UFC 4-151-10 General Criteria for Waterfront Construction, with Change 1  

Date: 
09-10-2001
Change / Revision Date: 
09-01-2012
Series: 
4 - MULTI-DISCIPLINARY AND FACILITY-SPECIFIC DESIGN
4-100: OPERATIONAL AND TRAINING FACILITIES
Status: 
Active

This UFC contains general criteria for the design of piling, deck, and substructure framing and bracing, and hardware and fittings for waterfront construction. Unless indicated otherwise, these criteria also apply to the design of offshore structures. This document, and all references contained herein, provides guidance primarily to DOD and U.S. Coast Guard activities. They may also be useful, however, to commercial firms that are engaged in the design and construction of waterfront facilities.

Page(s): 
40