UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
May-2022 N UFGS 31 62 19 Timber Piles C 1 Per CCR 11709, removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.3)
May-2022 N UFGS 31 62 19.13 Timber Marine Piles C 2 Per CCR 11710, removed reference to UFGS 00 22 13.00 20 in BASIS OF BIDS paragraph (1.5)
May-2022 N UFGS 31 62 50 Densified Aggregate Piers C 1 Per CCR 11712, removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.3)
May-2022 N UFGS 31 63 26.60 [Grouted] Helical Piles C 1 Per CCR 11716, removed reference to UFGS 00 22 13.00 20 in Unit Price paragraph (1.4.3)
May-2022 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 1 Added technical requirement to second text paragraph in subpart 2.3.2.2 Load Block and Hook
Aug-2022 A UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites C 1 Incorporated CCR 8953.
Aug-2022 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Incorporated CCRs 10035, 10883, and 10885.
Aug-2022 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 2 Incorporated various CCRs.
Aug-2022 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 1 Incorporated various CCRs.
Aug-2022 N UFGS 01 58 00 Project Identification C 5 In response to CCR 11903, corrected placement of tailoring tags and updated specifier notes throughout.
Aug-2022 N UFGS 03 30 00 Cast-In-Place Concrete C 4 In response to the following CCRs: 10852, deleted paragraph Maximum Allowable Construction Joint Spacing (3.11.1) and list items a. and b.; 11572, updated Concrete Mix Design paragraph (1.6.1.2); 11445, updated Table under Sulfate Resistance paragraph (2.5.2.4 list item a.); 11120, removed list item b. under Reinforcement paragraph (6.2) and added list item e. under Epoxy-Coated Reinforcing Bars paragraph (2.6.1.2); and 11115, added ASTM A1094/A1094M to the Reference Article and as an option in paragraph Galvanized Reinforcing Bars (2.6.1.1) list item a.
Aug-2022 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment C 1 In response to CCR 11920, NASA tailoring was added to the Electrical Work paragraph (3.2.2)
Aug-2022 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 The May 2022 version of this Section has been made inactivate as it conflicted with FAR requirements; the February 2021 version has been reinstated with changes made to TEST KITS (subparts 2.6.1 and 2.6.2)
Nov-2022 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 6 Updated paragraph "Valves" (3.1.5) removed sentence regarding omitting isolation valves
Nov-2022 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 2 In response to various CCRs, including #11869, added ASME BPVC IX to "References" and "Welding Qualifications" paragraph (1.6.1); #11875 added API Std 650 to "Shell Height" paragraph (1.5.1.2), #11983 updated "Roof Perimeter Guardrail" paragraph (2.13.10) and added new Designer Note; #6124 removed wiper requirement and added non-corrosive materials for tape drum and cassette to "Mechanical Tape Level Gauge" (2.13.5) and (2.13.6) paragraphs; and #11261, revised opening Note to coordinate use of floating pans with UFC 3-460-01.
Nov-2022 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 2 Updated formatting with some changes to technical requirements.
Nov-2022 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 2 Vibration standards have been updated in the document and pump baseplate design updated to follow API standards
Nov-2022 F UFGS 32 31 13 Chain Link Fences and Gates C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2022 F UFGS 33 05 23.13 Utility Horizontal Directional Drilling C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2019 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2022 F UFGS 33 51 39 Monitoring Wells C Administrative Change: Preparing Activity changed from NASA to Air Force.
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Feb-2023 N UFGS 07 27 36 Spray Foam Air Barriers C 3 In response to CCR 12503, updated SUBMITTALS article and Prohibited Materials paragraph (2.1.5) to disallow all HFC blowing agents.
Feb-2023 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 4 In response to CCR 12504, updated SUBMITTALS article and SPRAY URETHANE FOAM paragraph (2.2) to disallow all HFC blowing agents.
Feb-2023 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley C 1 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, references, foreign standard practices, and provided clarifications.
Feb-2023 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 3 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, foreign standard practices, and provided clarifications.
