UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort ascending Change # Nature of Change or Revision
Aug-2010 A UFGS 09 69 13 Rigid Grid Access Flooring R Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry
Aug-2010 A UFGS 09 69 19 Stringerless Access Flooring R Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry
Aug-2010 A UFGS 09 72 00 Wallcoverings R Added GEI or SCS certification
Aug-2010 A UFGS 09 83 13 Acoustical Wall Coating R Added GEI or SCS certification
Aug-2010 N UFGS 09 90 00 Paints and Coatings R Added GEI or SCS certification and other minor revisions
Aug-2010 N UFGS 10 22 13 Wire Mesh Partitions R Added GEI or SCS certification
Aug-2010 A UFGS 10 22 19 Demountable and Moveable Partitions R Added GEI or SCS certification
Aug-2010 N UFGS 10 22 26.13 Accordion Folding Partitions R Added GEI or SCS certification
Aug-2010 N UFGS 10 22 26.23 Coiling Partitions R Added GEI or SCS certification
Aug-2010 A UFGS 10 22 26.33 Folding Panel Partitions R Added GEI or SCS certification
Aug-2010 A UFGS 10 22 26.43 Sliding Partitions R Added GEI or SCS certification
Aug-2010 A UFGS 10 26 13 Wall and Corner Guards R Added GEI or SCS certification
Aug-2010 A UFGS 12 21 00 Window Blinds R Added GEI or SCS certification
Aug-2010 N UFGS 12 22 00 Curtains and Drapes R Added GEI or SCS certification
Aug-2010 A UFGS 12 24 13 Roller Window Shades R Added GEI or SCS certification
Aug-2010 A UFGS 12 35 20 Foodservice Casework, Countertops, and Accessories R Added GEI or SCS certification
Aug-2010 A UFGS 12 35 70 Healthcare Casework R Added GEI or SCS certification
Aug-2010 A UFGS 14 24 00 Hydraulic Elevators R Total revision of 2.4 ELEVATOR DRIVE SYSTEM and 2.5 CONTROL EQUIPMENT
Aug-2010 S UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems R Added note and text in subpart 3.2.2; submittal article configuration compliance; other minor revisions throughout
Aug-2010 N UFGS 22 00 00 Plumbing, General Purpose R Revised subpart 2.1
Aug-2010 S UFGS 22 14 29 Sump Pumps R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 22 15 09 General Service Compressed-Air Systems Cleaning Procedures R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 22 15 14 General Service Compressed-Air Systems, Low Pressure R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 22 66 53 Laboratory Chemical-Waste and Vent Piping R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Added GEI or SCS certification; allow flexible elastomeric duct liner
Aug-2010 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods R Added GEI or SCS certification
Aug-2010 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems R Added GEI or SCS certification; CCR 3250
Aug-2010 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 23 73 13 Modular Indoor Central-Station Air-Handling Units R Revised General Note, deleted 1.2; submittal article compliance; Added subparts 1.3. 1.3.1, 1.3.2, 1.4, 1.5, 2.1and 3.8; other minor revisions throughout
Aug-2010 S UFGS 23 82 16 Air Coils R Added "Note" below Part 1 General; submittal article compliance; revised subpart 1.3 and 1.4; other minor revisions throughout
Aug-2010 S UFGS 23 82 19 Fan Coil Units R Submittal article compliance; other minor revisions throughout
Aug-2010 S UFGS 23 82 43 Electric Duct Heaters R Submittal article compliance; other minor revisions throughout
Aug-2010 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 09 23.00 40 Lighting Control Devices R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 23 00.00 40 Switchboards and Switchgear R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 24 16.00 40 Panelboards R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 24 19.00 40 Motor-Control Centers R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 26 35 33.00 40 Power Factor Correction Equipment R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements R Title changed to eliminate volume restriction; was Concrete Pavement for Airfields and Other Heavy-Duty Pavements More Than 10000 Cubic Yards
Aug-2010 S UFGS 32 31 13 Chain Link Fences and Gates R Submittal article compliance; Added subpart 1.5.2; other minor revisions throughout
Aug-2010 A UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System R Updated poured-in-place insulation requirements
Aug-2010 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Aug-2010 S UFGS 40 17 30.00 40 Welding General Piping R Submittal article compliance; Added subpart 1.5; revised subpart 3.3.2.1; other minor revisions throughout
