UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PAsort descending UFGS Section Action Change # Nature of Change or Revision
Apr-2008 A UFGS 23 72 26.00 10 Desiccant Cooling Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 23 76 00.00 10 Evaporative Cooling Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 23 82 01.00 10 Warm Air Heating Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 23 82 02.00 10 Unitary Heating and Cooling Equipment R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 01 28 Partial-Depth Patching of Rigid Pavements R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 12 15 Hot-Mix Asphalt (HMA) for Airfields R Revisions throughout
Apr-2008 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements R Revised throughout
Apr-2008 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements R Revised througout
Apr-2008 A UFGS 32 13 73 Compression Joint Seals for Concrete Pavements R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 15 00 Aggregate Surfacing R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 16 13 Concrete Sidewalks and Curbs and Gutters R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 16 15 Concrete Block Pavements R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 17 24.00 10 Pavement Markings R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 18 16.13 Playground Protective Surfacing R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 31 26 Wire Fences and Gates R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall R Compliance with CSI SectionFormat
Apr-2008 A UFGS 32 84 23 Underground Sprinklers R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 16 15 Water Storage Steel Tanks R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 20 00 Water Wells R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 24 13 Groundwater Monitoring Wells R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 26 00.00 10 Relief Wells R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 30 00 Sanitary Sewerage R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 34 00 Force Mains and Inverted Siphons; Sewer R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 34 13 Siphons, Dosing R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 45 00.00 10 Speed Reducers for Storm Water Pumps R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 46 13 Foundation Drainage R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 46 16 Subdrainage Piping R Compliance with CSI SectionFormat
Aug-2014 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 1 Moved execution requirements to Part 3 as noted in CCR 3562
Apr-2008 A UFGS 33 51 03.00 10 Gas Distribution System R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 52 10 Fuel Systems Piping (Service Station) N Superseding UFGS 23 11 13.00 20 Fuel Oil Piping and UFGS 23 11 16.00 20 Fiberglass Reinforced Piping (FRP) Piping (for Petroleum)
Aug-2014 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] C 1 Added FAA requirements as noted in CCR 857
Apr-2008 A UFGS 33 52 44 Aviation Fueling Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 56 53 Compressed Gases Storage Tanks R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 58 00 Leak Detection for Fueling Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 60 00.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 60 01 Valves, Piping, and Equipment in Valve Manholes R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 60 02 Aboveground Heat Distribution System R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 61 00 Prefabricated Underground Heating / Cooling Distribution System R Compliance with CSI SectionFormat
Apr-2008 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System R Compliance with CSI SectionFormat
Aug-2014 A UFGS 03 15 00.00 10 Concrete Accessories C 1 Made corrections as noted in CCR 3836
Apr-2008 A UFGS 33 82 01 Intercommunication System R Compliance with CSI SectionFormat
Apr-2008 A UFGS 34 11 00 Railroad Track and Accessories R Compliance with CSI SectionFormat
Apr-2008 A UFGS 34 41 26.00 10 Access Control Point Control System R Compliance with CSI SectionFormat
Apr-2008 A UFGS 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls R Compliance with CSI SectionFormat
Apr-2008 A UFGS 34 73 13 Aircraft Tiedowns R Compliance with CSI SectionFormat
Aug-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing C 1 Corrected spelling as noted in CCR 3841; made corrections as noted in CCR 3842
Apr-2008 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams R Compliance with CSI SectionFormat
Apr-2008 A UFGS 35 01 42.00 10 Vertical Gate Lift Systems R Compliance with CSI SectionFormat
Apr-2008 A UFGS 35 01 43 Wire Rope for Gate Operating Devices R Compliance with CSI SectionFormat
Apr-2008 A UFGS 35 20 14 Stoplogs R Compliance with CSI SectionFormat
Aug-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 3 Added Energy Star requirements
Aug-2014 A UFGS 23 52 00 Heating Boilers C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Aug-2014 A UFGS 31 41 16 Metal Sheet Piling C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database