Feb-2023 A UFGS 01 33 00 Submittal Procedures C Administrative Change: Preparing Activity changed from NASA to Army.
May-2023 N UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 N UFGS 10 44 16 Fire Extinguishers C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 A UFGS 08 33 23 Overhead Coiling Doors C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 08 34 73 Sound Control Door Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 23 82 Fireproof Gypsum Plastering C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 67 23.13 Standard Resinous Flooring C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 96 00 High-Performance Coatings C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 31 63 29 Drilled Concrete Piers and Shafts C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 02 42 51 Carpet Removal and Reclamation C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 07 41 63 Fabricated Roof Panel Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 3 Incorporated CCR 13056
Aug-2023 N UFGS 01 30 00 Administrative Requirements C 3 Revised benchmarks for NAVFAC partnering based on 11013.40B
Aug-2023 N UFGS 01 35 26 Governmental Safety Requirements C 4 In response to CCR 11849, "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17) has been relocated to this section from UFGS-01 45 00 QUALITY CONTROL. The references and submittals have also been updated to correspond with this new Article.
Aug-2023 N UFGS 01 91 00.15 Building Commissioning C 1 Clarified the language in COMMISSIONING FIRM paragraph (1.11)
Aug-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 5 In response to the following CCRs: 12710 - updated requirements in Testing Concrete Structure for Strength (1.14.3.9 - item d.); 12783 - updated Mixing (3.6.2) to align with current ASTM C94 and ACI 301; 12993 - updated table in Properties and Requirements (2.5.1, item i.) under column 'Miscellaneous Requirements,' row 'Lightweight concrete suspended slab' changed units to pounds per cubic foot; 13132 - updated submittal item to "Quality Control Program"; and 13205 - updated test intervals/requirements in paragraphs Slump Tests (3.14.3.1) and Compressive Strength Tests (3.14.3.3).
Aug-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 01 30.41 HVAC System Cleaning C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 05 15 Common Piping for HVAC C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 A UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 41 33 Precast Structural Pretensioned Concrete C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 47 13 Tilt-Up Concrete C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 05 14 00.13 Welding Structural Aluminum Framing C Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 01 42 00 Sources for Reference Publications C 1 Incorporated new organization Cool Roof Rating Council (CRRC)
Aug-2023 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems C 1 Incorporated various CCRs.
Aug-2023 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly C 1 Incorporated various CCRs
Aug-2023 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 3 Incorporated various CCRs
Nov-2023 N UFGS 03 62 16 Metallic Non-Shrink Grouting C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 51 00 Metal Stairs C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 52 00 Metal Railings C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 72 00 Decorative Metal Specialties C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 In response to CCR 13686, added "eOMSI" to the Definitions paragraph (1.1)
Nov-2023 N UFGS 01 91 00.15 Building Commissioning C 2 In response to CCR 13595, moved language related to warranty period requirements from PROJECT SCHEDULE paragraph (1.8) to CONSTRUCTION PHASE COMMISSIONING PLANS paragraph (3.7); added language for Air Force usage.
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 13850, edited Specifier Notes in Silica Fume paragraph (2.3.1.5) to clarify the use of silica fume; 13683, added requirement for ACI 301 in Concrete Mix Design paragraph (1.6.1.2)
Nov-2023 N UFGS 26 12 19.10 Three-Phase, Liquid-Filled Pad-Mounted Transformers C 2 Updated information in Related Materials: Three-Phase Pad-Mounted Transformer Details
Nov-2023 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 1 Updated information in Related Materials: Single-Phase Pad-Mounted Transformer Details; in response to CCRs 11442 and 14105, "ABB" has been updated to "ABB/Hitachi Energy in Reduced Submittal Requirements paragraph (1.4.2)
Nov-2023 N UFGS 31 31 16.13 Chemical Termite Control C 1 In response to CCR 13819, revised the Termiticides paragraph (2.2.1), as well as several minor edits
Nov-2023 N UFGS 33 11 00 Water Utility Distribution Piping C 2 In response to the following CCRs: 13045, updated paragraph reference in first Specifier Note of MATERIALS paragraph (2.1); and 13586, added paragraph Knife Gate Valves (2.1.2.3) and reference AWWA C520
Nov-2023 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment C 2 In response to CCR 13074, updated to imperative mood; removed "shall" from the Section text.
