UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Actionsort descending Change # Nature of Change or Revision
Nov-2008 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices N Superseding UFGS 26 05 73.00 40 Overcurrent Protective Devices
Nov-2008 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers N New section - towards unification
Nov-2008 S UFGS 26 23 00.00 40 Switchboards and Switchgear N New section - towards unification
Nov-2013 N UFGS 26 41 00 Lightning Protection System N Superseding UFGS 26 41 00.00 20 Lightning Protection System and UFGS 26 41 01.00 10 Lightning Protection System
Nov-2008 S UFGS 26 51 00.00 40 Interior Lighting N Superseding UFGS 26 51 13.08 40 Incandescent Lighting
Nov-2008 S UFGS 26 53 00.00 40 Exit Signs N Renumbered; Superseding UFGS 26 53 00 Exit Signs
Nov-2008 S UFGS 26 55 53 Security Lighting N New section - towards unification
Nov-2008 S UFGS 26 56 13.00 40 Lighting Poles and Standards N New - towards unification
Nov-2008 S UFGS 26 56 23.00 40 Area Lighting N New - towards unification
Nov-2008 S UFGS 27 05 28.36 40 Cable Trays for Communications Systems N Renumbered; Superseding UFGS 27 05 28.36 Cable Trays for Communications Systems
Nov-2008 S UFGS 27 13 23.00 40 Communications Optical Backbone Cabling N Superseding UFGS 40 95 33.23 40 Fiber Optic Process Control Networks
Nov-2008 S UFGS 27 21 00.00 40 Intercommunication System N Superseding UFGS 40 95 33.23 40 Fiber Optic Process Control Networks
Nov-2008 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System N Superseding UFGS 40 95 33.23 40 Fiber Optic Process Control Networks
Nov-2008 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems N Superseding UFGS 28 31 53.00 40 Fire Alarm Initiating Devices
Nov-2008 A UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving N Combine/disassembly of sections; Superseding UFGS 32 01 28 and UFGS 32 01 29.61 with no title change; Preparing Activity was NAVFAC
Nov-2008 A UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines N Superseding UFGS 33 51 00.00 20 Natural Gas Distribution and UFGS 33 51 03.00 10 Gas Distribution System
Nov-2008 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution N Superseding UFGS 26 26 00.00 40 Power Distribution Units and UFGS 33 71 39.13 40 Overhead High-Voltage Wiring
Nov-2008 S UFGS 42 22 00 Process Chillers and Coolers N Renumbered; Superseding UFGS 42 22 00.00 40 with same title
Nov-2008 A UFGS 48 13 19.00 10 Turbine Oil N New section
May-2017 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) N New Section
Nov-2016 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) N Superseding UFGS 01 45 00.10 10 Quality Control System (QCS); Total review and update.
Nov-2016 A UFGS 06 17 19 Cross-Laminated Timber N New Section
Aug-2015 N UFGS 33 05 23 Trenchless Utility Installation N New UFGS Section; Superseding UFGS 33 05 23.19 Trenchless Excavating using Microtunneling
May-2014 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly N New UFGS section
Nov-2011 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) N New UFGS section; superseding NAVFAC Design Build section 01 78 24.05 20 dated Nov 2010
May-2015 A UFGS 05 21 00 Steel Joist Framing N Consolidate related sections. New UFGS superseding UFGS 05 21 13 Deep Longspan Steel Joist Framing, UFGS 05 21 16 Longspan Steel Joist Framing, UFGS 05 21 19 Open Web Steel Joist Framing, and UFGS 05 21 23 Steel Joist Girder Framing
May-2015 N UFGS 26 24 13 Switchboards N This is a "NEW" guide specification section number that, in part, replaces UFGS 26 23 00 Switchboards and Switchgear. The original guide specification was separated into two specifications: UFGS 26 23 00, Low Voltage Switchgear and UFGS 26 24 13 Switchboards, and both sections have also had a complete technical update.
