UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort descending Action Change # Nature of Change or Revision
Oct-2007 S UFGS 01 31 19.00 40 D Redundant, section deleted. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2022 A UFGS 01 31 20 Project Technical Data Management and Visualization N New UFGS
Jan-2008 N UFGS 01 31 23 Web-Based Construction Management (WEBCM) D No longer a requirement to use. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2017 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Changed submittal period of Personnel List, personnel roles, and removed Certified Payrolls, Invoice, and Routine Correspondence from Table 1; Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
May-2018 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 2 Incorporation of eCMS Transmittal function into Table 1.
May-2017 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) N New Section
Nov-2019 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 3 In response to CCR 7497, brackets were added to the paragraph Field Administration (1.4.3) and the text was updated to clarify the disposition of the tablet computer.
Feb-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 4 In response to CCR 7810, paragraphs CONTRACT ADMINISTRATION (1.1), Information Security Classification/Identification (1.6.1), and Table 1 revised to clarify the procedure when documentation exists outside of the eCMS environment and a request is made to the contractor to provide as final project documentation.
Aug-2020 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 5 In response to CCR 8821, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01
Feb-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 6 In response to CCRs 9429 and 9621, removed reference to DoD Manual 5200.01-V4 and all FOUO designations; replaced "FOUO - For Official Use Only" with "CUI Controlled Unclassified Information" throughout; and changed CLASS heading in Table 1 to "DESIG" (designation).
Nov-2021 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 7 In response to CCR 11022, updated requirements for jobsite computer tablet in the Field Administration paragraph, and CCR 11023, updated the Contract Administration paragraph to clarify eCMS file storage structure. Also added minimum download and upload speeds to paragraph 1.4.1 General.
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) R Complete refresh of the Section to coincide with the 15.2 update of the system; added "(eCMS)" to Section title
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Updated language in Loss of Privilege (1.2.3) and RFIs Module (1.6.3) paragraphs
Feb-2015 A UFGS 01 32 01.00 10 Project Schedule R Complete Section review and refresh
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2008 A UFGS 01 32 01.00 10 Project Schedule R Minor corrections throughout
Jul-2007 A UFGS 01 32 01.00 10 Project Schedule R Revised in response to CCRs 1117 and 1120; submittal paragraph added
Jan-2007 A UFGS 01 32 01.00 10 Project Schedule R Added Design-Build tailoring option
Oct-2006 A UFGS 01 32 01.00 10 Project Schedule R Digital media and design-build added
Aug-2023 A UFGS 01 32 01.00 10 Project Schedule R Complete review and update.
Nov-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
Feb-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.
Nov-2009 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Major revision
May-2015 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
Aug-2018 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules R Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.
Aug-2020 N UFGS 01 32 16.00 20 Small Project Construction Progress Schedules C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Nov-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays
Feb-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Title changed from NETWORK ANALYSIS SCHEDULES (NAS); thoroughly revised to Primavera P6, Updated WBS & Activity Codes and Settings.
May-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Combined with Design-Build Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities, and Time Impact Analysis. Added Commissioning Activities.
Aug-2010 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Revised first note in subpart 1.6.2.5
Dec-2009 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R INTERIM RELEASE: Section revised
Nov-2009 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Major revision
Nov-2012 S UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Modified subparts 1.4 and 1.4 to add Primavera P6
Nov-2008 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Deleted requirements for WEBCM
May-2015 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
Jan-2007 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section.
Nov-2018 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Corrected notes and paragraphs, for DB and DBB, on Baseline NAS submittals and requirements.
Aug-2019 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 2 Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.
Aug-2020 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 3 In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).
Nov-2023 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Complete review and update. Added new Related Materials: "Contractor Baseline Schedule General Commissioning/HVAC Review Checklist"
May-2016 S UFGS 01 33 00 Submittal Procedures C 8 Revised the following three subparts, 1.4.1, 1.4.3, 1.11.4, due to releasing Section 01 33 16.00 10 DESIGN DATA [DESIGN AFTER AWARDS] for use on USACE Design-Build projects only.
May-2011 S UFGS 01 33 00 Submittal Procedures R CCR 808: Inserted 1.1 SUMMARY inside of an Army tailoring tag
Feb-2016 S UFGS 01 33 00 Submittal Procedures C 7 Incorporated outstanding CCR's.
Feb-2015 S UFGS 01 33 00 Submittal Procedures C 5 Per USACE request, adjusted the Note in the following subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but can't get the file, Section 01 33 16 Design After Award is not a UFGS Section.
Feb-2010 S UFGS 01 33 00 Submittal Procedures R Minor revisions
Nov-2014 S UFGS 01 33 00 Submittal Procedures C 4 Tri-Annual Database Maintenance (TADM), which consists of: Tailoring changes, incorporation of Sustainability requirements, CCR's and verification of all reports and spelling.
