Aug-2018 |
A |
UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems |
Aug-2018 |
R |
|
Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 |
A |
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.12 Aviation Fuel Pantographs |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.13 Aviation Fuel Piping |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.14 Aviation Fuel Control Valves |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.23 Aviation Fuel Pumps |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
A |
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System |
Aug-2018 |
R |
|
Complete review and update. |
Aug-2018 |
N |
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules |
Aug-2018 |
R |
|
Updated Scheduling software settings and requirements and tailoring. Added Design-Build Requirements. |
Aug-2018 |
N |
UFGS 05 12 00 Structural Steel |
Aug-2018 |
R |
|
This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications. |
Aug-2018 |
N |
UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish |
Aug-2018 |
R |
|
This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications. |
Aug-2018 |
N |
UFGS 26 32 13.00 20 Single Operation Generator Sets |
Aug-2018 |
R |
|
Revised to incorporate environmental updates to meet 40 CFR 112 requirements and to update spec format. |
Aug-2018 |
N |
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method |
Aug-2018 |
R |
|
This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications. |
Oct-2007 |
N |
UFGS 00 73 03 Supplementary Conditions for Azores Projects |
Oct-2007 |
R |
|
Renumbered paragraphs |
Oct-2007 |
N |
UFGS 01 35 29 Safety and Occupational Health Requirements |
Oct-2007 |
R |
|
Corrected organization in reference article |
Oct-2007 |
A |
UFGS 01 45 35 Special Inspections |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 56 13 Waste Containment Geomembrane |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 03 20 01.00 10 Concrete Reinforcement |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 03 41 33.00 10 Precast/Prestressed Concrete Floor and Roof Units |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 03 41 36.00 10 Precast Roof Decking |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 03 51 00 Roof Decking, Cast-in-Place Low Density Concrete |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 04 01 20 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using FRP Composite Structural Repointing |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 04 01 21 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using Surface Applied FRP Composites |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 04 20 00 Unit Masonry |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 04 21 13.13 Nonbearing Masonry Veneer/Steel Stud Walls |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
N |
UFGS 05 12 00 Structural Steel |
Oct-2007 |
R |
|
Updated AISC categories |
Oct-2007 |
A |
UFGS 07 84 00 Firestopping |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
N |
UFGS 08 71 00 Door Hardware |
Oct-2007 |
R |
|
Corrected paragraph entitled "Texture." |
Oct-2007 |
A |
UFGS 09 51 00 Acoustical Ceilings |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
N |
UFGS 10 22 26.13 Accordion Folding Partitions |
Oct-2007 |
R |
|
Added NASA requirements |
Oct-2007 |
A |
UFGS 11 24 27 Air Stripper |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 11 46 01.00 10 Food Service Equipment |
Oct-2007 |
R |
|
Revised in response to CCR's 1158 and 2063 |
Oct-2007 |
A |
UFGS 11 82 20 Incinerators, General Purpose |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 11 82 21 Medical Waste Incinerators |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 13 27 54.00 10 Electromagnetic (EM) Shielding |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 13 34 20 Metal Building Systems (Minor Requirements) |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 13 48 00.00 10 Seismic Protection for Mechanical Equipment |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 14 24 00 Hydraulic Elevators |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 21 13 24.00 10 Aqueous Film-Forming Foam (AFFF) Fire Protection System |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 22 04 00.00 10 Plumbing, Hospital |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 22 33 30.00 10 Solar Water Heating Equipment |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 07 00 Thermal Insulation for Mechanical Systems |
Oct-2007 |
R |
|
General revisions for pipe, duct and equipment |
Oct-2007 |
N |
UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems |
Oct-2007 |
R |
|
Change to paragraph entitled "Testing" (3.1.3) |
Oct-2007 |
A |
UFGS 23 10 00 Fuel Storage Systems |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 23 00 Refrigerant Piping |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 40 00.00 10 Chemical, Biological, and Radiological (CBR) Air Filtration System |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 52 00.00 10 Water and Steam Heating; Oil, Gas or Both; Up to 20 MBTUH |
Oct-2007 |
R |
|
Revised in response to CCR's 1574, 1577, 1582 and 1583 |
Oct-2007 |
A |
UFGS 23 52 43.00 10 Heat Recovery Boilers |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 63 00.00 10 Cold Storage Refrigeration Systems |
Oct-2007 |
R |
|
Revised in response to CCR 1590 |
Oct-2007 |
A |
UFGS 23 64 00.00 10 Liquid Chillers |
Oct-2007 |
R |
|
Revised in response to CCR 1585 |
Oct-2007 |
A |
UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 72 00.00 10 Energy Recovery Systems |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 23 82 02.00 10 Unitary Heating and Cooling Equipment |
Oct-2007 |
R |
|
Revised in response to CCR's 1591, 1592 and 1593 |
Oct-2007 |
A |
UFGS 26 05 48.00 10 Seismic Protection for Electrical Equipment |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 22 00.00 10 480-Volt Station Service Switchgear and Transformers |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 26 28 01.00 10 Coordinated Power System Protection |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 36 00.00 10 Automatic Transfer Switch and By-Pass/Isolation Switch |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 26 54 21.00 10 Helipad Lighting and Visual Navigation Aids |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 26 55 53.00 10 Exterior Lighting Including Security and CCTV Applications |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 27 52 32.00 10 Nurse Call Tone-Visual (NCTV) System |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 28 20 01.00 10 Electronic Security System |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
N |
UFGS 28 31 63.00 20 Analog/Addressable Interior Fire Alarm System |
Oct-2007 |
R |
|
Clarified paragraph entitled "Repair Service/Replacement Parts" (paragraph 2.1.2). |
Oct-2007 |
A |
UFGS 31 21 00 Off-Gassing Mitigation |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 31 62 16.00 10 Steel H-Piles |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 31 62 20.00 10 Round Timber Piles |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 31 62 23.13 Concrete-Filled Steel Piles |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 31 63 16 Augered Cast-In-Place Piles |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 31 63 26.00 10 Drilled Foundation Caissons (Piers) |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 32 32 23 Segmental Concrete Block Retaining Wall |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 33 16 15 Water Storage Steel Tanks |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 33 52 44 Aviation Fueling Systems |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 33 60 00.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 33 70 02.00 10 Electrical Distribution System, Underground |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 33 82 01 Intercommunication System |
Oct-2007 |
R |
|
Revised metrication |
Oct-2007 |
A |
UFGS 40 05 13 Pipelines, Liquid Process Piping |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 40 95 00 Process Control |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas |
Oct-2007 |
R |
|
Updated seismic criteria |
Oct-2007 |
A |
UFGS 43 13 13.13 Vapor Phase Activated Carbon Adsorption Units |
Oct-2007 |
R |
|
Updated seismic criteria |