May-2015 N UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems N New section
May-2015 A UFGS 33 56 19 Fuel Impermeable Liner System N Superseding UFGS 33 56 63 Fuel Impermeable Liner System; Complete review and update
Aug-2011 A UFGS 27 05 29.00 10 Protective Distribution System (PDS) for SIPRNET Communication Systems N New section
Aug-2011 A UFGS 33 57 00 Bulk Fuel Receiving / Dispensing Equipment N New section superseding UFGS 33 52 44 Aviation Fueling Systems, UFGS 33 52 13 Exterior Fuel Distribution, and UFGS 33 52 43.00 20 Aviation Fuel Distribution and Dispensing
May-2011 A UFGS 10 22 39 Folding Panel Partitions N Renumbered/Superseding UFGS 10 22 26.33 without revision to comply with MF 2010
May-2011 A UFGS 10 22 43 Sliding Partitions N Renumbered/Superseding UFGS 10 22 26.43 without revision to comply with MF 2010
May-2011 A UFGS 27 51 23.10 Intercommunication System N Renumbered/Superseding UFGS 33 82 01 without revision to comply with MF 2010
May-2011 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) N New section superseding UFGS 33 52 13 Exterior Fuel Distribution and UFGS 33 52 43.00 20 Aviation Fuel Distribution and Dispensing
May-2012 A UFGS 07 27 00.45 10 Building Air Barrier System N New section
Feb-2012 A UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] N Superseding UFGS 08 62 00 Skylights
Feb-2012 N UFGS 32 01 13.00 20 Emulsified Asphalt Seal Coats [with] [without] Aggregate N New UFGS section
Feb-2011 N UFGS 13 17 43 Hydrotherapy Equipment N Superseding UFGS 44 44 46 Hydrotherapy Equipment without revision to comply with MF 2010
Feb-2011 S UFGS 22 07 19.00 40 Plumbing Piping Insulation N Renumbered to NASA fifth level; Superseding UFGS 22 07 19 with no title change
Feb-2011 A UFGS 22 13 29 Sanitary Sewerage Pumps N Superseding UFGS 44 46 00 Pumps; Sewage and Sludge without revision to comply with MF 2010
Feb-2011 S UFGS 22 14 29.00 Sump Pumps N Renumbered to NASA fifth level; Superseding UFGS 22 14 29 with no title change; CCR #544 comments have been incorporated
Feb-2011 S UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures N Renumbered to NASA fifth level; Superseding UFGS 22 15 09 with no title change; CCR #545 comments have been incorporated
Feb-2011 S UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless N Renumbered to NASA fifth level; Superseding UFGS 22 15 13.16 with no title change
Feb-2011 S UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure N Renumbered to NASA fifth level; Superseding UFGS 22 15 14 with no title change
Feb-2011 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping N Renumbered to NASA fifth level; Superseding UFGS 22 66 53 with no title change
Feb-2011 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment N Renumbered to NASA fifth level; Superseding UFGS 23 05 48 with no title change
Feb-2011 S UFGS 23 09 13.34 40 Control Valves, Self-Contained N Renumbered to NASA fifth level; Superseding UFGS 23 09 13.34 with no title change
Feb-2011 S UFGS 23 22 13.35 40 Steam Traps N Renumbered to NASA fifth level; Superseding UFGS 23 22 13.35 with no title change
Feb-2011 S UFGS 23 22 23.00 40 Steam Condensate Pumps N Renumbered to NASA fifth level; Superseding UFGS 23 22 23 with no title change
Feb-2011 S UFGS 23 22 25.00 40 Steam Valves N Renumbered to NASA fifth level; Superseding UFGS 23 22 25 with no title change
Feb-2011 S UFGS 23 31 13.00 40 Metal Ducts N Renumbered to NASA fifth level; Superseding UFGS 23 31 13 with no title change
Nov-2011 N UFGS 32 13 43 Pervious Concrete Paving N New UFGS section
Feb-2011 S UFGS 23 34 23.00 40 HVAC Power Ventilators N Renumbered to NASA fifth level; Superseding UFGS 23 34 23 with no title change
Feb-2011 S UFGS 23 36 00.00 40 Air Terminal Units N Renumbered to NASA fifth level; Superseding UFGS 23 36 00 with no title change; CCR #574 comments have been incorporated
Feb-2011 S UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units N Renumbered to NASA fifth level; Superseding UFGS 22 14 29 with no title change; CCR #604 comments have been incorporated
Feb-2011 S UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting N Renumbered to NASA fifth level; Superseding UFGS 23 74 33 with no title change
Feb-2011 S UFGS 23 82 16.00 40 Air Coils N Renumbered to NASA fifth level; Superseding UFGS 23 82 16 with no title change
Feb-2011 S UFGS 23 82 19.00 40 Fan Coil Units N Renumbered to NASA fifth level; Superseding UFGS 23 82 19 with no title change
Aug-2008 S UFGS 23 82 23 Unit Ventilators N Renumbered; Superseding UFGS 23 82 23.00 40 with same title; Minor Edits
Feb-2011 S UFGS 23 82 23.00 40 Unit Ventilators N Renumbered to NASA fifth level; Superseding UFGS 23 82 23 with no title change
Feb-2011 S UFGS 23 82 43.00 40 Electric Duct Heaters N Renumbered to NASA fifth level; Superseding UFGS 23 82 43 with no title change
Feb-2011 S UFGS 23 82 46.00 40 Electric Unit Heaters N Renumbered to NASA fifth level; Superseding UFGS 23 82 46 with no title change
Feb-2011 N UFGS 26 27 14.00 20 Electricity Metering N New section
Feb-2011 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping N Renumbered to NASA fifth level; Superseding UFGS 40 18 00 with no title change
Feb-2011 S UFGS 42 22 00.00 40 Process Chillers and Coolers N Renumbered to NASA fifth level; Superseding UFGS 42 22 00 with no title change