Jun-2010 S UFGS 01 33 00 Submittal Procedures R INTERIM RELEASE: added tailoring for "Construction" in subpart 1.1.1 under SD-01; added tailoring option for "Army" in subpart 1.1.3; other minor revisions in subparts 1.3.5, 1.8, 1.8.1, 1.8.2, and 1.8.3
May-2010 S UFGS 01 33 00 Submittal Procedures R Revised subpart 1.5.4 and 1.5.9; revised note in 1.8.2 and 1.9; minor revision in article 1.14
Feb-2009 S UFGS 01 33 00 Submittal Procedures R Updated Standard Submittal Note
Jan-2008 S UFGS 01 33 00 Submittal Procedures R Updated Criteria; Preparing Activity changed to NASA
Nov-2013 S UFGS 01 33 00 Submittal Procedures C 3 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2
Nov-2012 S UFGS 01 33 00 Submittal Procedures C 2 In the last paragraph of the General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag
Aug-2012 S UFGS 01 33 00 Submittal Procedures C 1 Per Action Item 41, inserted a Note into subparts 1.4.1, 1.4.3, 1.11.4, where users can obtain the Section 01 33 16; Replace the CONSTRUCTION tailoring option tag with DESIGN-BID- BUILD in subparts 1.1, 1.2.1, 1.4.2, 1.4.6, 1.10.4.1, 1.14, 1.16
Nov-2008 S UFGS 01 33 00 Submittal Procedures R Edits from USACE
Aug-2017 S UFGS 01 33 00 Submittal Procedures C 10 Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military construction and military family housing activities.: Changed MSDS to SDS
Nov-2016 S UFGS 01 33 00 Submittal Procedures C 9 Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
May-2015 S UFGS 01 33 00 Submittal Procedures C 6 Subpart 1.2.1, under SD-11, deleted the mention of DD Form 1354; Subpart 1.4.7, corrected typo, changed tittle to Sustainability Reporting Submittals (S), revised the 1st and 2nd paragraph ; added Sub[art 1.6.10, 1.6.10.1 and 1.6.11; Subpart 1.11.1, revised paragraph; added paragraph "j." to Subpart 1.11.3; Subpart 1.13, added the word "Contract" prior to the word clause, entitled "Changes.".
Feb-2011 S UFGS 01 33 00 Submittal Procedures R Revised subpart 1.9.4; added subpart 1.9.4.1, 1.9.4.2; minor revisions throughout; tailoring tags were corrected; CCR #82 / CCR #340 - comments were incorporated
Oct-2006 N UFGS 01 33 00 Submittal Procedures R Deleted unnecessary reference.
Jul-2006 S UFGS 01 33 00 Submittal Procedures R Added sustainable design requirements
Aug-2018 S UFGS 01 33 00 Submittal Procedures R Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Nov-2018 S UFGS 01 33 00 Submittal Procedures C 1 Submittal Note updated and tailoring changes.
Feb-2019 S UFGS 01 33 00 Submittal Procedures C 2 In response to CCR's 7173, 7174, 7175, 7176, 7177, and 7123. 02/28/19 INTERIM RELEASE: This section was updated in response to CCR's 7314 and 7315 - the banner was incorrectly marked and was corrected to indicate Change 2; the command Execute Revisions was run to eliminate formatting elements that displayed in the previous version.
May-2019 S UFGS 01 33 00 Submittal Procedures C 3 Editing Para 1.17
Feb-2021 S UFGS 01 33 00 Submittal Procedures C 4 Incorporation of the following CCRs: Incorporated PPI Information CCR# 7812 - Changed Title to Certification of Submittal in 1.17 CCR# 7894 - Updated paragraph 1.6.1 for non-Army projects CCR# 8991 - Added 23 09 00 to paragraph 1.5.2 CCR# 9026 - Deleted the 2nd sentence in par 1.10.2. Added “For variations that include design changes or some material or product substitutions, the Government may require an evaluation and analysis by a licensed professional engineer hired by the contractor. in para 1.10.1 CCR# 9065 - Deleted Tailoring Notes for 1.4.2.1, 1.4.2.2, 1.4.2.3 and 1.4.2.4. Added note to 1.4.2 CCR# 9073 - Added Section 01 91 00.15 20: Commissioning Plan, Certificate of Readiness, and Commissioning Report" to paragraph 1.5.2 CCR# 9326
Feb-2023 A UFGS 01 33 00 Submittal Procedures C Administrative Change: Preparing Activity changed from NASA to Army.