Nov-2023 A UFGS 06 18 00 Glued-Laminated Construction C Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 A UFGS 12 48 13 Entrance Floor Mats and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 A UFGS 03 37 29 Concrete for Concrete Cutoff Walls C 1 Incorporated CCR #12904.
Nov-2023 A UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving C 1 Incorporated CCR #13888.
Nov-2023 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C 1 Incorporated various CCRs.
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Updated language in Loss of Privilege (1.2.3) and RFIs Module (1.6.3) paragraphs
Feb-2024 N UFGS 03 30 00 Cast-In-Place Concrete C 7 In response to the following CCRs: 14190, "LEED NC" removed from the References and submittal items with "LEED NC" reference replaced with an "S" submittal tag; 14340 and 14341, updated list items under Blended Cements paragraph (2.3.1.2)
Feb-2024 N UFGS 23 05 15 Common Piping for HVAC C 1 Added NAVFAC only specifier note under PIPE AND FITTINGS paragraph (2.2)
Feb-2024 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 7 In response to CCRs 9060, 13651, and 14220, ‘Pump Discharge Valve’ (submittal and paragraph) has been removed from the section as it conflicted with UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems’.
Feb-2024 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles C 3 In response to CCR 12354, replaced "shall" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 2 In response to the following CCRs: 9547, brackets have been added around "Chloride Ion Concentration" paragraph (2.5.7) and "Chloride Ion Penetration" paragraph (2.5.8); 13020, updated referenced paragraph titles; and 13503, added new "Patching" subparagraph (3.2.10) under PILE DRIVING Article (3.2)
Feb-2024 N UFGS 31 62 13.26 Pressure-Injected Footings C 2 In response to CCR 13524, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.13 Steel Pipe Piles C 2 In response to the following CCRs:13021, updated referenced paragraph titles and 13714, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.16 Steel H-Piles C 2 In response to CCR 13022, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 19 Timber Piles C 2 In response to the following CCRs: 12473 and 13023, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 50 Densified Aggregate Piers C 2 In response to CCR 13026, updated referenced paragraph titles.
Feb-2024 N UFGS 31 63 26.60 [Grouted] Helical Piles C 2 In response to the following CCRs:13028, updated referenced paragraph titles; and 13715, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 33 01 30.16 TV Inspection of Sewer Lines C 1 In response to CCR 11690, section was updated to include side wall scanning (panoramic) cameras.
Feb-2024 N UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment C 1 In response to CCR 13725, updated to reduce the use of shall and change passive voice to active voice.
Aug-2017 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC D Archived to meet the requirement of 10 USC 2867 to adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military construction and military family housing activities. UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration was published to meet this requirement. The following UFGSs were also published to meet this requirement and superseded Section 23 09 23.13 20: 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC, 23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC, 23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, and 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2017 A UFGS 04 01 20.70 Unit Masonry Cleaning and Restoration D Superseded by UFGS 04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2017 S UFGS 26 56 23.00 40 Area Lighting D Section retired. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2017 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements D Superseded by UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements D Superseded by UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 01 26.71 Grooving for Airfield Pavements D Superseded by UFGS 32 01 18.71 Grooving of Airfield Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement D Pervious Bituminous Concrete Pavement lacks an acceptable industry standard and the majority of Installations do not have acceptable maintenance practices in place to perform required maintenance. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2017 A UFGS 32 12 10 Bituminous Tack and Prime Coats D Superseded by UFGS 32 12 13 with same title. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 S UFGS 01 75 00.00 40 Starting and Adjusting D This Section has been retired / Action Item from the Fall 2016 Specification DWG Meeting. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 02 53 13 Remediation of Contaminated Soils and Sludges by Incineration D UFGS archived. Outdated specification and no longer use incineration for contaminated soils. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.