Date:
07-15-2019
Series:
3 - DISCIPLINE-SPECIFIC CRITERIA
3-500: ELECTRICAL
Status:
Active
This UFC provides guidance for operation and maintenance of CP systems. It should be used by field personnel to perform scheduled inspections and preventive maintenance and to troubleshoot and repair CP systems. Information on non-routine field measurements is also included to enable technical assistance personnel to troubleshoot problems beyond the normal capability of field personnel to isolate or correct.