May-2016 A UFGS 01 33 16.00 10 Design Data (Design After Award) N New UFGS for use on USACE Design-Build projects only
Feb-2010 A UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements N New Section
Aug-2018 A UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements R Complete review and update; Title changed from Aviation Fuel System Submittal Requirements
Feb-2021 A UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements C 1 Deleted redundant drawing sizes from paragraph 1.1.1 in response to CCR 8754 and updated paragraph 2.1.1 in response to CCR 8756.
Nov-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting C 2 Changes are related to Change 01 UFC 1-200-02, and updates.
Feb-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting R Required revisions in order to align with numerous changes in Federal requirements and DOD policy.
Nov-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Alignment with sustainable policies.
Feb-2015 N UFGS 01 33 29 Sustainability Requirements and Reporting R Title changed from SUSTAINABILITY REQUIREMENTS to comply with CSI MasterFormat; Coordination with criteria and corrections throughout section.
Nov-2014 N UFGS 01 33 29 Sustainability Requirements and Reporting N New section superseding previous UFGS 01 33 29 titled LEED Documentation and superseding UFGS 01 33 29.00 20 Sustainable Requirements
Feb-2010 N UFGS 01 33 29 Sustainability Requirements and Reporting R Section References (SRF) update and other minor revisions.
May-2012 N UFGS 01 33 29 Sustainability Requirements and Reporting R Modified note before Part 1 and subparts 1.3 and 1.3.1
Aug-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting C 1 Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).
Aug-2018 N UFGS 01 33 29 Sustainability Requirements and Reporting C 3 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Jul-2006 N UFGS 01 33 29 Sustainability Requirements and Reporting N New section LEED(TM) DOCUMENTATION
Nov-2014 N UFGS 01 33 29 Sustainability Requirements and Reporting D Section titled LEED Documentation replaced/superseded by new UFGS 01 33 29 titled Sustainability Requirements. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2021 N UFGS 01 33 29 Sustainability Requirements and Reporting R Revised to align with industry standards; to align with UFC 1-200-02 revision; to combine DB and DBB requirements into a Tri-Service, tailorable spec; and reorganized paragraphs into hierarchical presentation. Titled changed from "SUSTAINABILITY REPORTING" to "SUSTAINABILITY REQUIREMENTS AND REPORTING"
Nov-2014 N UFGS 01 33 29.00 20 Sustainable Requirements D Superseded by UFGS 01 33 29 Sustainability Requirements. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 N UFGS 01 33 29.00 20 Sustainable Requirements N NEW; Interim change to 01 33 29, LEED DOCUMENTATION, to include the Guiding Principles, for Navy-use only.
Nov-2011 N UFGS 01 35 13 Special Project Procedures R Deleted subpart 3.2.4 "Annual Pearl Harbor Hydrofest"
Apr-2006 N UFGS 01 35 13 Special Project Procedures R Deleted paragraph 3.2.4.
Aug-2019 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 6316, added paragraph to "Schedule of Work/Aircraft Operating Schedules" (3.1.2 ) to define/clarify "Existing Conditions Survey"
Nov-2019 N UFGS 01 35 13 Special Project Procedures C 2 In response to CCR 4579, landing area "clear zones" in paragraph Definitions (1.2) has been updated to correct fixed wing information and add helicopter information.
Nov-2020 N UFGS 01 35 13 Special Project Procedures R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Feb-2022 N UFGS 01 35 13 Special Project Procedures C 1 In response to CCR 9539, specifier notes were added to the Definitions and Airfield Obstruction Lights paragraphs; tailoring was corrected to NAVFAC HI for paragraphs 3.2.3 "RIMPAC", 3.2.4 "December 7, 1941", and 3.2.5 "Pearl Harbor"
Oct-2006 S UFGS 01 35 13.00 40 Special Project Procedures D Section combined with UFGS 01 35 13 Special Project Procedures (Preparing Activity: Navy). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jun-2006 S UFGS 01 35 13.00 40 Special Project Procedures R Reference Update
Aug-2015 A UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites N Scheduled maintenance update of section. Superseding UFGS 01 20 01.00 10 COST AND PERFORMANCE REPORT.
Apr-2008 S UFGS 01 35 23.00 40 Owner Safety Requirements D Superseded by UFGS 01 35 26 Governmental Safety Requirements (Preparing Activity: NAVFAC) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jul-2007 S UFGS 01 35 23.00 40 Owner Safety Requirements R Reference Update
Jun-2006 S UFGS 01 35 23.00 40 Owner Safety Requirements R Title changed from GENERAL SAFETY REQUIREMENTS
Nov-2017 N UFGS 01 35 26 Governmental Safety Requirements C 5 Addition of lockout/tagout requirements when the Government of Utility is involved in the electrical outage
Feb-2017 N UFGS 01 35 26 Governmental Safety Requirements C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Aug-2016 N UFGS 01 35 26 Governmental Safety Requirements C 2 Changed requirements for portable ionizing radiation equipment.