PG 18-15 - A/E Submission Requirements Volume DB, Major Design-Build Projects  

Date: 
04-01-2024

PG 18-15 Volume DB completely replaces all elements of PG 18-15 Volume E, Design-Build Projects: Request for Proposal, to follow PG 18-15 Volume B formatting. This replacement document provides detailed checklists outlining all elements of the AE design period deliverables for a major design-build project.

Topics: