PG 18-15 - A/E Submission Requirements Volume D - Cemetery Projects  

Date: 
12-01-2011

This document states the minimum requirements for each submission in the production of VA Master Plans, Schematic Design, Design Development, Construction Documents, and Record Documents for National Cemetery Projects. It will give VA reviewers and Architects and Engineers a clear understanding of the minimum submission requirements of the A/E, including level of detail expected for each stage of design, itemized for each discipline. The A/E Submission Instructions is one part of the project design contracting documents, which also includes the Statement of Work and VA and NCA design criteria.

Page(s): 
72