Feb-2011 S UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers N Renumbered to NASA fifth level; Superseding UFGS 42 22 13 with no title change
Feb-2011 S UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers N Renumbered to NASA fifth level; Superseding UFGS 42 22 16 with no title change
Feb-2011 S UFGS 42 23 13.00 40 Process Condensers N Superseding UFGS 42 23 13 Process Condensers; Renumbered to NASA fifth level and titled changed from Processed Condensers
Feb-2011 S UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels N Renumbered to NASA fifth level; Superseding UFGS 43 41 16.16 with no title change
Feb-2011 A UFGS 44 13 52 Thermal (Catalytic) Oxidation Systems N Superseding UFGS 44 11 33 Thermal (Catalytic) Oxidation Systems without revision to comply with MF 2010
Feb-2011 A UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical N Superseding UFGS 44 41 13 Packaged Wastewater Treatment Equipment, Biochemical without revision to comply with MF 2010
Feb-2011 A UFGS 46 07 53.19 Composting Toilet N Superseding UFGS 44 41 13.19 Composting Toilet without revision to comply with MF 2010
Feb-2011 A UFGS 46 51 00.00 10 Air and Gas Diffusion System N Superseding UFGS 44 42 13.00 10 Air Supply and Diffusion Equipment for Sewage Treatment without revision to comply with MF 2010
Feb-2011 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration N Superseding UFGS 44 42 13.00 20 Aeration Equipment without revision to comply with MF 2010
Feb-2011 N UFGS 46 43 21 Circular Clarifier Equipment N Superseding UFGS 44 42 23 Circular Clarifier Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 24 16 Comminutors N Superseding UFGS 44 42 26 Comminutors without revision to comply with MF 2010
Feb-2011 N UFGS 46 23 00 Grit Removal and Handling Equipment N Superseding UFGS 44 42 39 Grit Removal and Handling Equipment without revision to comply with MF 2010
Feb-2011 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators N Superseding UFGS 44 42 53 Parallel Plate [or Vertical Tube] Gravity Oil-Water Separator without revision to comply with MF 2010
Feb-2011 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System N Superseding UFGS 44 42 59 Continuous Loop Reactor Wastewater Treatment System without revision to comply with MF 2010
Feb-2011 A UFGS 46 61 00 Filtration Equipment N Superseding UFGS 44 43 00 Filtration Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 30 13 Advanced Oxidation Processes (AOP) N Superseding UFGS 44 44 53 Advanced Oxidation Processes (AOP) without revision to comply with MF 2010
Feb-2011 A UFGS 46 66 56 Open-Channel Disinfection Equipment N Superseding UFGS 44 44 73 Ultraviolet Disinfection Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 71 16 Gravity Belt Thickeners N Superseding UFGS 44 43 13 Sludge-Collecting Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System N Superseding UFGS 44 46 19 Sludge-Digester Gas, Heating, and Mixing System without revision to comply with MF 2010
Feb-2011 A UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks N Superseding UFGS 44 46 20 Floating Cover for Sludge-Digestion Tanks without revision to comply with MF 2010
Feb-2011 A UFGS 46 76 23.16 Recessed Chamber Filter Presses N Superseding UFGS 44 46 16 Recessed Chamber Filter Press System without revision to comply with MF 2010
Feb-2011 A UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder N Superseding UFGS 22 13 23 Sewage Bar Screen and Mechanical Shredder without revision to comply with MF 2010
Aug-2018 A UFGS 02 62 13.00 10 Air and Steam Stripping N Superseding UFGS 11 24 27 AIR STRIPPER. Complete review and update including section number and title changes.
Aug-2018 A UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems N Superseding UFGS 02 01 50 OPERATION, MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change.
Aug-2018 A UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems N Superseding UFGS 02 62 16 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change.
Aug-2018 A UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures N Superseding UFGS 05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES. Complete review and update including section number change.
Aug-2018 A UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping N Superseding UFGS 33 34 00 FORCE MAINS AND INVERTED SIPHONS; SEWER. Complete review and update including section number and title changes.
Aug-2018 A UFGS 33 34 56.00 10 Drainage Field Dosing Chambers N Superseding UFGS 33 34 13 SIPHONS, DOSING. Complete review and update including section number and title changes.
Aug-2018 A UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures N New UFGS section.
Aug-2018 A UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters N Superseding UFGS 43 31 13.14 DOWNFLOW LIQUID ACTIVATED CARBON ADSORPTION UNITS. Complete review and update including section number and title changes.
Oct-2007 A UFGS 01 50 00 Temporary Construction Facilities and Controls N Superseding UFGS 01 50 00.00 20 Temporary Facilities and Controls, UFGS 01 50 00.00 40 Temporary Facilities and Controls, and UFGS 01 50 02.00 10 Temporary Construction Facilities
Oct-2007 N UFGS 10 22 26.23 Coiling Partitions N New section
Oct-2007 A UFGS 10 22 26.33 Folding Panel Partitions N New section; Superseding UFGS 10 22 26 Operable Partitions
Oct-2007 A UFGS 10 22 26.43 Sliding Partitions N New section; Superseding UFGS 10 22 26 Operable Partitions