Apr-2008 A UFGS 41 22 15.00 10 Overhead Electric Cranes D Superseded by UFGS 41 22 13.13 Bridge Cranes, UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running, UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running, and UFGS 41 22 13.16 Gantry Cranes Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2014 A UFGS 32 32 23 Segmental Concrete Block Retaining Wall C 1 Deleted paragraph as noted in CCR 3331
Aug-2014 A UFGS 33 30 00 Sanitary Sewerage C 2 Made corrections as noted in CCR 1672
Aug-2014 A UFGS 33 40 00 Stormwater Utilities C 3 Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333
Aug-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices C 1 Made minor editorial corrections
Aug-2014 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures C 1 Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.4.1.1, and 1.4.2, this section was deleted from the UFGS Database
Aug-2014 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System C 1 Added paint requirements as noted in CCR 2518
Aug-2014 A UFGS 46 61 00 Filtration Equipment C 1 Added paint requirements as noted in CCR 2519
Aug-2014 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System C 1 Deleted publication as noted in CCR 776
Aug-2014 A UFGS 46 76 23.16 Recessed Chamber Filter Presses C 1 Added paint requirements as noted in CCR 2520
May-2014 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 11 19.00 Insulating Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 15 00.00 10 Concrete Accessories R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 30 00.00 10 Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
Apr-2008 A UFGS 41 22 23.19 10 Monorails with Electric, Air, or Manual Powered Hoist D Superseded by UFGS 41 22 23.19 Monorail Hoists Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas R Compliance with CSI SectionFormat
Apr-2008 A UFGS 43 21 39 Pumps: Water, Vertical Turbine R Compliance with CSI SectionFormat
Aug-2008 A UFGS 02 65 01.00 10 Underground Storage Tank Removal D Superseded by UFGS 02 65 00 (Preparing Activity: USACE) with same title Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2008 A UFGS 05 50 03.00 10 Metalwork Fabrication, Machine Work, Miscellaneous Provisions D Superseded by UFGS 05 50 14 Structural Metal Fabrications Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2008 A UFGS 05 50 04.00 10 Metals: Miscellaneous, Standard Articles, Shop Fabricated Items for Civil Works Structures D Superseded by UFGS 05 50 15 Civil Works Fabrications Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 35 00.00 10 Concrete Finishing R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 39 00.00 10 Concrete Curing R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 05 23 Welding, Structural D Superseded by UFGS 05 05 23.16 Structural Welding for compliance with MasterFormat. Also, major revision to comply with ICC IBC 2012. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 05 23.16 Structural Welding N Superseding UFGS 05 05 23 Welding, Structural for compliance with MasterFormat. Section also updated to comply with ICC IBC 2012
May-2014 A UFGS 05 50 14 Structural Metal Fabrications R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 50 15 Civil Works Fabrications R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning D Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 07 27 10.00 10 Building Air Barrier System N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 35 01 43 Wire Rope for Gate Operating Devices D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 01 70.13 Wire Rope for Gate Operating Devices. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2008 A UFGS 23 64 00.00 10 Liquid Chillers D Superseded by UFGS 23 64 00 Packaged Water Chillers, Absorption Type and UFGS 23 64 10 Water Chillers, Vapor Compression Type
Aug-2008 A UFGS 23 65 00.00 10 Cooling Tower D Superseded by UFGS 23 65 00 Cooling Towers
May-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices N Major revision of and superseding UFGS 35 01 43 Wire Rope for Gate Operating Devices
May-2014 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures N Major revision of and superseding UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures
May-2014 A UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 48 06 15 Turbine Oil N Full review, updates and superseding UFGS 48 13 19.00 10 Turbine Oil
May-2014 A UFGS 48 13 19.00 10 Turbine Oil D Superseded by UFGS 48 06 15 Turbine Oil. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 07 55 00 Protected Membrane Roofing (PMR) C 1 Energy efficiency requirements added
May-2014 A UFGS 11 44 00 Food Cooking Equipment C 1 Energy efficiency requirements added
May-2014 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) C 1 Clarified washer material requirements as noted in CCR 2605
May-2014 A UFGS 33 52 43.13 Aviation Fuel Piping C 1 Clarified washer material requirements as noted in CCR 2604
Feb-2014 A UFGS 01 42 15 Metric Measurements N New; Revision of UFGS 00 31 10 Metric Measurements which was deleted August 2013. Section is being reinstated and has been renumbered.

Pages