cleaning up the Submittal Article; and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 22 23.00 40 Steam Condensate Pumps C 1 Updated Imperative Language, cleaning up the Submittal Article; and minor changes; no technical content changes have been made
Aug-2012 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment C 1 Per CCR 1798, subpart 2.1 - revised Chapter No, per CCR 589 made some changes to the "headings" in the tables due to comment in CCR in the following subparts: 2.2.1 - 2.2.6, 2.2.9 - 2.2.11
Aug-2012 A UFGS 26 41 01.00 10 Lightning Protection System C 1 Per CCR 1748, changed "counterpoise" to "ground ring"
Aug-2012 N UFGS 35 59 13.14 20 Polymeric Piles C 1 Modified subparts: 1.3, 2.1, 2.4, 2.4.1 and 2.4.2
Aug-2012 N UFGS 35 59 13.16 Extruded and Molded Marine Fenders C 1 Modified subparts 2.3.1, 2.3.3, 2.3.3.1, 2.3.4.2, 2.3.4.3, 2.3.6, 2.3.6.4, 3.3
Aug-2018 A UFGS 01 91 00.15 Building Commissioning C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 01 74 19 Construction Waste Management and Disposal C 3 Revised submittal classifications in response to CCR 6535.
Aug-2018 A UFGS 03 23 00 Stressed Tendon Reinforcing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 06 61 16 Solid Surfacing Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 07 54 19 Polyvinyl Chloride Roofing C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 24 23 Cement Stucco C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 51 00 Acoustical Ceilings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 62 38 Static-Control Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 64 23 Wood Parquet Flooring C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 64 29 Wood Strip and Plank Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 65 00 Resilient Flooring C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 65 66 Resilient Athletic Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 13 Portland Cement Terrazzo Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 16 Terrazzo Floor Tile C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 66 23 Resinous Matrix Terrazzo Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 67 23.14 Chemical Resistant Resinous Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 68 00 Carpeting C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 69 13 Rigid Grid Access Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 69 19 Stringerless Access Flooring C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 72 00 Wallcoverings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 09 84 20 Acoustical Wall Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 11 00 Visual Display Units C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 14 00.20 Interior Signage C 1 Added bracketed item to paragraph 1.4.1 in response to CCR 6638.
Aug-2018 A UFGS 10 21 13 Toilet Compartments C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 19 Demountable and Moveable Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 39 Folding Panel Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 22 43 Sliding Partitions C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 26 00 Wall and Door Protection C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 10 28 13 Toilet Accessories C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 44 00 Food Cooking Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 47 00 Ice Machines C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 11 68 13 Playground Equipment C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 21 00 Window Blinds C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 24 13 Roller Window Shades C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 39 Commercial Kitchen Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 35 70 Healthcare Casework C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 59 00 Systems Furniture C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 61 13 Upholstered Audience Seating C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 12 93 00 Site Furnishings C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 22 00 70 Plumbing for Healthcare Facilities C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 23 09 00 Instrumentation and Control for HVAC C 2 Corrected tailoring tags in response to CCR 6663.
Aug-2018 A UFGS 23 52 00 Heating Boilers C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 A UFGS 32 17 23 Pavement Markings C 4 Incorporated changes based on directions of the NDAA.
Aug-2018 F UFGS 26 27 13.10 30 Electric Meters C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 01 14 00 Work Restrictions C 5 Removal of reference in para 1.6 to cancelled FAC.
Aug-2018 N UFGS 01 33 29 Sustainability Requirements and Reporting C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 03 30 00 Cast-In-Place Concrete C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 30 00 Steel Decks C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 40 00 Cold-Formed Metal Framing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 05 50 13 Miscellaneous Metal Fabrications C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 06 10 00 Rough Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 06 20 00 Finish Carpentry C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 13 Board and Block Insulation C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 21 23 Loose Fill Thermal Insulation C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 22 00 Roof and Deck Insulation C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 24 00 Exterior Insulation and Finish Systems C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 19.01 Self-Adhering Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 26 Fluid-Applied Membrane Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 27 36 Spray Foam Air Barriers C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 31 13 Asphalt Shingles C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 41 13 Metal Roof Panels C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 51 13 Built-Up Asphalt Roofing C 1 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2018 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Pages