Aug-2010 S UFGS 40 18 00 Vacuum Systems Process Piping R Standard tailoring for RCBEA incorporated; other minor revisions throughout
Nov-2009 N UFGS 01 30 00 Administrative Requirements R Deleted paragraph 1.15
Nov-2010 N UFGS 03 30 00 Cast-In-Place Concrete R Minor revisions in subparts 1.5, 2.4.6, 3.2.2, 3.2.3, 3.6.2
Nov-2010 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Transferred curing and finishing paragraphs to UFGS 03 39 00.00 10 Curing Concrete and UFGS 03 35 00 .00 10 Concrete Finishing
Nov-2010 N UFGS 05 12 00 Structural Steel R Revised note in subpart 1.4
Nov-2010 S UFGS 05 14 00.13 Welding Structural Aluminum Framing R Major maintenance throughout; submittal article compliance
Nov-2010 N UFGS 07 42 13 Metal Wall Panels R Minor revisions throughout
Nov-2010 A UFGS 07 81 00 Spray-Applied Fireproofing R Revised Fire Resistance Rating; added ICC-ES reports; revised material allowable UL rating
Nov-2010 A UFGS 09 69 13 Rigid Grid Access Flooring R Revised Air Leakage paragraph
Nov-2010 A UFGS 09 69 19 Stringerless Access Flooring R Revised Air Leakage paragraph
Nov-2010 N UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces R Revised paragraph 2.1.1
Nov-2010 S UFGS 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment R Revised General Note; added note below Part 1 General; submittal article compliance; other minor revisions
Nov-2010 S UFGS 23 09 13.34 Control Valves, Self-Contained R Major maintenance throughout; submittal article compliance; added subparts 1.4, 3.2 and 3.3
Nov-2010 S UFGS 23 22 25 Steam Valves R Major maintenance throughout; submittal article compliance
Nov-2010 S UFGS 23 36 00 Air Terminal Units R Major maintenance throughout; submittal article compliance; revised subparts 1.3, 3.3
Nov-2010 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Modified scope note; subpart 3.5 - separated combined table into one Metric and one English
Nov-2010 A UFGS 33 52 43.28 Filter Separator, Aviation Fueling System R Revised Coalescer and Separator Cartridges paragraph
Feb-2009 S UFGS 01 33 00 Submittal Procedures R Updated Standard Submittal Note
Feb-2009 N UFGS 01 35 26 Governmental Safety Requirements R Added 1.6.1.2
Feb-2009 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Revised 1.4.1
Feb-2009 A UFGS 04 20 00 Unit Masonry R Revised 2.17 Insulation
Feb-2009 A UFGS 07 81 00 Spray-Applied Fireproofing R Compliance with CSI SectionFormat
Feb-2009 N UFGS 08 81 00 Glazing R Revised 2.1.8.1
Feb-2009 A UFGS 09 65 00 Resilient Flooring R General update
Feb-2009 A UFGS 10 10 00 Visual Communications Specialties R Compliance with CSI SectionFormat
Feb-2009 A UFGS 10 14 02 Interior Signage R General update
Feb-2009 A UFGS 11 47 00 Ice Machines R Compliance with CSI SectionFormat
Feb-2009 A UFGS 11 68 13 Playground Equipment R Compliance with CSI SectionFormat
Feb-2009 A UFGS 11 71 00 Sterilizers and Associated Equipment R Compliance with CSI SectionFormat
Feb-2009 A UFGS 12 21 00 Window Blinds R General update
Feb-2009 A UFGS 12 24 13 Roller Window Shades R General update
Feb-2009 A UFGS 12 35 70 Healthcare Casework R Compliance with CSI SectionFormat
Feb-2009 A UFGS 12 50 00 Furniture Systems R General update
Feb-2009 A UFGS 12 93 00 Site Furnishings R Compliance with CSI SectionFormat
Feb-2009 A UFGS 13 49 19 X-Ray Shielding R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 21 13 Electric Traction Freight Elevators R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 21 23 Electric Traction Passenger Elevators R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 24 00 Hydraulic Elevators R Eliminated option for concrete plug to close well casing bottom
Feb-2009 A UFGS 14 92 00 Pneumatic-Tube System R Compliance with CSI SectionFormat
Feb-2009 A UFGS 21 21 03.00 10 Wet Chemical Fire Extinguishing System R Compliance with CSI SectionFormat
Feb-2009 N UFGS 22 00 00 Plumbing, General Purpose R Overall update
Feb-2009 A UFGS 22 13 36 Pneumatic Sewage Ejectors R Compliance with CSI SectionFormat
Feb-2009 S UFGS 22 15 13.16 High-Pressure Compressed-Air Piping, Piping Components, and Valves, Stainless R Section References (SRF) update
Feb-2009 S UFGS 22 15 14 General Service Compressed-Air Systems, Low Pressure R Section References (SRF) update
Feb-2009 A UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) R Compliance with CSI SectionFormat
Feb-2009 S UFGS 23 05 15 Common Piping for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 22 25 Steam Valves R Section References (SRF) update
Feb-2009 S UFGS 23 31 13 Metal Ducts R Section References (SRF) update

Pages